This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), contract number C-9H87, with Parsons Brinckerhoff, Inc., a consulting firm located in Tampa, Florida. The task work order (No. 7) is specifically for the Payment FM No. 25910911223 and involves professional transportation consulting services.

The task work order authorizes Parsons Brinckerhoff to provide support for the Alternative Analysis of the I-275 Corridor from North of Martin Luther King Jr. Boulevard to Bearss Avenue. The total contract amount is $134,139.00, with compensation based on loaded billing rates. The work includes developing a typical section package for roadway design, preparing a drainage feasibility memorandum, reviewing cost estimates, and conducting highway safety analysis. The services are intended to provide quick turnaround for the FDOT's Design and Planning offices, with the consultant expected to begin work on short notice. The total authorizations to date for this project financial number are $857,311.00, and the services are to be completed by 2/16/2020.

View the file

Other files

File Type Posted
CN-550000-ASR45.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAÎÊ OÉ FLORIOA OÉPAFTIiENTOF ÍRÂN3PC}RTAT{ON

TASK WORK ORDER FOR PROFESSIONAL SERVICES

t7543trz5

PROCUREME¡IT

10t11

Prg. 1 o,8

Consultant ParsonsBrinckerùoñ, lnc.

2202 North West Shorø Boulevard Suile 300 Tampa, FL 33607

Address:

Attn: Bob Clitrord

(To be entered upon executlon of T,W.O.)

Date: l'utrt^-l.- .F ra r l¡

Task Work Order No.: 7

Contraci Nð. GgH87 t

Payment FM No.: 25910911223

Brief Task Descdpllon:

Support for the Altemalive Analysis for the þ275 Conidor from North of Martin Luther King Jr. Blvd. to Bearss Avenue ln accordance wilh the above refarenced conlrac!, Vou ¡re aulhorized to perform the tasks detailed in atlached Exhlbit A (Scope of Seruices). All esrvíces requlred under lhls Task Work Order will ba compløted on or before: 2lßn0z' The total amount of tha llmiting amount of lhe compensation will be: $134,f 39.00

Compcnsatlon alemsnt¡ are as followc:

Element Descrlptlon Method of Gompcnaatlon Amount Est'

Ses Attachmant B ,r-A{, unrts ì¡yorK€g at Kraoe,o DlilFlg tïltgg tn taDþ 6

$134,139.tr

Pagc I Total $134,139.00

Paga2thru 6 Subtotal

Total $134,139.0(

Other Notes:

Conidor Studies, SuÞArea Studles and Speclal Traneportalion StudlEs (continuing)

Total authorizations to date: for FPN 2591091'1223 only.

I olal aunorizat¡ons to clats (¡ncludlng this one):

$857,311.00

Oaparlmental Approval:

Rebecca L. Schwarz (title)(name) lsignatufi')

ManaqerProcurement

Consultant Acceptancc:

Robert M. Clifford Vice President (name) (title) (signature) of

Distribution AndrewTyrell TammyWaltz ctTs DTFSGontractDocs

FPN: 259109-l-12-23 Contract No. C-9H87

Tnsk tvVork Ordcr No. 7

ATTACIIMENT..A"

SCOPE OF SERVICES

SPECIAL TRANSPORTATION STUDIES

r. OBJECTIVE

The objective of this tasking is to provide quick turn-around for services to support the altemative analysis for the I-275 conidor from North of Martin Luther King Jr. Boulevard to Bearss Avenue.

lI. SERVICES

The purpose of this task is to assist the Department in performing miscellaneous services that require a quick response and short tum-around to support the offices of Design and Planning.

For assignments under this taslç the consultant should be prepared to begin work when the assignments are specified, which in most cases will be with short advanced notice. While most of the assignments will be of short duration, the specific time-frame for the completion of each assignment will be established by the Department's Project Manager when thé task is specified.

Work elements include:

o Development of a typical section package showing three l2-ft General Use Lanes (GUL) with a l0-ft outside shoulder, al}-fr Express Lane (EL) with a 2-ft buffer and lO-ft inside shoulder in each direction with a barrier separated rnedian.

r Preparation of a drainage feasibility memorandum; including a high-level pond siting analysis with associated right-o$way (ROW) impacts and estimated costs.

o Preparation and review of cost estimates; including a benefit cost analysis.

. Analysis utilizing Highway Safety Manual (HSM) methodology in support of a design exception fortwo I l-ft GUL and an I l-ft EL. Additionall¡ analysis supporting a variation for a 9-ft inside shoulder will be provided.

Assumptions:

o No changes to the substandard vertical geometry or vertical clearances will be implemented. Design Exceptions prepared under a separate conhact will be required.

I No changes to substandard horizontal alignment or border width will be implemented.

Design Variations prepared under a separate contract will be required.

Iü. LENCTH OF SERVIVE

All services on this Task Work Order will be conducted in accordance with a schedule to be established by the Department's Project Manager.

A-l August 15,2A16