CN-370000-WQ019-T15.pdf
PDF 1 MB Posted
- Contract number
- WQ019
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form (Attachment C) under DEP Contract No. WQ019, a state and local indefinite delivery contract between the Florida Department of Environmental Protection (FDEP) and AMEC Foster Wheeler Environment & Infrastructure Inc. The task assignment, numbered 15, was issued on June 23, 2017, with a performance period extending through April 20, 2020. The contractor's contract manager is Michael Phelos (863-667-2345), and the FDEP contract manager is Moira Rojas Homann (850-245-8460).
The contract covers modeling support for Lake Jesup Total Maximum Daily Load (TMDL) refinement and Basin Management Plan (BMAP) allocation. The contractor is tasked with providing hydrologic simulation using EFDC and WASP models to evaluate nutrient loading scenarios and support TMDL compliance assessment. Primary deliverables include up to five model run scenarios comparing total nitrogen, total phosphorus, and chlorophyll-a concentrations against TMDL targets; PowerPoint presentations and meeting summaries from up to two stakeholder meetings; and documented scenario results within specified timeframes. The total task assignment value is $34,005.96, consisting of a fee schedule of $30,545.96 and cost reimbursement of $3,460.00. Funding is allocated from budget entity 37300100, object code 131300, special category 088564, for fiscal year 14. The contractor is responsible for re-performing work at no additional cost if deliverables are deemed unsatisfactory by the Department.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .