CN-550000-ASJ13-W0010000.pdf
PDF 1 MB Posted
- Contract number
- ASJ13
- Issued by
- Florida
About this file
This document is a Railroad Change Order No. 1 issued by the Florida Department of Transportation (FDOT) for a contract with CSX Transportation, Inc. (CSXT). The change order is associated with Financial Project Number 447029-1-57-01, covering districtwide locations and referencing a Master Agreement dated 08/07/1972. The document involves preliminary engineering review and involves District 1 of the Florida Department of Transportation.
The change order authorizes CSXT to perform preliminary engineering review and flagging coverage for installing roadway dynamic envelopes (RDE) at all public road crossings in District 1. The RDE is a new protective device involving thermo application on pavement adjacent to crossings, as directed by the State Secretary of Transportation. The estimated cost for this work is $132,000.00, which will be reimbursed using the Force Account Method under Administrative Rule Chapter 14-57. The contract period runs from 07/21/2020 to 12/31/2050, with the work being categorized as a Railroad Crossing Preliminary Engineering contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASJ13-W0020000.pdf | ||
| CN-550000-ASJ13.pdf | ||
| CN-550000-C9S00-00110000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
725-090-04B
RAIL
OGC – 03/15
RAILROAD CHANGE ORDER NO. 1
Financial Project Number Road Name or Number County Name Parcel & R/W Number FAP Number
447029-1-57-01 Various Districtwide Various N/A
A. 1. The CSXT, Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary engineering review and flagging coverage for installation of roadway dynamic envelopes (RDE) at all public road crossings in District 1. The RDE is a new protective device consisting of thermo application on the pavement adjacent to the crossings by direction of the State Secretary of Transportation. See sheet 3 of 4 of attached Index 509-070. This change order includes any other work deemed necessary to complete the project.
2. Exhibit A is attached to the Railroad Change Order and made a part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated 08/07/1972 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. X ATTACHED
b. INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
PE Review and Flagging 132,000.00
Sub-Totals ………………………………………………………………… $ $132,000.00
Net Cost of Construction Changes, this order ………………………... $ $132,000.00
Cost of Construction Changes, previously ordered ………………….. $ $
Net Total Cost of Construction Changes, to date…………………………………………….. $
Contract Amount ………………………………………………………………………………… $
Estimated Cost of Work Authorized, to date………………………………………………….. $132,000.00
Examined as to provisions and participating items of cost:
Recommended: Approved: Approved: N/A Date Date Date
Exempt From FHWA Review Arlene G. Barnes
District Rail Administrator Paul A. Simmons
Modal Development Administrator Division Administrator
N/A
Federal Highway Administration
DocuSign Envelope ID: 2D9AD34C-95A5-40F8-B56F-BA453680B4C2
7/27/2020 | 11:17 AM EDT 7/27/2020 | 5:49 PM EDT
on behalf of
725-090-04B
RAIL OFFICE
OGC – 03/15
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
DocuSign Envelope ID: 2D9AD34C-95A5-40F8-B56F-BA453680B4C2
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASJ13
7/23/2020
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 7/23/2020
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55310000933
Expansion Option: AW
Object Code: 563000
Amount: $132,000.00
Financial Project: 44702915701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2021
Budget Entity: 55100500
Category/Category Year: 088808/21
Amendment ID: W001
Sequence: 00
User Assigned ID: CO1
Enc Line (6s)/Status: 0001/04
Total Amount: $132,000.00
Contract: ASJ13
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 07/21/2020
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Funding for PE and flagging coverage by railroad during dynamic envelope installation.
Page1 of 1
To: Kyle.Green@dot.state.fl.us
C R
O S S I
N G
R O
A D
R A I L
TRACKS
C R
O S S I
N G
R O
A D
R A I L
TRACKS
C R
O S S I
N G
R O
A D
R A I L
C R
O S S I
N G
R A I L
R O
A D
4'-0" Max.
1'-0" Std.
4'-0" Max.
1'-0" Std.
4'-0" Max.
1'-0" Std.
:3
:0
A M
R E
V I S I O
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2020-21 SHEETINDEX
11/01/17 TRAFFIC CONTROL DEVICES
RAILROAD GRADE CROSSING
509-070 1 4
M in
M in
Gates Are Used.
When Automatic
Installing Agency
Option Of The
Signs Is The
Number Of Track
Crossing)
(1 Minimum Per
Crossing Bell
Highway
Gong Type
Approach Width2
Flasher Units
Back-To-Back
4" Max.Paved Shoulder
Sides
Sheeting, Both
Red And White
Reflectorized
16" Alternate
Gates Are Used.
When Automatic
Installing Agency
Option Of The
Signs Is The
Number Of Track
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
(1 Min. Per Crossing)
Highway Crossing Bell
Gong Type
Flasher Units
Back-To-Back
Roadway
Crown Of
Travelway
4" Max.Paved Shoulder
Highway
Or Part Nearest
Edge Of Background
4" Max.Paved Shoulder
Roadway
Crown Of
Travelway
Approach Width2
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
2' Min. 4" Max.
Shoulder
Paved
Flasher Units
Back-To-Back
Crossing)
Bell (1 Min. Per
Highway Crossing
Gong Type
(Travelway)
Pavement Edge
Signal And Gate
Railroad Gate Or
Gate
Or Signal And
Railroad Gate
Line
Shoulder
(Travelway)
Pavement Edge
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
Or Curb
Pavement Edge
Travelway
Of
Centerline
Travelway
Of
Centerline
(See Note 2)
10' Min.
(See Note 2)
10' Min.
(See Note 2)
10' Min.
(See Note 2)
10' Min.
ONE-WAY
M e d ia n
See Index 830-T01
Crossing Shoulder Pavement
M in
¡ Median
SIGNAL PLACEMENT AT RAILROAD CROSSING
(4 - LANE DESIGN)
Varies
M a x
M in
M a x
" 51" Max.
27"
15"
Roadway
Crown Of
Travelway
See FIGURE 1
L
M in
M in
15"
27"
51" Max.
15"
27"
TYPE II
M a x
M in
Varies
M in
15"
27"
Travelway
Roadway
Crown Of
M a x
SIGNAL PLACEMENT AT RAILROAD CROSSING
(2 - LANE DESIGN)
See Index 830-T01
Crossing Shoulder Pavement
M in
M in
(Mountable Curb)
Divided Multilane
2 Or 4 Lanes
Undivided
FIGURE 1
TWO-WAY TWO-WAY
Median
Or Shoulder)
(Mountable Curb
M a x
M a x
M a x
M in in in
VI
V
IV
III
II
I
V
IV
III
II
I
TYPE I TYPE III AND TYPE V TYPE IV AND TYPE VI
GENERAL NOTES:
TRAFFIC CONTROL DEVICES FOR FLUSH SHOULDER ROADWAY
2-4 Quadrant flashing warning devices and gates-multiple tracks
3-4 Quadrant flashing warning devices and gates-one track
2 Quadrant flashing warning devices and gates-multiple tracks
2 Quadrant flashing warning devices and gates-one track
2 Quadrant flashing warning devices-multiple tracks
2 Quadrant flashing warning devices-one track
Class of traffic control devices (Not Shown)5.
Gate
Flashing warning devices with cantilever and gate
Flashing warning devices with gate
Flashing warning devices with cantilever
Flashing warning devices
Type of traffic control device4.
than 4" above finished shoulder grade.
Top of foundation shall be no higher 3.
if called for in Plans or Specifications.
Advance flasher to be installed when and 2.
certain locations.
attenuation device may be specified for however, some form of impact
No guardrail is proposed for signals; 1.
Arrows denote direction of travel not pavement markings.NOTE:
(See Note 2)
10' Min.
(See Note 2)
10' Min.
(See Note 2)
10' Min.
10' Min.
(See Note 2) but not less than 6' from the edge of the near traffic lane.
located as close as 2' from the edge of a paved shoulder
2. When 10' is deemed impractical the control device can be one for gate), depending on type of equipment used.
1. Two separate foundations may be required (one for signals, NOTE:
C
O S S I
N G
R O
A D
R A I L
Sidewalk
TRACKS
C R
O S S I
N G
R O
A D
R A I L C
R O S S I
N G
R O
A D
R A I L
TRACKS
NOTES:
:0
:4
R E
V I S I O
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2020-21 SHEETINDEX
11/01/17 TRAFFIC CONTROL DEVICES
RAILROAD GRADE CROSSING
509-070 2 4
4" Max.
Sidewalk
Travelway
Highway
Nearest
Part
Edge Of
Are Used.
Automatic Gates
Agency When
The Installing
The Option Of
Tracks Signs Is
Number Of
Crossing
Bell (1 Minimum) Per
Highway Crossing
Gong Type
Sidewalk
4" Max.4" Max.4" Max.4" Max.Sidewalk Sidewalk
Are Used.
Automatic Gates
Agency When
The Installing
The Option Of
Tracks Signs Is
Number Of
Than 2 Approach Lanes).
Unit If There Are More
(More Than One Flasher
Lane Separation Lines
One Flasher Unit Over
As A Minimum, Position
Flasher Units
Back-To-Back
Signal Unit
Of Overhead
Lowest Point
Sides
Sheeting, Both
Red And White
Reflectorized
16" Alternate
Flasher Units
Back-To-Back
Per Crossing
(1 Minimum)
Highway Crossing Bell
Gong Type
Back-To-Back
Flasher Units
Part Nearest Roadway
Edge Of Background Or
Both Sides
And White Sheeting, Reflectorized Red
16" Alternate
Roadway
Crown Of
Travelway
Width
Approach 2
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
Travelway
Roadway
Crown Of
Per Crossing)
Crossing Bell (1 Min.
Gong Type Highway
Flasher Units
Back-To-Back
Travelway
Roadway
Crown Of
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
C R
O S S I
N G
R A I L
R O
A D
6' Min.
51" Max.
Varies
27"
24"
15"
Varies
M a x
M in
Varies
5' Min.
15"
M in
4'
Sidewalk
10'
Sidewalk
10'
Sidewalk
M in
(2 LANES, CURB & GUTTER)
SIGNAL PLACEMENT AT RAILROAD CROSSING
(2 LANES, CURB & GUTTER)
SIGNAL PLACEMENT AT RAILROAD CROSSING
ACUTE ANGLE (AND RIGHT ANGLE) OBTUSE ANGLE
M a x
M in
51" Max
2'-6"
See FIGURE 1
L
15"
27"
M in
M a x
M a x
M in
M a x
See FIGURE 1
L
2'-6"
6' Min.
Width Min.
Approach2
51" Max
27"
15"
M in
M a x
M in
M a x
Travelway
Roadway
Crown Of
Varies
16"
M in
M in
TYPE VTYPE IVTYPE IIITYPE IITYPE I
Min.
2'-6" 24"
M in
M a x
M in of Roadway to the Lowest Point of the Overhead Signal Unit.
minimum vertical clearance shall be 17'-6" from above the Crown
When a cantilevered-arm flashing warning device is used, the 5.
from nearest rail; or 8' from and parallel to gate when present.
Stop line to be perpendicular to edge of roadway, approx. 15' 4.
face of curb and sidewalk.
Locate device outside sidewalk. Over 6' - Locate device between distance available between face of curb & sidewalk. 0' to 6' -
Location of railroad traffic control device is based on the 3.
12'-6".
installed in curbed medians, the minimum median width shall be
Where plans call for railroad traffic control devices to be 2.
appropriate track clearances.
established based on future (or present) installation of gate with
The location of flashing warning devices and stop lines shall be 1.
TRAFFIC CONTROL DEVICES FOR CURBED ROADWAY
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
DO NOT
STOP
ON
TRACKS
02/11/20 TRAFFIC CONTROL DEVICES
RAILROAD GRADE CROSSING
509-070 3 4
D
A T
E
T I
M E
R E
V I S I O
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2020-21 SHEETINDEXAdded Railroad Dynamic Envelope Pavement Marking Details.
16"
White
Message
Pavement
With Gates
Flashing Signal
Gate or
(If Not with Gate)
Flashing Signal
As Required
Stop Line
24" White
W10-1
W10-1
24" White
6" Dbl. Yellow
24" White
Gate When Present.
Or 8' From & Parallel To to Edge Of Travel Way
Stop Bar Perpendicular
24" White
4" (Typ.)
