This document is a Railroad Change Order No. 1 issued by the State of Florida Department of Transportation (FDOT) for a project involving CSX TRANSPORTATION Company in Hillsborough County. The change order relates to a Master Agreement originally dated 8/7/1972 and covers roadway rehabilitation and sidewalk construction adjacent to the CSX Right of Way, specifically involving two railroad crossings: Crossing #624773S at Paseo Del Mar Boulevard and Crossing #624780C at US 41/SR 45.
The change order authorizes work with an estimated cost of $55,178.00, which will be 100% funded by the agency using Advance Construction (NHPP) Federal Funds (90%) and District Dedicated Revenue State Funds (10%). The work includes preliminary engineering, construction engineering and inspection, and flagging services for roadway milling, resurfacing, striping, pipe boring, and sidewalk construction. Tampa Electric Company (TECO) is noted as responsible for CEI & Flagging Services for one of the crossings. The project is reimbursable under the Force Account Method and is part of Financial Project Number 441387-1-57-01, with work to be completed by 12/31/2050.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASS19-00020000.pdf | ||
| CN-550000-ASS19-00030000.pdf | ||
| CN-550000-ASS19-00010000.pdf | ||
| CN-550000-CAI72-00110000.pdf | ||
| CN-550000-ASS19-W0020000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04B
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
441387-1-57-01
US 41/SR 45 & PASEO
DEL MAR BOULEVARD
HILLSBOROUGH
10500-XSOB &
10060-2211 D720 029 B
A. 1. The CSX TRANSPORTATION Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Resurfacing and roadway rehabilitation and sidewalk construction for a project adjacent to the CSX Right of Way. This change order covers all work deemend necessary to complete the project.
*Crossing #624773S, Paseo Del Mar Boulevard, RRMP: AZA 892.96 *Crossing #624780C, US 41/SR 45, RRMP: AZA 890.00 Note: Tampa Electric Company (TECO) is responsible to the CEI & Flagging Services for Crossing #624780C, RRMP AZA 890.00, a permitted spur that crosses US 41 to the North.
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original
Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated
8/7/1972 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 Construction, Flagging & CEI 1 55,178.00
Sub-Totals ………………………………………………………………… $ $55,178.00
Net Cost of Construction Changes, this order ………………………... $ $55,178.00
Cost of Construction Changes, previously ordered ………………….. $ $0.00
Net Total Cost of Construction Changes, to date…………………………………………….. $55,178.00
Contract Amount ………………………………………………………………………………… $0.00
Estimated Cost of Work Authorized, to date………………………………………………….. $55,178.00
Examined as to provisions and participating items of cost:
Recommended: Approved: Approved:
Date Date Date
Kenneth Madden District 7 Rail Administrator
Richard Moss PE Director of Transportation
Development
Division Administrator N/A
Federal Highway Administration
DocuSign Envelope ID: 7D300E40-5C79-438B-A462-D44FDE3D59BB
5/3/2022 | 9:44 AM EDT 5/3/2022 | 9:48 AM EDT
725-090-04B
RAIL
OGC 1/21
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC 1/21
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that inclu delivery date.
OGC 1/21
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
ACCT. CODE : 709 - FL2596 Form Revision 12/22/21
BUY AMERICA
ESTIMATE SUBJECT TO REVISION AFTER: 4/22/2023 DOT NO.: 624773S/624780C
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Palmetto MILE POST: AZA 892.96
AGENCY PROJECT NUMBER: FDOT 441387-1-57-01 (ASG16) AZA 890.00
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services 16,000$
Subtotal 16,000$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 27,200$
Subtotal 27,200$
FLAGGING SERVICE: (Contract Labor)
70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$
50 Labor (Foreman/Inspector) 40 Days @ 504.00$ 20,160$
70 Additive 137.00% (Transportation Department) -$ 50 Additive 160.00% (Engineering Department) 32,256$
Subtotal 52,416$
SIGNAL & COMMUNICATIONS WORK: -$
TRACK WORK: -$
PROJECT SUBTOTAL: 95,616$
900 CONTINGENCIES: 10.00% 9,562$
PROJECT TOTAL: ***************************************************** 105,178$
CURRENT AUTHORIZED BUDGET: ***************************************************** 50,000$ TOTAL SUPPLEMENT REQUESTED: ***************************************************** 55,178$
DIVISION OF COST:
Agency 100.00% 55,178$ Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
Benesch - CDS Approved by: KSW CSXT Public Project Group
DATE: 04/22/22 REVISED: 01/00/00 DATE: 04/25/22
Tampa DESCRIPTION: Preliminary Engineering, Construction Engineering & Inspection, and Flagging Services for roadway miling, resurfacing, striping with dynamic envelope, pipe boring, and sidewalk construction at Apollo Beach Blvd (6243773S/AZA 892.96) and roadway milling, resurfacing, and striping with dynamic envelope at US 41/SR 45 (624780C/AZA 890.00) all within the CSXT right of way.
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASS19
4/29/2022
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 4/29/2022
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $55,178.00
Financial Project: 44138715701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2022
Budget Entity: 55150200
Category/Category Year: 088716/22
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $55,178.00
Contract: ASS19
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 04/27/2022
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: PE, CEI & Flagging Services for Resurfacing Project Adjacentto CSX Rail
Page1 of 1
To: David.Grillo@dot.state.fl.us
441387-1 - Project Location Map - Crossing# 624773S
441387-1 - Project Location Map - Crossing# 624780C
File details come from the government source that posted it. Updated .