About this file

Summary

This is Task Assignment 18 under DEP Contract No. WQ019, a state and local indefinite delivery contract between the Florida Department of Environmental Protection (DEP) and WOOD Environment & Infrastructure, Inc. (with subcontractor support from Tetra Tech and other firms). The contract is managed by Michael Phelps (Contractor Contact Manager) and Moira R. Homann (DEP Contract Manager). The task assignment pertains to technical support services for North Central Florida, specifically addressing Total Maximum Daily Loads (TMDLs), Basin Management Action Plans (BMAPs), Reasonable Assurance Plans, Pollutant Reduction Plans, Class III-Limited Reclassifications, and Site Specific Alternative Criteria (SSACs) for the Suwannee River, Santa Fe River, Ichetucknee River, and associated springs.

The task encompasses basin-specific planning, data collection and analysis, document development, stakeholder coordination, and meeting facilitation services. Deliverables include technical reports, model outputs and analysis, meeting presentations, meeting notes, adoptable and supporting documents, memoranda, and project load reduction calculations, with specified hour limits per deliverable type. The total task assignment value is $230,716.58, comprising $209,320.52 in personnel costs (848 hours across multiple position levels), $21,000.00 in travel reimbursement, and $396.06 in subcontractor handling fees. The contract period extends from execution through April 20, 2020, with work assignments authorized in writing by specified DEP staff identified in Exhibit I. Personnel rates for WOOD, Tetra Tech, Wildwood Consulting, Karst, and individual consultants are detailed in Exhibit II.

View the file

Other files

File Type Posted
CN-370000-SW232-TA3.pdf PDF
CN-370000-WQ019-A1.pdf PDF
CN-370000-WQ019-T10CO1.pdf PDF
CN-370000-WQ019-T11.pdf PDF
CN-370000-WQ019-T11CO1.pdf PDF
CN-370000-WQ019-T12.pdf PDF
CN-370000-WQ019-T14CO3.pdf PDF
CN-370000-WQ019-T15.pdf PDF
CN-370000-WQ019-T2.pdf PDF
CN-370000-WQ019-T20.pdf PDF
CN-370000-WQ019-T3.pdf PDF
CN-370000-WQ019-T4-CO2.pdf PDF
CN-370000-WQ019-T4.pdf PDF
CN-370000-WQ019-T5CO3.pdf PDF
CN-370000-WQ019-T6CO3.pdf PDF
CN-370000-WQ019-T8CO3.pdf PDF
CN-370000-SW230.pdf PDF
CN-370000-SW232-TA1.pdf PDF
CN-370000-SW232-TA2.pdf PDF
CN-370000-WQ019-A2.pdf PDF
CN-370000-WQ019-A3.pdf PDF
CN-370000-WQ019-T12CO2.pdf PDF
CN-370000-WQ019-T13CO2.pdf PDF
CN-370000-WQ019-T13CO4.pdf PDF
CN-370000-WQ019-T14CO4.pdf PDF
CN-370000-WQ019-T17.pdf PDF
CN-370000-WQ019-T19.pdf PDF
CN-370000-WQ019-T2C01.pdf PDF
CN-370000-WQ019-T3CO1.pdf PDF
CN-370000-WQ019-T3CO3.pdf PDF
CN-370000-WQ019-T6-CO2.pdf PDF
CN-370000-WQ019-T6CO1.pdf PDF
CN-370000-WQ019-T8CO1.pdf PDF
CN-370000-WQ019-T1.pdf PDF
CN-370000-WQ019-T10.pdf PDF
CN-370000-WQ019-T12-CO1.pdf PDF
CN-370000-WQ019-T13.pdf PDF
CN-370000-WQ019-T14.pdf PDF
CN-370000-WQ019-T15CO1.pdf PDF
CN-370000-WQ019-T16.pdf PDF
CN-370000-WQ019-T16CO1.pdf PDF
CN-370000-WQ019-T18CO1.pdf PDF
CN-370000-WQ019-T21.pdf PDF
CN-370000-WQ019-T21CO1.pdf PDF
CN-370000-WQ019-T3-CO2.pdf PDF
CN-370000-WQ019-T7-CO2.pdf PDF
CN-370000-WQ019-T7CO1.pdf PDF
CN-370000-WQ019-T7CO3.pdf PDF
CN-370000-SW232-TA4.pdf PDF
CN-370000-SW232.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6-27-18

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. NORTH CENTRAL FLORIDA TMDLS/BMAPS TECHNICAL

SUPPORT SERVICES – Page 1 of 13

WQ019 – TASK ASSIGNMENT 18

TECHNICAL SUPPORT FOR NORTH CENTRAL FLORIDA TOTAL MAXIMUM

DAILY LOADS (TMDLS), BASIN MANAGEMENT ACTION PLANS (BMAPS),

REASONABLE ASSURANCE (RA) AND POLLUTANT REDUCTION PLANS, CLASS

III-LIMITED RECLASSIFICATIONS, AND SITE SPECIFIC ALTERNATIVE CRITERIA

(SSACS)

Execution of Task Assignment 10 through April 20, 2020

BACKGROUND

The following scope of work details the services that WOOD ENVIRONMENT & INFRASTRUCTURE, INC.’s staff will provide to the Florida Department of Environmental Protection (DEP). It includes the provision of basin-specific planning, data collection and analysis, project evaluation and design, document development, and coordination associated with the technical aspects of the development, implementation, and tracking of basin specific TMDLs, BMAPs, RA Plans, Pollutant Reduction Plans, and Class III-Limited reclassifications/SSACs.

This estimate covers support needed from execution through April 20, 2020. The effort focuses on North Central Florida including the Suwannee, Santa Fe, and Ichetucknee rivers and associated springs.

The DEP TMDL Program evaluates water bodies across the state to identify water quality impairments resulting from pollutants of concern (e.g., nitrogen and phosphorus, bacteria, and metals). The process establishes a maximum pollutant load for the water body and sets load reduction goals for the specific pollutant(s) of concern. The BMAP Program uses the TMDL as its starting point and brings together local, regional, and state representatives with an interest in reducing the pollutant loads to an impaired water body and restoring the water quality.

Together, these entities work with the BMAP Program to develop a BMAP that is implemented by the stakeholders in order to meet the TMDLs.

As part of the DEP’s water quality assessment process, the DEP has created categories for waterbodies with ongoing or completed restoration activities, which could obviate the need for the establishment of a TMDL. During Phases 1 and 2, stakeholders may submit documentation for review by the DEP to establish reasonable assurance that existing or proposed pollution control mechanisms are sufficient to attain water quality standards in a water segment without a TMDL.

Subcategory 4b applies to a waterbody that is impaired for one or more designated uses but does not require TMDL development because the water will attain water quality standards due to existing or proposed measures. Subcategory 4e is for a waterbody that is impaired but where recently completed or ongoing restoration activities are underway to restore the designated uses of the waterbody. Subcategory 4e impairments include all requirements for placing the

SUPPORT SERVICES – Page 2 of 13 waterbody into Subcategory 4b, but uncertainty remains regarding whether full restoration will occur or the plans/activities have not been finalized or fully reviewed by the DEP.

WOOD ENVIRONMENT & INFRASTRUCTURE, INC’s staff support this program by providing support to analyze the key processes at work in a water body, assess relative pollutant source contributions, evaluate pollutant load allocation strategies, and determine the load reduction potential of management actions/projects proposed by basin stakeholders. The specific types of support to be provided are detailed in the following “Scope of Work” section.

WOOD ENVIRONMENT & INFRASTRUCTURE, INC’s staff may also provide, when necessary, some facilitation and meeting management services to identify stakeholders and engage them in a process of identifying and implementing the management actions/projects needed to improve water quality and meet the TMDL(s) in a basin.

SUPPORT SERVICES – Page 3 of 13

SCOPE OF WORK

This task includes assessment of relative pollutant source contributions and evaluation of pollutant load allocation strategies; data management and analysis; maintenance of stakeholder communications; information gathering; technical report development, follow-up and tracking;

project briefings and presentations; planning and facilitation support; and assistance with briefing of local boards and stakeholder groups regarding TMDLs and BMAPs efforts related to basin-specific actions.

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. provides a combination of facilitation and BMAP support services. The rest of this section identifies the specific services provided and highlights the efforts needed. The Task budget identifies the maximum effort for the task.

TASK 1 - BASIN-SPECIFIC TECHNICAL SUPPORT FOR TOTAL

MAXIMUM DAILY LOADS (TMDLS), BASIN MANAGEMENT

ACTION PLANS (BMAPS), REASONABLE ASSURANCE (RA) AND

POLLUTANT REDUCTION PLANS, CLASS III-LIMITED

RECLASSIFICATIONS, AND SITE SPECIFIC ALTERNATIVE

CRITERIA (SSACS)

To include the positions and accepted WOOD Environment & Infrastructure, Inc. rates provided in Exhibit II.

This task includes basin-specific planning, data collection and analysis, project evaluation and design, technical document development, and meeting support and coordination associated with the technical aspects of the development, implementation, and tracking of basin specific TMDLs, BMAPs, RA Plans, Pollutant Reduction Plans, and Class III-Limited reclassifications/SSACs.

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. will provide technical support and follow-up assistance to the DEP in the technical development and analysis of TMDLs, BMAPs, RA Plans, Pollutant Reduction Plans, Class III-Limited reclassifications, and SSACs. These tasks include participation in meetings and conference calls, scientific analyses, technical designs, or other consultations/contacts with DEP staff, technical groups, and subgroups (e.g., community advisory committees and basin working groups). These activities will be conducted at the request of DEP and in coordination with DEP staff and other state agencies (e.g., Water Management Districts, Florida Department of Agriculture and Consumer Services-Office of Water Policy staff) and others (e.g., consultants, special interest organizations, and county/city municipalities) as identified by DEP.

Such assignments include:

SUPPORT SERVICES – Page 4 of 13

GENERAL DATA COLLECTION/ANALYSIS:

• Identify data needs with DEP, and as appropriate, with other stakeholders.

• Develop monitoring plan to assess data needs.

• Analyze samples, where appropriate. Unless otherwise specified, samples should generally be sent to DEP for laboratory analysis.

• Prepare technical presentation and discussion materials.

• Research information and prepare background papers, options papers, and other materials for meetings (e.g., data analysis options).

• Assist in the compilation of necessary data and analyses for development of TMDLs, BMAPs, RA

• Plans, Pollutant Reduction Plans, Class III-Limited reclassifications, and/or SSACs.

• Conduct data acquisition exercises in support of waterbody impairment assessments.

• Assess necessary pollutant load reductions required to meet specific water-quality conditions.

DOCUMENT DEVELOPMENT

• Facilitate discussions that follow technical presentations, prompt discussions, and promote consensus-based decisions.

• Inform stakeholders of what development of a TMDLs, BMAPs, RA Plans, Pollutant Reduction Plans, Class III-Limited Petitions, and/or SSACs will entail.

• Develop materials for use in management briefings (e.g., management briefing packages, presentations, reports, etc.) using the DEP-approved templates, where applicable.

• Prepare technical analysis, design evaluations, and initial project design for nonpoint nutrient reduction projects and present as a technical report.

• Prepare technical reports to document existing conditions and present model results, analysis of model results and recommendations for model revisions.

TMDLs

• Prepare technical reports to document existing conditions and present model results.

• Prepare interpretation and analysis of model results.

• Provide recommendations for model revisions.

• Review and assess applicable data or publications.

RA PLANS

• Provide necessary information for RA Plans including but not limited to a description of the impaired water, water quality or ecological goals for the water, and appropriate monitoring.

• Prepare documentation that shows the current water quality of the system as well as the goals assigned to the system.

POLLUTANT REDUCTION PLANS

• Provide technical analyses necessary to show that the pollutant reduction plan will provide the specified amount of pollutant reductions.

SUPPORT SERVICES – Page 5 of 13

CLASS III-LIMITED RECLASSIFICATIONS AND SSACS

• Develop appropriate and scientifically defensible water quality, biological, hydrological, and habitat studies and analyses, as well as environmental, social, and economic studies necessary for a reclassification, including the factors listed on page 11 of the “Process for Reclassifying the Designated Uses of Florida Surface Waters-June 2010” document.

• Conduct necessary studies and analyses.

• Develop documentation in support of Use Attainability Analysis (UAA).

COORDINATION

• As directed by DEP, meet “one-on-one” with groups involved in the TMDL/BMAP/RA

Plan/Pollutant Reduction Plan/Class III-Limited reclassification/SSAC process (e.g., elected officials and local governments), other stakeholder groups (e.g., special interest groups), or the public as needed to aid in education and consensus building across communities for technical issues.

• Design presentations for technical meetings. Technical information must be conveyed to a nontechnical audience.

• Research technical needs of particular document (e.g., TMDL, BMAP, RA Plan, Pollutant Reduction Plan, Class III-Limited Petition, and/or SSAC) and educate stakeholders on necessary requirements.

• Provide assistance in the collection and organization of necessary technical documentation, such as charts, tables, and figures.

• Assist the DEP and stakeholders with inter and intra agency reviews and comments on draft technical documents.

• Maintain matrices of all comments received.

• Incorporate comments, where appropriate, into the documents and analyses.

• Assist the DEP staff and stakeholders in making presentations on draft documents

Deliverables and Timelines for Task 1:

Under this task assignment for the North Central Florida area, WOOD ENVIRONMENT & INFRASTRUCTURE, INC. staff will provide technical support and follow-up assistance to the DEP in the technical development and analysis of TMDLs, BMAPs, RA Plans, Pollutant Reduction Plans, Class III-Limited reclassifications, and SSACs. These tasks include participation in meetings and conference calls, scientific analyses, technical designs, or other consultations/contacts with DEP staff, technical groups, and subgroups (e.g., community advisory committees and basin working groups).

This task includes BMAP development support for one (1) BMAP: Suwannee River and associated springs. This task also includes support for one (1) adopted BMAP: Santa Fe River.

This task will also include any future developing or adopted BMAPs in this region not listed above but added during the contract period.

SUPPORT SERVICES – Page 6 of 13

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. will invoice the DEP monthly for completed/submitted deliverables as discussed below. Invoices must be accompanied by logs documenting hours spent on each subtask for the personnel categories being invoiced. Staff hours have been estimated based on as needed support.

Tasks are due as specified by the DEP’s Contract Manager or by a person authorized in Exhibit I. Invoice approval process will include reconciling individual charges by the contractor with tasks assigned by DEP staff.

Specific work assignments (such as those listed below), specific elements to be delivered, and the format for delivery shall be authorized and identified in writing (email) by one of the DEP staff identified in Exhibit I of this task assignment. When a work assignment is authorized by one of these DEP staff, the Contractor shall send an email to that DEP staff person confirming the request and documenting the work to be performed, the timeline for completion, and the deliverables for the work assignment. The number of hours for each deliverable is subject to the limits established below. The DEP staff person shall respond with an email either confirming or requesting changes. The DEP staff person will keep copies of the emails to support approval of invoiced deliverables. Staff hours are estimated for participation of core staff in weekly staff meetings with DEP and for the preparation of progress reports or technical documents.

Deliverable timeframes are stated below. The DEP may establish timeframes from deliverables differing from those established below (e.g., draft agendas and meeting notes).

As necessary, more specific deliverable dates may be established by the DEP for all activities defined under this Task.

Draft Technical Reports (such as allocation calculations, analysis of model results, etc.) -

Due at least fourteen (14) days prior to a meeting or conference call unless the meeting or conference call is scheduled less than ten (10) days from its occurrence. Hours for the production of a technical document shall not exceed 150 hours.

Performance Measures: Department staff will review technical documents and provide comment/revision as needed to ensure work performed in accordance with scope.

Draft Model Outputs and Analysis for TMDLS and/or SSACS - Due at least fourteen (14) days prior to a meeting or conference call unless the meeting or conference call is scheduled less than ten (10) days from its occurrence. Hours for the analysis of model outputs 70 hours.

Performance Measures: Department staff will review the model outputs and analysis and provide comment/revision as needed to ensure work performed in accordance with scope.

Draft Meeting Presentations and Draft Issue Papers - Due at least three (3) days prior to meetings or conference calls unless the meeting or conference call is scheduled less than ten (10) days from meetings. Hours for the development of a meeting presentation shall not exceed 45 hours.

Performance Measures: Department staff will review draft meeting presentations and draft issue papers and provide comment/revision as needed to ensure work performed in accordance with scope.

Draft Meeting Notes - Due within seven (7) days of applicable meetings or conference calls. Hours for the production of a set of meeting notes shall not exceed 20 hours.

SUPPORT SERVICES – Page 7 of 13

Performance Measures: Department staff will review meeting notes and provide comment/revision as needed to ensure work performed in accordance with scope.

Drafts of Adoptable and Supporting Documents - Due within fourteen (14) days of receipt of DEP and stakeholder comments. Hours to develop original text; use text from other sources; produce tables and figures; review and incorporate internal comments; review, document and incorporate external comments; and develop approaches to implement TMDLs shall not exceed 350 hours per month.

Performance Measures: Department staff will review the adoptable and supporting documents and provide comment/revision as needed to ensure work performed in accordance with scope.

Teleconferences – following any teleconference with DEP and/or stakeholders, a brief e-mail that lists the items discussed will be sent to the person who assigned the work as authorized under Exhibit I. The e-mail will list the meeting purpose and any action items or major decisions from the meeting. Hours for a teleconference and the related email documentation shall not exceed 15 hours.

Performance Measures: Department staff will review teleconferences and provide comment/revision as needed to ensure work performed in accordance with scope.

Memos – due as specified by the DEP’s Contract Manager or by a person authorized in Exhibit I. Hours for the production of a memo shall not exceed 150 hours.

Performance Measures: Department staff will review memos and provide comment/revision as needed to ensure work performed in accordance with scope.

Project Load Reduction Calculations – due as specified by the DEP’s Contract Manager or by a person authorized in Exhibit I. Hours to conduct project load reduction calculations for one stakeholder’s projects shall not exceed 75 hours.

Performance Measures: Department staff will review project load reduction calculations and provide comment/revision as needed to ensure work performed in accordance with scope.

The effort is expected to be relatively constant throughout the task year and estimated level of effort is represented below. Other reimbursable expenses may include copies and FedEx shipping, if needed.

Maximum Budget for Task 1: $230,716.58

Summary Budget for Task 1:

Personnel $209,320.52 Subcontractor Handling Fee $396.06 Reimbursable Travel $ 21,000.00 Other Expenses -

Schedule: Execution through April 20, 2020

SUPPORT SERVICES – Page 8 of 13

ASSUMPTIONS, CONSTRAINTS, AND LIMITATIONS

Specific work assignments shall be completed by the lowest labor cost category best suited for completing the work to be performed (based on rates provided in Exhibit II).

Task costs are based on the Contractor’s estimate of hours and rates (see attached budget).

However, the Contractor has the ability to modify the estimated number of hours for the positions listed in the task budget as long as the hourly rate per position is not exceeded and the total cost per task is not exceeded.

FINANCIAL CONSEQUENCES

No payment shall be made for unsatisfactory services or deliverables. In the event that services rendered are deemed unsatisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services/deliverables, or failure to provide services/deliverables which are unsatisfactory, shall result in non-payment or termination of the Contract.

AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. SOUTHWEST FLORIDA TMDLS/BMAPS TECHNICAL SUPPORT SERVICES – Page 9 of 13

Task 1: Basin- Specific Meeting Facilitation, Basin Management Action Plan Development, Tracking, and Support

Position Hourly Rate Suwannee Santa Fe Task 1 Total

Principal/Manager $245.06 12 12 $5,881.44 Senior Program Manager $219.49 36 36 $15,803.28

Associate Program Manager $175.22 60 60 $21,026.40

Senior Project Manager $160.14 60 60 $19,216.80 Senior Engineer I $147.27 30 30 $8,836.20 Project Manager $134.98 80 80 $21,596.80 Senior Engineer I $124.31 60 60 $14,917.20 Senior Scientist II $123.04 80 80 $19,686.40 Senior Scientist I $104.22 100 100 $20,844.00 Engineer II $107.02 120 120 $25,684.80 Engineer I $80.28 120 120 $19,267.20 GIS Specialist $84.46 30 30 $5,067.60 Admin Assistant $59.52 30 30 $3,571.20

Project Manager (Tetra Tech) $132.02 30 30 $7,921.20

Total Hours 848 848 $209,320.52 Total Labor Cost 848 848 $209,320.52 Total Travel Cost 10,500 10,500 $ 21,000.00 Other Expenses Subcontractor Handling Fee 5% $198.03 $198.03 $396.06

Task Labor Subtotals $209,320.52 Task Totals $230,716.58

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. NORTH CENTRAL FLORIDA TMDLS/BMAPS TECHNICAL SUPPORT SERVICES – Page 10 of 13

Task 1: Basin- Specific Meeting Facilitation, Basin Management Action Plan Development, Tracking, and Support

Position Hourly Rate Suwannee Santa Fe Task 1 Total

Principal/Manager $245.06 12 12 $5,881.44 Senior Program Manager $219.49 36 36 $15,803.28

Associate Program Manager $175.22 60 60 $21,026.40

Senior Project Manager $160.14 60 60 $19,216.80 Senior Engineer I $147.27 30 30 $8,836.20 Project Manager $134.98 80 80 $21,596.80 Senior Engineer I $124.31 60 60 $14,917.20 Senior Scientist II $123.04 80 80 $19,686.40 Senior Scientist I $104.22 100 100 $20,844.00 Engineer II $107.02 120 120 $25,684.80 Engineer I $80.28 120 120 $19,267.20 GIS Specialist $84.46 30 30 $5,067.60 Admin Assistant $59.52 30 30 $3,571.20

Project Manager (Tetra Tech) $132.02 30 30 $7,921.20

Total Hours 848 848 $209,320.52 Total Labor Cost 848 848 $209,320.52 Total Travel Cost 10,500 10,500 $ 21,000.00 Other Expenses Subcontractor Handling Fee 5% $198.03 $198.03 $396.06

Task Labor Subtotals $209,320.52 Task Totals $230,716.58

AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. SOUTHWEST FLORIDA TMDLS/BMAPS

TECHNICAL SUPPORT SERVICES – Page 11 of 13

EXHIBIT I

TA 18: North Central Florida

The individuals in the following positions, or their successors, are authorized to specify work assignments under this Task. Changes in individuals will be communicated in writing to the DEP Contract Manager and Contractor.

37000098 37910820 37020525 37020330 37010002 37010680 37010165 37002090 37020530 37011174 37010828 37020849 37010823 37010687

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. NORTH CENTRAL FLORIDA TMDLS/BMAPS TECHNICAL SUPPORT

SERVICES – Page 12 of 13

EXHIBIT II

Personnel Title (Firm) Hourly Rate

Principal/Manager (WOOD) $245.06 Senior Program Manager (WOOD) $219.49 Program Manager (WOOD) $195.72 Associate Program Manager (WOOD) $175.22 Senior Project Manager (WOOD) $160.14 Project Manager (WOOD) $134.98 Administrative Assistant (WOOD) $59.52 Senior Engineer III (WOOD) $184.44 Senior Engineer II (WOOD) $147.27 Senior Engineer I (WOOD) $124.31 Engineer II (WOOD) $107.02 Engineer I (WOOD) $80.28 Senior Scientist III (WOOD) $148.81 Senior Scientist II (WOOD) $123.04 Senior Scientist I (WOOD) $104.22 Scientist II (WOOD) $99.48 Scientist I (WOOD) $81.11 Modeler II (WOOD) $171.71 Modeler I (WOOD) $111.90 GIS Specialist (WOOD) $84.46 Field Technician (WOOD) $54.67

Principal/Manager (Tetra Tech) $249.05 Senior Program Manager (Tetra Tech) $221.95 Program Manager (Tetra Tech) $189.85 Associate Program Manager (Tetra Tech) $179.79 Senior Project Manager (Tetra Tech) $152.94 Project Manager (Tetra Tech) $132.02 Senior Engineer III (Tetra Tech) $183.67 Senior Engineer II (Tetra Tech) $147.46 Senior Engineer I (Tetra Tech) $124.52 Engineer II (Tetra Tech) $103.91 Engineer I (Tetra Tech) $85.11 Senior Scientist III (Tetra Tech) $145.38 Senior Scientist II (Tetra Tech) $115.92 Senior Scientist I (Tetra Tech) $100.45 Scientist II (Tetra Tech) $90.83 Scientist I (Tetra Tech) $71.22 Administrative Assistant (Tetra Tech) $56.03 Senior Modeler (Tetra Tech) $157.28 Junior Modeler (Tetra Tech) $110.61 GIS Specialist (Tetra Tech) $88.21

WOOD ENVIRONMENT & INFRASTRUCTURE, INC. NORTH CENTRAL FLORIDA TMDLS/BMAPS TECHNICAL SUPPORT

SERVICES – Page 13 of 13

EXHIBIT II (CONTINUED)

Personnel Title (Firm) Hourly Rate

Principal (Wildwood Consulting) $170.00 Senior Program Manager (Wildwood Consulting) $147.00 Program Manager III (Wildwood Consulting) $130.00 Program Manager II (Wildwood Consulting) $118.00 Program Manager I (Wildwood Consulting) $97.00 Associate Program Manager (Wildwood Consulting) $95.00 Senior Project Manager (Wildwood Consulting) $115.00 Project Manager (Wildwood Consulting) $90.00 Associate Project Manager (Wildwood Consulting) $67.00 Senior Scientist III (Wildwood Consulting) $145.00 Senior Scientist II (Wildwood Consulting) $130.00 Senior Scientist I (Wildwood Consulting) $118.00 Scientist II (Wildwood Consulting) $110.00 Scientist I (Wildwood Consulting) $85.00 Technical Staff II (Wildwood Consulting) $75.00 Technical Staff I (Wildwood Consulting) $60.00 Administrative Assistant (Wildwood Consulting) $43.00 Principal (Wildwood Consulting) $170.00 Senior Program Manager (Wildwood Consulting) $147.00 Program Manager III (Wildwood Consulting) $130.00

Senior Engineer II (Dr. Martinez) $147.27

Senior Engineer III (Dr. Martin) $150.00

Senior Project Manager (Karst) $165.00 Project Manager (Karst) $125.00 Administrative Assistant (Karst) $75.00 Senior Engineer III (Karst) $175.00 Senior Scientist III (Karst) $165.00 Senior Scientist II (Karst) $125.00 Scientist II (Karst) $125.00 GIS Specialist (Karst) $95.00 Field Technician I (Karst) $54.67 Senior Field Technician I (Karst) $100.00 Senior Field Technician II (Karst) $150.00 Field Technician II (Karst) $140.00 Project Manager w/Equipment (Karst) $165.00 Senior Biologist w/Equipment (Karst) $165.00 Senior Technician w/Equipment (Karst) $150.00 Technician w/Equipment (Karst) $140.00