Railroad Gate
Railroad Gate
Railroad Gate
Traveled Way
Edge of
Traveled Way
Edge of
Shoulder
Paved
Traveled Way
Edge of
Shoulder
Paved
6" Yellow
24" White
24" White
Gate When Present.
or 8' From & Parallel to to Edge of Travel Way
Stop Bar Perpendicular
Shoulder
Paved
Traveled Way
Edge of
6" White
M e d ia n
6" Yellow
6" White
6" White
6" Dbl. Yellow
6" White
6" White
6" White
Edge of Traveled Way
6" White
12" White (Typ.)
24" WhiteShoulder
Paved
M e d ia nRailroad Gate
(See Note 6)
Foul Area (Typ.)
6" Yellow
6" White
6" Yellow
6" White
Foul Area (See Note 6)
R R
MULTILANE ROADWAY
RAILROAD CROSSING AT
A
A
10'
'10'
8'
6'
O f
L a n e
8'-0"
12"
NOTES:
R R
TRAFFIC CONTROL DEVICES
RELATIVE LOCATION OF CROSSING
PAVEMENT MESSAGE
RAILROAD CROSSING
Area = 89 S.F.
M in
Min.
Min.
M in
85 Min.
40060
URBAN
(mph)
Speed
Design
(ft)
"A"
Distance
R8-8
R8-8
R8-8
TWO-LANE ROADWAY
RAILROAD CROSSING AT
Rail Side
Traffic Side
PAVEMENT MARKING DETAIL
RAILROAD DYNAMIC ENVELOPE (RDE)
R8-8
M in
M in
14' Min. (See Note 4) 13'-0" (See Note 5)
R8-8
Intersections
Signalized
For Use Near
R8-8
Intersections
Signalized
For Use Near
10'
10'
Min.
Min.
M in
M in
Intersections
Signalized
For Use Near
R8-8
Intersections
Signalized
For Use Near
R8-8
M in
M in
4' Min.
4' Min.
6. Do not install pavement markings in the Foul areas.
or when shown in the Plans.
5. The transverse dimension for the RDE "X" may be reduced to the lane width for two-lane roadways without shoulders
4. Do not install pavement markings when the distance between tracks is less than 14'.
3. Install Railroad Dynamic Envelope Pavement Markings only when called for in the Plans.
for rural conditions. See Index 700-102 for sign details.
2. Place FTP-61-06 or FTP-62-06 sign 100' in advance of crossing for urban conditions and 300' in advance of crossing
1. Place an additional W10-1 sign where intersections occur between the R/R pavement message and the tracks.
O
A
DC
R O S S I
N G
R A I L
:0
:5
R E
V I S I O
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2020-21 SHEETINDEX
11/01/17 TRAFFIC CONTROL DEVICES
RAILROAD GRADE CROSSING
509-070 4 4
White
Red
Red Flashing LightsRed Steady Burn
Crown Of Roadway Travel Way
6" Min. Height
Type F Curb
18"18"
S id e w a lk
Min)
(2'-6"
Varies
(Std.)
27"
Max.
51"
M in .1
M in
12'-5" Min.
1'
1'
S id e w a lk
Specified Length Of Gate Arm
M a x
M in
16" 16"
90°
"C""B""A"
5'
5'
5'
5'
5'
5'
6'
7'
9'
10'10'
9'
7'
6'
5'
4'
41"
36"
36"
36"6"
18"
24"
28"
28"
28"
36"
36"
36"
36"38 And Over
35-37 Ft.
32-34 Ft.
29-31 Ft.
24-28 Ft.
20-23 Ft.
18-19 Ft.
16-17 Ft.
15 Ft.
14 Ft.
"C"
Dimension
"B"
Dimension
"A"
Dimension
Of Gate Arm
Specified Length
RAILROAD GATE ARM LIGHT SPACING
PLAN
MEDIAN SECTION AT SIGNAL GATES
(THREE OR MORE DRIVING LANES IN ONE DIRECTION, 45 MPH OR LESS)
MULTILANE UNDIVIDED URBAN SECTIONS
MEDIAN SIGNAL GATES FOR
"A Policy On Geometric Design Of Streets And Highways".
Devices", Part 8; The "Traffic Control Handbook" , Part VIII; and AASHTO
For additional information see the "Manual On Uniform Traffic Control
NOTE:
| 509-070-Railroad Grade Crossing Traffic Control Devices |
| 509-070-1of4 |
| 509-070-2of4 |
| 509-070-3of4 |
| 509-070-4of4 |
File details come from the government source that posted it. Updated .