This document is an Amendment (No. 1) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Johnson, Mirmiran & Thompson, Inc., originally executed on April 18, 2006. The amendment relates to the I-95 widening project from SR 50 to North of SR 46, involving multiple sub-consultants including GMB Engineers & Planners, Lotspeich & Associates, Lochrane Engineering, Jones Wood & Gentry, Nodarse & Associates, and Aerial Cartographics of America.

The amendment adds additional services for final design and plan production, including design of an additional retention/detention pond, four lateral ramp ponds, an outfall control structure, and storm sewer system for Basin 7A. The total contract compensation is increased by $275,893, bringing the revised contract total to $3,343,752.00. The additional services encompass comprehensive design work, drainage calculations, topographic and geotechnical investigations, archaeological and environmental studies, right-of-way maps, and TCP design for the I-95/SR 46 Interchange. The amendment was executed on November 16, 2007, and incorporates detailed scope modifications based on policy changes by the SJRWMD (St. Johns River Water Management District).

View the file

Other files

File Type Posted
CN-550000-C9435-S0020000.pdf PDF
CN-550000-C8J17-00020000.pdf PDF
CN-550000-C8J17.pdf.crdownload CRDOWNLOAD file
CN-550000-C8J17-00010000.pdf PDF
CN-550000-C8J17-S0020000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .