CN-550000-ASU98-W0010000.pdf
PDF 2 MB Posted
- Contract number
- CA058
- Issued by
- Florida
About this file
This document is a Railroad Reimbursement Master Agreement between the State of Florida Department of Transportation and CSX Transportation, Inc., a corporation organized under the laws of Virginia with its principal place of business in Jacksonville, Florida. The agreement is dated September 15, 1998, and establishes a framework for collaborative work involving railroad crossings, right-of-way projects, and preliminary engineering services across various locations in the state.
The specific change order (Change Order No. 1) relates to a project on USB 41/North 22nd Street in Hillsborough County, with a financial project number of 445720-1-57-01. The change order authorizes CSX Transportation to perform preliminary engineering, construction engineering and inspection (CEI), and flagging services, including sidewalk repairs and median improvements. The total estimated cost of the change order is $287,418.00, which will be 100% funded by the agency through District Dedicated Revenue. The work is associated with Crossing #626925T and is based on a full crossing closure during railroad force work. The agreement includes provisions for Buy America requirements, employment eligibility verification, and is set to run until December 31, 2050.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CA058-00020000.pdf | ||
| CN-550000-CA058-00030000.pdf | ||
| CN-550000-CA058-A0010200.pdf | ||
| CN-550000-CA058-A0010400.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CA058-A0010000.pdf | ||
| CN-550000-CA058-A0010600.pdf | ||
| CN-550000-CA058-00040000.pdf | ||
| CN-550000-CA058-A0010300.pdf | ||
| CN-550000-CA058.pdf | ||
| CN-550000-CA058-A0010100.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04B
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W Number
FAP
Number
445720-1-57-01 USB 41/NORTH 22ND
STREET HILLSBOROUGH 10250-SIGM N/A
A. 1. The CSX Transportation Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary Engineering, CEI & Flagging Services. This Change Order covers the repairs to the existing sidewalk, median repairs, construction, and all other work deemed necessary to complete the project.
Crossing # 626925T - RRMP: S843.95
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated 09/15/1998 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in
Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 Preliminary Engineering CEI & 287,418.00 Flagging Services
Sub-Totals ………………………………………………………………… $ $287,418.00 Net Cost of Construction Changes, this order ………………………... $ $287,418.00 Cost of Construction Changes, previously ordered ………………….. $ $ Net Total Cost of Construction Changes, to date…………………………………………….. $287,418.00 Contract Amount ………………………………………………………………………………… $ Estimated Cost of Work Authorized, to date………………………………………………….. $287,418.00
Examined as to provisions and participating items of cost:
Recommended: Approved: Approved:
Date
Kenneth Madden
District 7 Rail Administrator
Director of Transportation Development Richard Moss
Division Administrator N/A Federal Highway Administration
DocuSign Envelope ID: 151594FC-76A7-4ACB-ABC1-E514C98E06C9
1/3/2023 | 11:25 AM EST 1/4/2023 | 9:06 AM EST
OGC – 1/21
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 1/21
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 1/21
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASU98
12/28/2022
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 12/28/2022
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $287,418.00
Financial Project: 44572015701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2023
Budget Entity: 55150200
Category/Category Year: 088716/23
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $287,418.00
Contract: ASU98
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 12/15/2022
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Intersection Improvement Project Adjacent to & Within CSX ROW
Page1 of 1
To: David.Grillo@dot.state.fl.us
ACCT. CODE : 709 - FL2741 Form Revision 12/22/21
BUY AMERICA
ESTIMATE SUBJECT TO REVISION AFTER: 12/1/2023 DOT NO.: 626925T
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Tampa Terminal MILE POST: S 843.96
AGENCY PROJECT NUMBER: FDOT 437304-1-57-01 (ASK64) / 445720-1-52-02
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services 17,000$
Subtotal 17,000$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 91,000$
Subtotal 91,000$
FLAGGING SERVICE: (Contract Labor)
70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$
50 Labor (Foreman/Inspector) 80 Days @ 955.50$ 76,440$
70 Additive 137.00% (Transportation Department) -$ 50 Additive 160.00% (Engineering Department) 122,304$
Subtotal 198,744$
SIGNAL & COMMUNICATIONS WORK: -$
TRACK WORK: -$
PROJECT SUBTOTAL: 306,744$
900 CONTINGENCIES: 10.00% 30,674$
PROJECT TOTAL: ***************************************************** 337,418$
CURRENT AUTHORIZED BUDGET: ***************************************************** 50,000$ TOTAL SUPPLEMENT REQUESTED: ***************************************************** 287,418$
DIVISION OF COST:
Agency 100.00% 287,418$ Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
Benesch - CDS Approved by: KSW CSXT Public Project Group
DATE: 12/01/22 REVISED: 01/00/00 DATE: 12/06/22
Tampa DESCRIPTION: Construction Engineering & Inspection and (Nighttime) Flagging Services for raised median improvements, sidewalk repairs, and directional bore at North 22nd Street within the CSXT right of way.
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
File details come from the government source that posted it. Updated .