CN-550000-ARP41-W0010000.pdf
PDF 192 KB Posted
- Contract number
- ARP41
- Issued by
- Florida
About this file
This is a Railroad Change Order from the State of Florida Department of Transportation involving CSX Transportation, Inc. The document pertains to a project on SR 52 (Shrader Hwy) in Pasco County, Florida, and is referenced to a Master Agreement dated 9-15-98. The change order is specifically for Preliminary Engineering work at Railroad Crossing #624923-X, RRMP SR 816.77.
The change order authorizes work including the widening of an existing crossing with Concrete MBM Tub material, replacement of existing signals with new median gates, flagging, and CEI (Construction Engineering and Inspection). The estimated cost for this preliminary engineering work is $20,000.00, which is reimbursable under the Force Account Method. The contract period spans from 11/21/14 to 11/21/25, with the funds approved on 11/25/2014. The project is part of the SR 52 (Shrader Hwy) Add Lanes project, and the work is to be performed in accordance with attached railroad adjustment plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ARP41-W0020000.pdf | ||
| CN-550000-ARP41-00010000.pdf | ||
| CN-550000-ARP41-00020000.pdf | ||
| ContractBudgetExport (1).csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
725-090-0-'IA
RAILROAD CHANGE ORDER NO.
OGC-07/13
FINANCIAL PROJECT NUMBER ROAO NAME OR NUMBER COUNTY NAME PARCEL & RN-J NUMBER FAP NUMBER
25632315701 SR 52 (Shrader Hwy) PASCO 14 (14120-2105) N/A
A. 1. The CSX Transportation, Inc Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as: Preliminary Engineering and separate FAE for the following work at Crossing# 624923-X, RRMP SR 816.77 Pasco County, Florida. Work will include the widening of existing crossing with Concrete MBM Tub material, length to include shared path, replacement of existing signal with new median gates, Flagging and CEI.
This includes any other work deemed necessary during this project.
2. Exhibit A is attached to this Railroad Change Order and made a part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to a Master Agreement of record dated 9-15-98 and no supplemental Agreement is required.
Master Type: D Crossing Surface D Signals 181 Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
C.
a. X ATIACHED
b. INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a.
b.
NONRElMBURSABLE - Section .011(2) x REIMBURSABLE - Section .011(2)----
(1) X Force Account Method
(2) Lump Sum Method
(3)--- Third Party Contract Method
ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM ITEM UNIT UNIT WORK ELIMINATED(-) ADDITIONAL WORK(+)
NO. PRICE QTY AMOUNT QTY AMOUNT
Preliminary Engineering (FAE)
Sub-Totals $
Net Cost of Construction Changes, this order $ Cost of Construction Changes, previously ordered $
Net Total Cost of Construction Changes, to date .. .... ........ ······················································· Contract Amount
Estimated Cost of Work Authorized, to date .................. .................... ··········· · ·················
20,000.00
$ 20,000.00
$ 20,000.00
$ 0.00
$ 20,000.00
$ 0.00
$ 20,000.00
Recommended: /-(p-/5
Examined as to provisions and pa ing items of cost:
Approved: /-1-f A Approved: N/A Oale -.I'; D1e 1] :1.
WhgJ&RailQi[/�J(_M f A ff, ?11JJi, "' ! . Oifedorof ransportatidh Development
Dale
EXEMPTED FROM FHWA REVIEW
D1v1s1on Adm1mstrator Federal Highway Administration NIA