CN-550000-ASW00-W0010000.pdf
PDF 3 MB Posted
- Contract number
- ASW00
- Issued by
- Florida
About this file
This document is a Railroad Radio Keydown Agreement between the Florida Department of Transportation (FDOT) and CSX Transportation, Inc., located in the state of Florida, specifically in Hillsborough County and the city of Tampa. The agreement involves the installation of radio keydown features at eight railroad grade crossing locations along Polk Street, ranging from East Jefferson Street to Ashley Street.
The contract is valued at $119,580, with 100% of the costs to be covered by the agency (FDOT). The project involves installing radio key down equipment and traffic control devices at the specified railroad crossings, with work to be completed by railroad forces. The agreement is effective from March 20, 2023, and extends until December 31, 2050. The scope includes materials procurement, installation, and associated engineering services, with signal and communications work being a primary component. The project is federally authorized, with a federal share of 97.13% and a state share of 2.87%, and is classified as a rail safety construction project to upgrade electronics at the crossing signals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASS20-W0050100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
11201 N. McKinley Drive Tampa, FL 33612
JERED W. PERDUE P.E.
SECRETARY
www.fdot.gov
MEMORANDUM
Date: March 21, 2023
To: Justin Hall, Director of Transportation Development
From: Ming Gao, P.E., Intermodal Systems Development Manager
By Kenneth Madden, District Rail Administrator
Subject: RAILROAD RADIO KEYDOWN AGREEMENT
FPID: 451433-1-57-01
Polk Street from East Jefferson Street to Ashley Street
Hillsborough County
Please review the enclosed Railroad Radio Keydown Agreement and place initials and signature in the appropriate locations on the agreement.
Once you have provided the appropriate signature, please return this package to the Rail Section for further processing. Any questions feel free to contact Kenneth Madden, District Rail Administrator or David Grillo, Rail Coordinator (GEC) for additional information.
2. The DEPARTMENT hereby agrees to reimburse the COMP ANY, as detailed in this Agreement, for all costs incurred in the purchase of materials for the installation, in accordance with the provisions above indicated in the Federal Highway Administration Reimbursement Policy, and any supplements thereto or revisions thereto.
3. Attached hereto, and by this reference made a part hereof, are plans and specifications of the work to be performed by the COMP ANY pursuant to the terms hereof, and an estimate of the cost there of in amount of $ 119,580 . All materials installed by the COMP ANY pursuant hereto, shall be installed according to these plans and specifications as approved by the DEPARTMENT; the Federal Highway Administration, if federal aid participating; and all subsequent plan changes shall likewise be approved by the DEPARTMENT and, when applicable, the Federal Highway Administration.
4. All labor, services and equipment furnished by the COMPANY in carrying out the work to be performed hereunder shall be at " NO COST " to the DEPARTMENT.
5. Upon completion of the work the COMPANY shall, within one hundred eighty (180) days, furnish the DEPARTMENT with a copy of its final and complete billing for all materials installed in connection with the work performed hereunder, such statement to follow as closely as possible the order of the items contained in the estimate attached hereto. All cost records and accounts shall be subject to audit by a representative of the DEPARTMENT. Upon receipt of invoices, prepared in accordance with the provisions of the above indicated Reimbursement Policy, the DEPARTMENT agrees to reimburse the COMPANY in the amount of such actual costs consistent with the terms of this Agreement.
6. Payment shall be made only after receipt and approval of goods and services unless advance payments are authorized by the State Comptroller under Section 215.422 (14), Florida Statutes.
7. In accordance with Section 287 .058, Florida Statutes, the following provisions are included in this Agreement:
If this Contract involves units of deliverables, then such units must be received and accepted in writing by the Contract Manager prior to payment.
The DEPARTMENT reserves the right to unilaterally cancel this Agreement for refusal by the Contractor to allow public access to all documents, papers, letters, or other material subject to the provision of Chapter 119, Florida Statutes and made or received in conjunction with this Agreement.
Bills for fees or other compensation for services or expenses shall be submitted in detail sufficient for a proper pre-audit and post-audit thereof.
KNPBAGD
Text Box
8. In accordance with Section 215.422, Florida Statutes, the following provisions are included in this Agreement:
Contractors providing goods and services to the Department should be aware of the following time frames. Upon receipt, the Department has five (5) working days to inspect and approve the goods and services, unless the Agreement specifies otherwise. The Department has 20 days to deliver a request for payment (voucher) to the Department of Banking and Finance. The 20 days are measured from the latter of the invoice is received or the goods or services are received, inspected and approved. The warrant in payment of an invoice submitted to an agency of the State shall be issued not later than 10 days after filing of the voucher authorizing payment.
If a payment is not issued within 40 days, a separate interest penalty at a rate as established pursuant to Section 215.422(3)(b), Florida Statutes, will be due and payable, in addition to the invoice amount, to the Contractor. Interest penalties of less than one (1) dollar will not be enforced unless Contractor requests payment. The invoice payment requirements do not start until a properly completed invoice is provided to the Department.
A vendor Ombudsman has been established within the Department of Banking and Finance. The duties of this individual include acting as an advocate for contractors/vendors who may be experiencing problems in obtaining timely payment(s) from a state agency. The Vendor Ombudsman may be contacted at (850) 410-9724 or by calling the State Comptroller's Hotline, 1-800-848-3792.
9. Records of costs incurred under terms of this Agreement shall be maintained and made available upon request to the DEPARTMENT during the period of this Agreement and for three years after final payment is made. Copies of these documents and records shall be furnished to the DEPARTMENT upon request. Records of costs incurred includes the Contractor's general accounting records and the project records, together with supporting documents and records, of the Contractor and all subcontractors performing work on the project, and all other records of the Contractor and subcontractors considered necessary by the DEPARTMENT for a proper audit of costs.
10. In the event this contract is for services in excess of TWENTY FIVE-THOUSAND DOLLARS ($25,000.00) and a term for a period for more than one year, the provisions of Section 339.135(6)(a), Florida Statutes, are hereby incorporated:
The Department, during any fiscal year, shall not expend money, incur any liability, or enter into any contract which, by its terms, involves the expenditure of money in excess o f the amounts budgeted as available for expenditure during such fiscal year. Any contract, verbal or written, made in violation of this subsection is null and void, and no money may be paid on such contract. The Department shall require a statement from the Comptroller of the Department that such funds are available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall prevent the making of contracts for periods exceeding one year, but any contract so made shall be executory for the value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated verbatim in all contracts of the Department which are for an amount in excess of TWENTY FIVE-THOUSAND DOLLARS ($25,000.00) and which have a term for a period of more than one year.
11. In accordance with Section 287.133(2)(a), Florida Statutes, the following provisions are included in this agreement:
A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity may not submit a bid on a contract to provide any goods or services to a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list.
12. In accordance with Section 287 .0582, Florida Statutes, the following provision is included in this agreement:
The State of Florida's performance obligation to pay un.;.;der this contract is contingent upon an annual appropriation by the Legislature.
KNPBAGD
Text Box
Attachment A - Polk Street Intersections Crossing Number
Intersecting Road
County Milepost Parcel Number
626294U N. Jefferson Street
Hillsborough 882.27 10020-
SIGA
626295B N. Pierce Street
Hillsborough 882.33 10020-
SIGA
626296H N. Morgan Street
Hillsborough 882.38 10020-
SIGA
626297P N. Marion Street
Hillsborough 882.44 10020-
SIGA
626298W N. Florida Avenue
Hillsborough 882.49 10020-
SIGA
626299D N. Franklin Street
Hillsborough 882.55 10020-
SIGA
626300V N. Tampa Street
Hillsborough 882.60 10020-
SIGA
626301C N. Ashley Drive
Hillsborough 882.66 10503-
7 Hillsborough626294U
PUBLIC HWY
N JEFFERSON ST
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.952100 -82.460000
Key Downs, Cable, Crossbucks, Pavement Markings, Back-Up Battery
60-90 DEG
1100 (2020) 1 (2020) 6 (2019)
Divided Highway
YES
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
LED
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 01/01/1952
CITY
YES
YES
YES
YES
YES
YES
NO
Excellent LOS B = Uneven
LOS B = Vibrating LOS A = No Reaction
LOS A = Smooth
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A301
882.27
Asphalt & Timber
Freight
Pole Replacement
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626295B
PUBLIC HWY
PIERCE ST
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.951800 -82.460000
Key Downs, Cable, Crossbucks, Pavement Markings
60-90 DEG
1100 (2020) 1 (2020) 1 (2020)
Divided Highway
YES
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
LED
YES
YES
Simultaneous Preemption
NO
-- 01/01/1952
CITY
YES
YES
YES
YES
YES
YES
NO
Excellent LOS C = Minor Erosion
LOS C = Shaking LOS A = No Reaction
LOS A = Smooth
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A301
882.33
Asphalt & Timber
Freight
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626296H
PUBLIC HWY
N MORGAN ST
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.951500 -82.460000
Key Downs, Cable, Crossbucks, Pavement Markings, Tree Removal at
60-90 DEG
1350 (2020) 8 (2020) 1 (2020)
Divided Highway
YES
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
LED
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 01/01/1952
CITY
YES
YES
YES
YES
YES
YES
NO
Excellent LOS A = Smooth
LOS B = Vibrating LOS A = No Reaction
LOS A = Smooth
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A301
882.38
Asphalt & Timber
Freight
Intersection, Pole Replacement
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
Stop Lines
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626297P
PUBLIC HWY
N MARION ST
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.951200 -82.460000
Key Downs, Cable, Crossbucks, Pavement Markings, Tree Removal at
60-90 DEG
1100 (2020) 1 (2020) 9 (2019)
Divided Highway
NO
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
Other None
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 01/01/1952
CITY
YES
YES
YES
YES
YES
YES
NO
Excellent LOS A = Smooth
LOS A = No Reaction LOS A = No Reaction
LOS B = Uneven
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A301
882.44
Freight
Intersection
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
Asphalt
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626298W
PUBLIC HWY
N FLORIDA AVE
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.951000 -82.460000
Key Downs, Cable, Crossbucks, Pavement Markings, Remove Trees, 60-90 DEG
16500 (2020) 3 (2020) 1 (2020)
One-Way Street
NO
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
LED
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 01/01/1952
STATE
YES
YES
YES
YES
YES
YES
NO
Excellent LOS A = Smooth
LOS A = No Reaction LOS A = No Reaction
LOS A = Smooth
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A 301
882.49
Freight
One On Each Side of the Intersection
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
US 41B
SR 685
Asphalt
Tree Blocking Motorist View of Crossing & Signs
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626299D
PUBLIC HWY
N FRANKLIN ST
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.950700 -82.460000
Key Downs, Cable, Crossbucks, Pavement Markings for Brick Street
60-90 DEG
1100 (2020) 1 (2020) 2 (2019)
Two-Way Street
No
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
LED
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 05/01/1991
CITY
YES
YES
YES
YES
YES
YES
NO
Excellent LOS A = Smooth
LOS A = No Reaction LOS A = No Reaction
LOS A = Smooth
FL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A301
882.55
Asphalt & Timber
Freight
Tree Removal at Intersection
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
Dynamic Envelope
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626300V
PUBLIC HWY
N TAMPA ST
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.937700 -82.110000
Key Downs, Cable, Crossbucks, Tree Removal at Intersection on Both
60-90 DEG
13000 (2020) 4 (2020) 1 (2020)
One Way Street
NO
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
Backlights, Incandescent
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 01/01/1952
STATE
YES
YES
YES
YES
YES
YES
NO
Excellent LOS A = Smooth
LOS A = No Reaction LOS A = No Reaction
LOS A = Smooth
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A 301
882.60
Asphalt
Freight
Sides Of the Street
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
SR 685
US 41B
Trees Blocking Motorists View of Crossing & Signs
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
7 Hillsborough626301C
PUBLIC HWY
N ASHLEY DR
AT GRADE Commercial Tampa IN CITY OPEN - TRACK ACTIVE
5/5/2021
27.950100 -82.460000
Key Downs, Cable, Crossbucks, Restripe Pavement Markings, Tree
60-90 DEG
26000 (2020) 8 (2020) 1 (2020)
Divided Highway
NO
YES
YES
NO
NO
05-10 0/2
03/31/2011
NO
NO
None None
BACKLIGHTS LED
YES
YES
For Traffic Signals
Simultaneous Preemption
NO
-- 01/01/1952
CITY
YES
YES
YES
YES
YES
YES
NO
Good LOS A = Smooth
LOS A = No Reaction LOS A = No Reaction
LOS A = Smooth
CFL&G&P
CSX
JACKSONVILLE
TAMPA TERMINAL
A 301
882.66
Asphalt
Freight
Removal at Intersection, Lollipop Signs Replacement
NOO
(1) Spur/Lead
David Grillo - FDOT RAIL Mike Brown - FDOT Scott Willis - CSX Jordan Eady - FDOT CO Kevin Renew - CSX Rob Thompson - CSX
Railroad Markings Worn Out, Close Pedestrian Crossing West of Ashley
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box
KNPBAGD
Text Box DoesTraffic Queue Across the Tracks
KNPBAGD
Text Box Traffic Signals Controlling?
KNPBAGD
Text Box
NO
KNPBAGD
Text Box
ACCT. CODE : 709 - TBD Form Revision 09/29/20
ESTIMATE SUBJECT TO REVISION AFTER: 4/8/2023 DOT NO.: Various CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Tampa Terminal MILE POST: Various
AGENCY PROJECT NUMBER: 0
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services 6,500$
Subtotal 6,500$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 6,500$
Subtotal 6,500$
FLAGGING SERVICE: (Contract Labor)
70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$
50 Labor (Foreman/Inspector) 0 Days @ 504.00$ -$
70 Additive 137.00% (Transportation Department) -$ 50 Additive 160.00% (Engineering Department) -$
Subtotal -$
SIGNAL & COMMUNICATIONS WORK: 78,985$
TRACK WORK: -$
PROJECT SUBTOTAL: 91,985$
900 CONTINGENCIES: 30.00% 27,595$
PROJECT TOTAL: ***************************************************** 119,580$
CURRENT AUTHORIZED BUDGET: ***************************************************** -$ TOTAL SUPPLEMENT REQUESTED: ***************************************************** 119,580$
DIVISION OF COST:
Agency 100.00% 119,580$ Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
C Powell Approved by: KSW CSXT Public Project Group
DATE: 04/08/22 REVISED: 01/00/00 DATE: 04/08/22
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
Tampa DESCRIPTION: Order of Magnatude Estimate for Installation of DTMFradios at (8) crossing locations. 626301C, N.
Ashley Dr.; 626299D, N. Franklin St.; 626294U, N. Jefferson St.; 626297P, N. Marion St.; 626296H, N.
Morgan St.; 626295B, Pierce st.; 626298W; US-41B/SR-685; 626300V; US-41B/SR-685; 626302J
ACCT. CODE : 709 - TBD Form Revision
Pub EB - FL EB3 (FL) 09/29/20
ESTIMATE SUBJECT TO REVISION AFTER: 4/8/2023 DOT NO.: Various
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Tampa Terminal MILEPOST: Various
DRAWING NO.: __ DRAWING DATE: __
AGENCY PROJECT NUMBER:
PRELIMINARY ENGINEERING:
Contracted & Administrative Engineering Services 6,500$
Subtotal 6,500$
CONSTRUCTION ENGINEERING/INSPECTION:
Contracted & Administrative Engineering Services 6,500$ Subtotal 6,500$
FLAGGING SERVICE: (Contract Labor)
Labor (Conductor-Flagman) 0 Days @ 350.00$ -$
Labor (Foreman/Inspector) 0 Days @ 504.00$ -$
Additive 137.00% (Transportation Department) -$
Additive 160.00% (Engineering Department) -$ Subtotal -$
COMMUNICATIONS WORK:
Temporary (Details Attached) -$
Permanent (Details Attached) -$
Subtotal -$
TRACK: LABOR
Traffic Control 0 MAN-HRS 42.00$ -$
Remove Existing Crossing 0 MAN-HRS 42.00$ -$
Renew Cross Ties 0 MAN-HRS 42.00$ -$
Renew Rail 0 MAN-HRS 42.00$ -$
Install OTM 0 MAN-HRS 42.00$ -$
Install Field Welds 0 MAN-HRS 42.00$ -$
Install Geo-Textile Fabric 0 MAN-HRS 42.00$ -$
Install Sub-Drains 0 MAN-HRS 42.00$ -$
Install Ballast 0 MAN-HRS 42.00$ -$
Line and Surface 0 MAN-HRS 42.00$ -$
Install Crossing Materials 0 MAN-HRS 42.00$ -$
Install Bituminous Pavement 0 MAN-HRS 42.00$ -$
______________________ 0 MAN-HRS 42.00$ -$
______________________ 0 MAN-HRS 42.00$ -$
______________________ 0 MAN-HRS 42.00$ -$
Clean-Up 0 MAN-HRS 42.00$ -$
Additive 160.00% -$ Subtotal -$
TRACK: MATERIAL
Cross Ties, Main Line 0 EA 44.00$ -$
Cross tie - pre-plated Not to be used for Public Projec 0 EA -$ -$
Cross-tie - Borate 0 EA 56.00$ -$ Crossties, 10' Length 0 EA 55.00$ -$ Tie plates 0 EA 10.51$ -$
DESCRIPTION: Order of Magnatude Estimate for Installation of DTMFradios at (8) crossing locations. 626301C, N. Ashley Dr.; 626299D, N. Franklin St.; 626294U, N. Jefferson St.; 626297P, N. Marion St.; 626296H, N. Morgan St.;
626295B, Pierce st.; 626298W; US-41B/SR-685; 626300V; US-41B/SR-685; 626302J
Tampa
Rail, 136RE, New 0 LF 21.00$ -$
Misc. OTM 0 LOT -$ -$
Geo-Textile Fabric 0 RL 930.00$ -$
Sub-Drains 0 LF 6.00$ -$
Ballast - Car load 0 NT 12.00$ -$
Ballast - Trucked in 0 NT 45.00$ -$
Field Welds 0 EA 100.00$ -$
______________________ 0 ___ -$ -$
______________________ 0 ___ -$ -$
Concrete Full Width 0 TF 250.00$ -$
Concrete/Rubber Xing (CSX) 0 TF 200.00$ -$
Rubber Crossing, Full Depth 0 TF 325.00$ -$
Timber/Asphalt Crossing (CSX Standard) 0 TF 42.00$ -$
Bituminous Material 0 NT -$
Sales Tax on Material 7.00% -$
Material Handling 15.00% -$ Subtotal -$
CONTRACT:
Asphalt Paving (In Place) 0 NT 165.00$ -$
Disposal of Waste Materials 0 TF 15.00$ -$
Maintenance of Traffic 0 DAY 350.00$ -$
Subtotal -$
EQUIPMENT RENTAL: CSX vehicle and equipment rental included in overhead percentage -$ Subtotal Use for extraordinary rental or unique Service Contract -$
WORK TRAIN: 0 DAY 2,100.00$ -$
Subtotal -$
SALVAGE:
Rail 0 NT 65.00$ -$
OTM 0 NT 75.00$ -$
Subtotal -$
SIGNAL WORK:
Material - Field & Consumables 14,342$
Material - Sales Tax 1,004$
Material - Shop -$
Construction Labor 15,300$
Shop Labor -$
RR Engineering,Preliminary 445$
RR Engineering,Construction 2,295$
Additives to Construction Labor 22,644$
Additives to Shop Labor -$
Additives to Engineering -$
Equipment Expense -$
Waste Management 96$
Contract Engineering 20,798$
Freight 2,061$
AC Power Service -$
Salvage -$
Other -$
Subtotal 78,985$
PROJECT SUBTOTAL: 91,985$
CONTINGENCIES: 30.00% 27,595$
PROJECT TOTAL: ***************************************************** 119,580$
CURRENT AUTHORIZED BUDGET: ***************************************************** -$ TOTAL SUPPLEMENT REQUESTED: ***************************************************** 119,580$
DIVISION OF COST:
Agency 100.00% 119,580$ Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Director - CSXT Public Projects, Jacksonville, Florida
Estimated prepared by: C Powell Approved by: KSW Project Manager - Public Projects
DATE: 04/08/22 REVISED: DATE: 04/08/22
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASW00
3/21/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 3/21/2023
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55072020727
Expansion Option: AA
Object Code: 563000
Amount: $119,580.00
Financial Project: 45143315701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2023
Budget Entity: 55100100
Category/Category Year: 088808/23
Amendment ID: W001
Sequence: 00
User Assigned ID: RKWA
Enc Line (6s)/Status: 0001/04
Total Amount: $119,580.00
Contract: ASW00
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 03/20/2023
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Installation of Radio Keydown Equipment in CSX Right of Way
Page1 of 1
To: David.Grillo@dot.state.fl.us
| OOM Estimate - DTMF 8 Tampa Locations.pdf |
| Project Summary Sheet |
| Force Account Worksheet |
File details come from the government source that posted it. Updated .