This document is a Railroad Change Order (No. 2) issued by the Florida Department of Transportation (FDOT) to CSX Transportation, Inc. for a project located in Pasco County, Florida. The change order involves a railroad crossing improvement on State Road 52 (Schrader Highway), with the project referenced under Financial Project Number 256323-1-57-01 and Railroad Crossing Number 624923-X.

The change order authorizes additional preliminary engineering funds totaling $55,000, which includes $20,000 from the original preliminary engineering change order and an additional $35,000 for expanded project scope. The work will include widening the existing railroad crossing surface with a Concrete MBM Tub to accommodate a shared path, replacing existing signal equipment with new median gates, flashing lights, and cantilever gates, and adding pedestrian gates and flagging. The work is being performed under a Master Agreement dated 9/15/1998, with the additional funds being reimbursable through the Force Account Method. The contract period runs from 11/21/2014 to 11/21/2025, with the current change order specifically addressing preliminary engineering and signal improvements for the SR 52 highway expansion project.

View the file

Other files

File Type Posted
CN-550000-ARP41-W0010000.pdf PDF
CN-550000-ARP41-00010000.pdf PDF
CN-550000-ARP41-00020000.pdf PDF
ContractBudgetExport (1).csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FDOI\)

Florida Depart,nent of Transportation

RICK SCOTT

GOVERNOR

Mr. Jacob Smith, P.E.

Public Projects Engineer CSX Transportation, Inc.

500 Water Street, J-301 Jacksonville, FL. 32202

1120 I North McKinley Drive Tampa, FL 33612-6456

June 6, 2017

RACIIEL D. CONE

INTERII\I SECRETAIW

RE: RAILROAD CHANGE ORDER NO 2 - Preliminary Engineering Additional Funds SR 52 (Schrader Hwy), Fr W of Suncoast Pkwy to E of US 41 (SR 45), Pasco County

FPN: 256323-1; NGCN: 624923-X; RRMP: SR 816.77

RROP: FL2024

Mr. Smith:

Enclosed is Change Order 2, dated June 2, 2017 totaling $55,000.00. The additional amount of $35,000 was added to the original PE CO l of $20,000 as requested. These additional funds are needed for Preliminary Engineering and separate F AE's as follows: reconstruct and widen the crossing surface with an Concrete MBM Tub lengthened enough to accommodate a shared path as designated in the submitted plans, replacement of existing Flashing Lights and Gates with Cantilevers Flashing Lights and Gates, add Median Gates, Pedestrian Gates, Flagging and CEI.

If you have any questions please call me at (813) 975-6407.

Kenneth District Railroad Coordinator cc: M. Dross, Rail Safety Engineer, FOOT L. Mitchell, FOOT Fiscal, copy of attached. (ARP41) File www.fdot.gov

I

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

RAILROAD CHANGE ORDER NO. �

Financial Proiect Number Road Name or Number County Name 256323-1-57-01 SR 52 (Schrader PascoHwv)

Parcel & R/W Number 14 (14120-2105)

725-090-048

RAIL

OGC-03115

Page 1 012

FAP Number N/A

A. 1. The CSX Transportation, Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:

Additional funds for Preliminary Engineering and separate FAE for the following work at crossing# 624923-X, RRMP SR 816.77, Pasco County, FL. Work will include the widening of existing crossing with Concrete MBM Tub material, length to include sidewalk, replacement of existing signal with new median gates, Flagging and CEI. This includes any other work deemed necessary for this project

2. Exhibit A rs attached to the Railroad Change Order and made a part of the Original Railroad Agreement.

3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated .9/15/1998 and no supplemental Agreement is required.

Master Type: 0Crossing Surface 0Signals 181Preliminary Engineering

B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:

C.

ITEM

NO.

a. 2S,ATIACHED

b. _ INCLUDED IN THE HIGHWAY CONTRACT PLANS

2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:

a. __ NONREIMBURSABLE - Section .011 (2)

b. � REIMBURSABLE - Section .011 (2)

(1) � Force Account Method

(2) __ Lump Sum Method

(3) __ Third Party Contract Method

ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER

ITEM UNIT UNIT WORK ELIMINATED(·)

PRICE QTY AMOUNT

Preliminary Engineering (FAE) 20,000.00

ADDITIONAL WORK(+)

QTY AMOUNT

55,000.00 l Sub.Totals... . .. . .. . .. . -� . . , . . . ,., ' $20,000.00 $55,000.00 Net Cost of Construction Changes, this order .............................. $ $35,000.00 Cost of Construction Changes, previously ordered ....................... $ $20,000.00 Net Total Cost of Construction Changes, to date ..................................................... $55,000.00 Contract Amount ............................................................................................. $ Estimated Cost of Work Authorized, to date ........................................................... $55,000.00

Examined as to provisions and particiP.ating items of cost:

rii{?-fJIZ Approved: 6 /6 h1 Recommended:

�Da;;«� /2Jtl �

District Rail Administrator '�ctor of Transportation Development

Approved: _____ N_/A ____ _ Date

Exempt From FHWA Review Division Administralor Federal Highway Administration i

File details come from the government source that posted it. Updated .