This document is an Amendment (No. 4) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Johnson, Mirmiran & Thompson, Inc., with the original contract dating back to April 18, 2006. The amendment involves multiple subconsultants, including GMB Engineers & Planners, Lotspeich & Associates, Lochrane Engineering, Jones Wood & Gentry, Nodarse & Associates, and Aerial Cartographics of America, Inc.
The amendment provides for additional design survey, geotechnical investigation, environmental evaluation, and final design services for the I-95 corridor from SR 50 to North of SR 46, specifically focusing on redesigning a 12-acre pond (Pond 5) and adding two additional retention ponds in the northwest quadrant. The total contract value is increased by $184,437, bringing the overall contract total to $3,528,189. Key tasks include survey work, topographical mapping, planimetric data collection, utility coordination, environmental investigations, and preparing detailed design drawings. All services are to be completed by April 24, 2012, with the consultant responsible for various technical aspects including storm sewer system modifications, drainage calculations, and permit adjustments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C8J17-00020000.pdf | ||
| CN-550000-C8J17.pdf.crdownload | CRDOWNLOAD file | |
| CN-550000-C9435-S0020000.pdf | ||
| CN-550000-C8J17-00010000.pdf | ||
| CN-550000-C8J17-S0010000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .