CN-550000-ASR93-W0020000.pdf
PDF 3 MB Posted
- Contract number
- ASR93
- Issued by
- Florida
About this file
This document is a Railroad Change Order (Number 2) issued by the Florida Department of Transportation (FDOT) for a bridge replacement project involving CSX Transportation, Inc. The contract pertains to a specific project on Interstate 75 (SR 93A) in Hillsborough County, Florida, with the Financial Project ID 429251-1-57-01. The change order is associated with an original agreement dated 8/29/1979 and involves a crossing surface at Crossing #621453G, Railroad Milepost 874.10.
The change order authorizes additional work for Preliminary Engineering (PE), Construction Engineering and Inspection (CEI), and Flagging for a bridge replacement project over CSX Rail. The total project amount is $931,176.00, with this specific change order adding $124,857.00 to the previously authorized amount of $806,319.00. The project is federally funded, with 90% coming from the Advanced Construction NHPP (Federal) and 10% from District Dedicated Revenue (State). The work is to be reimbursed using the Force Account Method, and the project is set to be completed by January 2025, with approximately 4 months of flagging and oversight required. The contract is structured as a Railroad/Utilities Agreement with CSX Transportation, Inc., beginning on 03/29/2022 and ending on 12/31/2050.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASR93-W0010000.pdf | ||
| CN-360000-A0933-Ext 2.pdf | ||
| CN-550000-ASR93-00010000.pdf | ||
| CN-550000-ASR93-00020000.pdf | ||
| CN-550000-ASR93-00030000.pdf | ||
| CN-550000-ASR93-W0030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NUMBER 2
725-090-04A
RAIL
OGC – 12/23
Financial Project ID Roadway Description County Roadway ID Contract ID 429251-1-57-01 I-75 (SR 93A) Hillsborough 10075000 ASR93
A. 1. The CSX Transportation Inc Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
PE, CEI, Flagging & Construction for Bridge Replacement Project over CSX Rail. This Change Order includes all work deemed necessary to complete this project.
Crossing # 621453G, RRMP: 874.10
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the below referenced Railroad Agreement.
3. The items of work covered by this Change Order are referenced to the Original. Agreement of record dated 8/29/1979 and no Supplemental Agreement is required.
Agreement Type: Crossing Surface
B. 1. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 Section .011(2) as:
a. ☐ NONREIMBURSABLE
b. ☒ REIMBURSABLE
(1) ☒ Force Account Method
(2) ☐ Lump Sum Method
(3) ☐ Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
CHANGE
ORDER DESCRIPTION
PREVIOUSLY
AUTHORIZED WORK
AMOUNT(S)
NEW AUTHORIZED
WORK AMOUNT
Construction, CEI & Flagging Construction, CEI & Flagging
$806,319.00 $ $124,857.00
Total amount of work previously authorized………………………………………………………… $806,319.00 Total amount of new work authorized by this change order…………………………………………………………………… $124,857.00 Total amount of work authorized under agreement for this Financial Project ID……………………………………… $931,176.00 PROJECT TOTAL AMOUNT OF WORK AUTHORIZED TO DATE……………………………………………………………………… $931,176.00
Examined as to provisions and participating items of cost:
Recommended: ____________________ Approved: ____________________ Date Date
Kenneth Madden
District 7 Rail Administrator Justin Hall
Director of Transportation Development
DocuSign Envelope ID: AFB9037C-B5C8-455C-8ED0-7796C84759C6
05/01/2024 | 8:16 AM EDT 05/01/2024 | 12:31 PM EDT
725-090-04A
RAIL
OGC – 12/23
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 12/23
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 12/23
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASR93
4/23/2024
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 4/23/2024
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $124,857.00
Financial Project: 42925115701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2024
Budget Entity: 55150200
Category/Category Year: 088716/24
Amendment ID: W002
Sequence: 00
User Assigned ID: CO#2
Enc Line (6s)/Status: 0002/04
Total Amount: $124,857.00
Contract: ASR93
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 03/29/2022
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Funding for Construction for New Bridge Project
Page1 of 1
To: Michael.Pokers@dot.state.fl.us
ACCT. CODE : 709 - FL2896 Form Revision 03/13/24
ESTIMATE SUBJECT TO REVISION AFTER: 12/30/1900 DOT NO.: 621453G, 976908S
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Tampa Terminal MILE POST: A-874.10
AGENCY PROJECT NUMBER: 429251-157-01
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services -$
Subtotal -$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 350,000$
Subtotal 265,000$
FLAGGING SERVICE: (Contract Labor) 70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$ 50 Labor (Foreman/Inspector) 88 Days @ 504.00$ 44,352$ 70 Additive 132.80% (Transportation Department) -$
50 Additive 167.90% (Engineering Department) 74,467$
Subtotal 118,819$
SIGNAL & COMMUNICATIONS WORK: -$
TRACK WORK: -$
PROJECT SUBTOTAL: 931,176$
900 CONTINGENCIES: 0.00% -$
PROJECT TOTAL: ***************************************************** 931,176$
CURRENT AUTHORIZED BUDGET: ***************************************************** 806,319$
TOTAL SUPPLEMENT REQUESTED: ***************************************************** 124,857$
DIVISION OF COST:
Agency 100.00% 124,857$
Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
STV Incorporated Approved by: 0 CSXT Public Project Group
DATE: 01/00/00 REVISED: 01/00/00 DATE: 01/00/00
Tampa DESCRIPTION: Supplement No. 1 for approximately 4 months (July 30) for flagging and oversite. Project completion date January 2025.
I-75 Deck Replacement and new Ramp B over CSXT. .
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work