This document is a Railroad Change Order No. 2 issued by the Florida Department of Transportation (FDOT) involving CSX Transportation, Inc., related to a railroad crossing reconstruction project in Hillsborough County. The project is located on CR 580 (Sam Allen Rd) from west of SR 39 (Paul Buchman Hwy) to east of Park Rd in Plant City, Florida. The change order is associated with Federal Aid Project Number 4047 203 and State Project Number 257862-3 57 01, with a master agreement dating back to 8/7/1972 and 9/15/1998.
The change order authorizes preliminary engineering work for a crossing reconstruction, including widening with concrete crossing surface, replacement/relocate cantilever flashing lights and gates, and additional median, pedestrian gate, pre-emption adjustment, flagging, and CEI (Construction Engineering and Inspection). The total cost of this change order is $270,975.00, with $240,975.00 added for additional preliminary engineering work and a $30,000.00 reduction in some aspects of the original scope. The project is fully funded at 100% and has a period of performance ending on 1/21/2021. The change order includes a requirement for the company to use the U.S. Department of Homeland Security's E-Verify system to verify employment eligibility of all new employees hired during the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ARO49-00020000.pdf | ||
| CN-550000-ARO49-W0010000.pdf | ||
| CN-550000-ARO49-W0030000.pdf | ||
| CN-550000-C9184-00110000.pdf | ||
| CN-550000-ARO49-00010000.pdf | ||
| CN-550000-ARO49.pdf | ||
| CN-550000-ARO49-00030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .