This document is an Amendment (No. 4) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and T.Y. Lin International. The original contract (C-9F28) was initially executed on May 23, 2014, and pertains to the design of State Road 97 bridge replacement over Sandy Hollow Creek (Bridge No. 480018) in Escambia County.

The amendment increases compensation by $37,871 for Plans Update Services, bringing the total established for these services to $42,871 and raising the Total Maximum Limiting Amount to $705,463. The supplemental services include specification preparation, re-staking survey baseline, reviewing plans for standard changes, additional submittals for bidability review, and final document updates. The amendment covers various technical aspects such as roadway analysis, drainage analysis, structures design, survey work, and mapping modifications, with a focus on updating plans, implementing new design standards, and addressing driveway-related changes. The contract remains in effect through completion of all required services or for a ten-year term from the original execution date, whichever occurs first.

View the file

Other files

File Type Posted
CN-550000-C9F28-00040000.pdf PDF
CN-550000-C9F28-S0030000.pdf PDF
CN-550000-ASA18-W0010000.pdf PDF
CN-550000-C9F28-00020000.pdf PDF
CN-550000-C9F28-00030000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9F28-S0010000.pdf PDF
CN-550000-C9F28.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Florida Department of Transportation

AMENDMENT

TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

Amendment No.: 4 Execution Date:

Original Contract No.: C-9F28 Original Execution Date: May 23, 2014 Consultant Name: T.Y. Lin International Agreement Description: Design of SR 97 over Sandy Hollow Creek (Bridge No. 480018) in Escambia County Purpose of Amendment: Increase funds for additional Plans Update

The terms of the original agreement, referenced above, are hereby amended as follows:

This Supplemental Amendment provides compensation to the Consultant for additional Plans Update Services requested by the Department including but not limited to, specification preparation, re-staking survey baseline, review of plans for standard changes, additional submittals for bidability review and final documents. For details of these services see the “Scope of Services”, attached hereto and made a part hereof.

The terms of the original agreement, referenced above, are hereby amended as follows:

Item 2.1, Summary of Compensation of Exhibit “B”, Method of Compensation, of the original Agreement is amended as follows:

For Financial Project No. 42551923201, Plans Update Services (LA 4) is increased by $37,871 bringing the total established for Plans Update Services (LA 4) to $42,871 and the Total Maximum Limiting Amount established for this project and said Agreement to $705,463.

Compensation is to be paid in accordance with Exhibit “B” of the original agreement, except as specified above, and in Contract Compensation Summary, attached hereto and made a part hereof.

The provisions of said Agreement, and any amendments thereto, shall remain in full force and effect through completion of all services required of the consultant or a ten (10) year term from the date of the execution of said agreement, whichever occurs first.

The following attachments are hereby incorporated into this agreement:

Contract Compensation Summary, Page 2 Scope of Services, Page 3-9

T.Y. LIN INTERNATIONAL STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

BY: BY:

Jared Perdue, P.E.

(Name) (Name)

Director of Transportation Development (Title) (Title)

Professional Services Review: Legal Review:

DocuSign Envelope ID: 976CAA6E-19F2-4FE5-ADCA-9C91C801AF05

Original Agreement (Executed 5/23/2014) Amendment No.1 (Executed 7/28/2014);

Amendment No. 2 (Executed 11/25/2015); Amendment No. 3 (Executed 9/14/2016):

Financial Project No. 42551923201 Estimate or

F.A.P. No. 0031 071 Limit

Basic Services Including Direct Expenses (LS 2) $439,308 Limit

Environmental Services (LA 4) $35,276 Limit

Geotechnical Services (LA 4) $60,881 Limit

Survey Services (LA 4) $127,127 Limit

Plans Update (LA 4) $5,000 Limit

Total Maximum Limiting Amount $667,592

Amendment No. 4:

Financial Project No. 42551923201 Estimate or

F.A.P. No. 0031 071 Limit

Basic Services Including Direct Expenses (LS 2) $0 Limit

Environmental Services (LA 4) $0 Limit

Geotechnical Services (LA 4) $0 Limit

Survey Services (LA 4) $0 Limit

Plans Update (LA 4) $37,871 Limit

Total Maximum Limiting Amount $37,871

Original Agreement (Executed 5/23/2014) Amendment No.1 (Executed 7/28/2014);

Amendment No. 2 (Executed 11/25/2015); Amendment No. 3 (Executed 9/14/2016);

Amendment No. 4:

Financial Project No. 42551923201 Estimate or

F.A.P. No. 0031 071 Limit

Basic Services Including Direct Expenses (LS 2) $439,308 Limit

Environmental Services (LA 4) $35,276 Limit

Geotechnical Services (LA 4) $60,881 Limit

Survey Services (LA 4) $127,127 Limit

Plans Update (LA 4) $42,871 Limit

Total Maximum Limiting Amount $705,463

Contract Compensation Summary