This document is a Railroad Change Order Number 3 issued by the Florida Department of Transportation (FDOT) for a bridge replacement project involving CSX Transportation Inc. The contract is for work on I-75 (SR 93A) in Hillsborough County, with a specific crossing location at DOT Number 621453G and Railroad Milepost 874.10. The original agreement dates back to August 29, 1979, and this change order is being processed under a Crossing Surface agreement type.

The change order authorizes additional work for Preliminary Engineering (PE), Construction Engineering and Inspection (CEI), and Flagging services for a bridge replacement project over CSX Rail. The total project cost is $1,313,846, with this change order adding $382,670 to the previously authorized amount of $931,176. The project is federally funded, specifically through the Advanced Construction NHPP (Federal - 90%) and District Dedicated Revenue (State - 10%). The work is to be reimbursed using the Force Account Method, and the project is scheduled to run from March 29, 2022, to December 31, 2050. The funding will cover all necessary services to complete the bridge replacement, including engineering, inspection, and railroad flagging services.

View the file

Other files

File Type Posted
CN-550000-ASR93-W0010000.pdf PDF
CN-360000-A0933-Ext 2.pdf PDF
CN-550000-ASR93-00010000.pdf PDF
CN-550000-ASR93-00020000.pdf PDF
CN-550000-ASR93-00030000.pdf PDF
CN-550000-ASR93-W0020000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

RAILROAD CHANGE ORDER NUMBER 3

725-090-04A

RAIL

OGC – 12/23

Financial Project ID Roadway Description County Roadway ID Contract ID 429251-1-57-01 I-75 (SR 93A) Hillsborough 10075000 ASR93

A. 1. The CSX Transportation Inc Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:

PE, CEI, Flagging & Construction for Bridge Replacement Project over CSX Rail. This Change Order includes all work deemed necessary to complete this project.

Crossing # 621453G, RRMP: 874.10

2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the below referenced Railroad Agreement.

3. The items of work covered by this Change Order are referenced to the Original. Agreement of record dated 8/29/1979 and no Supplemental Agreement is required.

Agreement Type: Crossing Surface

B. 1. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 Section .011(2) as:

a. ☐ NONREIMBURSABLE

b. ☒ REIMBURSABLE

(1) ☒ Force Account Method

(2) ☐ Lump Sum Method

(3) ☐ Third Party Contract Method

C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER

CHANGE

ORDER DESCRIPTION

PREVIOUSLY

AUTHORIZED WORK

AMOUNT(S)

NEW AUTHORIZED

WORK AMOUNT

Construction, CEI & Flagging Construction, CEI & Flagging

$806,319.00 $

Total amount of work previously authorized………………………………………………………… $931,176.00 Total amount of new work authorized by this change order…………………………………………………………………… $382,670.00 Total amount of work authorized under agreement for this Financial Project ID……………………………………… $1,313,846.00 PROJECT TOTAL AMOUNT OF WORK AUTHORIZED TO DATE……………………………………………………………………… $1,313,846.00

Examined as to provisions and participating items of cost:

Recommended: ____________________ Approved: ____________________ Date Date

Kenneth Madden

District 7 Rail Administrator Justin Hall

Director of Transportation Development

3 Construction, CEI & Flagging $124,857.00

$382,670.00

Docusign Envelope ID: A0DD1D5F-C19D-48C7-A3FF-A379CB4F329B

07/23/2024 | 12:06 PM EDT 07/23/2024 | 1:21 PM EDT

725-090-04A

RAIL

OGC – 12/23

EXHIBIT A

The Company shall:

1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and

2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.

OGC – 12/23

EXHIBIT B

The Company shall:

1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and

2. ensure that prefabricated items that contain steel must also comply with Buy America; and

3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.

OGC – 12/23

EXHIBIT C

The Company understands:

1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and

2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.

FLORIDA DEPARTMENT OF TRANSPORTATION

FUNDS APPROVAL

ASR93

7/22/2024

CONTRACT INFORMATION

FUNDS APPROVAL INFORMATION

FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 7/22/2024

Action: Task Work Order

Reviewed or Approved: APPROVED

Organization Code: 55074010706

Expansion Option: A5

Object Code: 563000

Amount: $382,670.00

Financial Project: 42925115701

Work Activity (FCT): 127

CFDA:

Fiscal Year: 2025

Budget Entity: 55150200

Category/Category Year: 088716/25

Amendment ID: W003

Sequence: 00

User Assigned ID: CO#3

Enc Line (6s)/Status: 0003/04

Total Amount: $382,670.00

Contract: ASR93

Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)

Vendor Name: CSX TRANSPORTATION, INC.

Vendor ID: F546000720022

Beginning Date of This Agreement: 03/29/2022

Ending Date of This Agreement: 12/31/2050

Contract Total/Budgetary Ceiling:

Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT

Description: Funding for Construction for New Bridge Project

Page1 of 1

To: Michael.Pokers@dot.state.fl.us

ACCT. CODE : 709 - FL2896 Form Revision Pub EB - FL EB3 (FL) 03/13/24

ESTIMATE SUBJECT TO REVISION AFTER: 4/5/2025 DOT NO.: 621453G, 976908S

CITY: COUNTY: Hillsborough STATE: FL

ZONE: Florida SUB-DIV: Tampa Terminal MILEPOST: A-874.10

DRAWING NO.: __ DRAWING DATE: __

AGENCY PROJECT NUMBER: 429251-157-01

PRELIMINARY ENGINEERING:

Contracted & Administrative Engineering Services (CSX Admin)

Subtotal -$

STV $340,000

CONSTRUCTION ENGINEERING/INSPECTION: CSX $10,000

Contracted & Administrative Engineering Services (STV) 350,000$ Subtotal 350,000$

FLAGGING SERVICE: (Contract Labor) Previous flagging cost 547,357$

Labor (Conductor-Flagman) 0 Days @ 350.00$ -$ Labor (Foreman/Inspector) 220 Days @ 504.00$ 110,880$ Additive 132.80% (Transportation Department) -$ Additive 167.90% (Engineering Department) 186,168$

Subtotal 297,048$

844,405$

COMMUNICATIONS WORK:

Temporary (Details Attached) -$ Permanent (Details Attached) -$

Subtotal -$

TRACK: LABOR

Traffic Control -$ Remove Existing Crossing -$ Renew Cross Ties -$ Renew Rail -$ Install OTM -$ Install Field Welds -$ Install Geo-Textile Fabric -$ Install Sub-Drains -$ Install Ballast -$ Line and Surface -$ Install Crossing Materials -$ Install Bituminous Pavement -$ Clean-Up -$ Additive 167.90% -$

Subtotal -$

TRACK: MATERIAL

Cross Ties, Main Line -$ Cross tie - pre-plated Not to be used for Public Projects -$

Tampa DESCRIPTION: Supplement No. 1

I-75 Deck Replacement and new Ramp B over CSXT. Flagging from April 2024 through January 2025 (9 months).

Cross-tie - Borate -$ Crossties, 10' Length -$ Tie plates -$ Rail, 136RE, New -$ Misc. OTM -$ Geo-Textile Fabric -$ Sub-Drains -$ Ballast - Car load -$ Ballast - Trucked in -$ Field Welds -$ Concrete Full Width -$ Concrete/Rubber Xing (CSX) -$ Rubber Crossing, Full Depth -$ Timber/Asphalt Crossing (CSX Standard) -$ Bituminous Material -$ Sales Tax on Material 7.00% -$ Material Handling 15.00% -$

Subtotal -$

CONTRACT:

Asphalt Paving (In Place) -$ Disposal of Waste Materials -$ Maintenance of Traffic -$

Subtotal -$

EQUIPMENT RENTAL: CSX vehicle and equipment rental included in overhead percentage -$

Subtotal Use for extraordinary rental or unique Service Contract -$

WORK TRAIN: -$

Subtotal -$

SALVAGE:

Rail -$

OTM -$

Subtotal -$

SIGNAL WORK:

Material - Field & Consumables -$ Material - Sales Tax -$ Material - Shop -$ Construction Labor -$ Shop Labor -$ RR Engineering,Preliminary -$ RR Engineering,Construction -$ Additives to Construction Labor -$ Additives to Shop Labor -$ Additives to Engineering -$ Equipment Expense -$ Waste Management -$ Contract Engineering -$ Freight -$ AC Power Service -$ Salvage -$ Other -$

Subtotal -$

PROJECT SUBTOTAL: 1,194,405$

CONTINGENCIES: 10.00% 119,441$

PROJECT TOTAL: ***************************************************** 1,313,846$

CURRENT AUTHORIZED BUDGET: ***************************************************** 806,319$

TOTAL SUPPLEMENT REQUESTED: ***************************************************** 507,527$

DIVISION OF COST:

Agency 100.00% 507,527$

Railroad 0.00% -$

NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.

Office of Director - CSXT Public Projects, Jacksonville, Florida

Estimated prepared by: STV Incorporated Approved by: KSW Project Manager - Public Projects

DATE: 04/05/24 REVISED: DATE: 04/08/24

This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work