CN-550000-ARO49-W0030000.pdf

PDF 182 KB Posted

Attached to
Master Agreement FL|ARO49|682aee152c7350fc7c25a7f08419ba9e
Contract number
ARO49
Issued by
Florida

About this file

This document is a Railroad Change Order No. 3 from the Florida Department of Transportation (FDOT) involving CSX Transportation, Inc. The project is located in Hillsborough County, specifically on CR 580 (Sam Allen Road) from West of SR 39 (Buchman Highway) to East of Park Road. The modification is part of a federal-aid project funded by the Federal Highway Administration (FHWA), with the primary contract being managed by the State of Florida's Department of Transportation.

The change order authorizes preliminary engineering work for railroad crossing improvements, including review and replacement of the existing crossing surface with concrete panels, relocation and replacement of crossing gates, median gates, and pedestrian gates. The total contract amount is $299,575.00, with an additional $28,600.00 added for increased Preliminary Engineering (PE) funding. The project is set to be performed under a master agreement dated 8/7/1972 with supplemental agreements, and includes provisions for E-Verify employment eligibility verification. The contract has a beginning date of 11/06/2014 and an ending date of 11/06/2025, with the work focused on infrastructure improvements in the Plant City area of Hillsborough County.

View the file

Other files

File Type Posted
CN-550000-ARO49-00010000.pdf PDF
CN-550000-ARO49-W0020000.pdf PDF
CN-550000-ARO49.pdf PDF
CN-550000-ARO49-00020000.pdf PDF
CN-550000-ARO49-W0010000.pdf PDF
CN-550000-C9184-00110000.pdf PDF
CN-550000-ARO49-00030000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .