CN-550000-C9K56-00020000.pdf
PDF 211 KB Posted
- Contract number
- C9K56
- Issued by
- Florida
About this file
This document is an Amendment No. 2 to a Standard Professional Services Agreement between the State of Florida Department of Transportation and WBQ Design & Engineering, Inc., with McKim & Creed, Inc. added as a sub-consultant. The contract relates to the South Pomegranate Avenue project in Seminole County, specifically covering the extension from W. 8th Street to W. 1st Street (SR 46), with the original contract executed on June 16, 2015.
The amendment adds mapping services (Activity 29) to be performed by McKim & Creed, Inc., extends the project service period to June 15, 2018, and provides an additional lump sum amount of $80,656.00. The total maximum limiting amount for all services under the original agreement as supplemented is $2,276,762.00. The project involves extending Pomegranate Avenue in Sanford, Florida, including creating a new stop sign controlled "T" intersection, reconstructing 8th Street, and providing for a grade-separated overpasses over the CSX railroad spur. The scope includes creating control survey maps, right of way maps, and other necessary documentation for the roadway and bridge alignment project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9K56-00010000.pdf.crdownload | CRDOWNLOAD file | |
| CN-550000-C9K56-00050000.pdf | ||
| CN-550000-BD630-L0070000.pdf | ||
| CN-550000-C9K56-00030000.pdf | ||
| CN-550000-C9K56-00040000.pdf | ||
| CN-550000-C9K56-00070000.pdf | ||
| CN-550000-C9K56.pdf | ||
| CN-550000-C9K56-00010000.pdf | ||
| CN-550000-C9K56-00060000.pdf | ||
| CN-550000-C9K56-00080000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .