CN-550000-C9B49-S0020000.pdf
PDF 168 KB Posted
- Contract number
- C9B49
- Issued by
- Florida
About this file
This document is an Amendment (No. 2) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Comprehensive Engineering Services, Inc., specifically related to the SR 527 Orange Avenue project at Holden and Gatlin Avenue in Orange County, Florida. The original contract (C-9B49) was executed on June 6, 2013, and this amendment is dated December 12, 2015, involving coordination with Orange County, Orlando Utilities Commission, and FPL Fibernet.
The amendment adds design services and fees, extending the project completion date to June 15, 2018, and increasing the Maximum Limiting Amount to $633,357.00 (an additional $21,302.00). The specific services include utility coordination efforts with FPL Fibernet, identifying an additional utility within project limits, and coordinating with Orange County and Orlando Utilities Commission to develop utility relocation plans via Utility Work by Highway Contractor. The contract involves tasks such as obtaining a Utility Work Schedule, developing coordination plans, and ensuring proposed maintenance of traffic plans can accommodate utility relocations. The fee summary shows basic services for Comprehensive Engineering Services, Inc. and subconsultants, with costs allocated across various service categories including right-of-way mapping, survey services, and geotechnical services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9B49-S0010000.pdf | ||
| ContractDeliverablesExport (1).csv | CSV file | |
| CN-550000-C9B49-00020000.pdf | ||
| CN-550000-C9T59-W0020100.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .