CN-550000-C9B49-S0010000.pdf
PDF 192 KB Posted
- Contract number
- C9B49
- Issued by
- Florida
About this file
This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Comprehensive Engineering Services, Inc. The amendment pertains to the SR 527 Orange Avenue project at Holden and Gatlin Avenue in Orange County, Florida, with the original contract dated June 6, 2013, and this amendment executed on October 17, 2014.
The amendment increases the Maximum Limiting Amount to $612,055.00, with additional design services focused on replacing existing signals at Gatlin and Holden Avenues with mast arm signals, conducting geotechnical investigations, and adding Intelligent Transportation Systems (ITS) connections between the intersections. The contract modification includes two primary tasks: Task A involves replacing existing signals and obtaining geotechnical investigation recommendations, and Task B involves adding ITS infrastructure between the Gatlin and Holden Avenue intersections. The amendment adjusts the contract fees, with Comprehensive Engineering Services, Inc. receiving an additional $10,810.00 for basic services and $12,932.00 for geotechnical services, bringing the total contract value to $470,925.00 for lump sum amounts and $612,055.00 for the total maximum limiting amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9T59-W0020100.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-C9B49-00020000.pdf | ||
| CN-550000-C9B49-S0020000.pdf | ||
| ContractDeliverablesExport (1).csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .