CN-370000-PL275-T4.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|PL275|fa5989ea1b1bfae15835dbd8d59a5d7f
Contract number
PL275
Issued by
Florida

About this file

This is a Task Assignment Notification Form for an indefinite delivery vehicle contract between the Florida Department of Environmental Protection (DEP), Division of State Lands (DSL), Bureau of Land Acquisition (BLA), and Environmental Consulting & Technology (ECT), Inc. The task assignment pertains to environmental site assessment services for the Shingle Creek Regional Trail-Yates Connector project located in Osceola County, Florida. The property comprises approximately 190.49 acres owned by Billie Yates, Cecil Todd Yates, and Jody Ketchum, with multiple parcels identified through Osceola County Property Appraiser records.

The task assignment requires ECT, Inc. to provide a Phase I Environmental Site Assessment (ESA) for the referenced parcels in accordance with Division of State Lands standards and ASTM E2247 requirements. The contractor must comply with the most current American Society of Testing and Materials standards, with DSL standards taking precedence when conflicts exist. The deliverables include one certified paper copy and four certified CDs of the ESA report, due by March 1, 2018. The task assignment value is $2,200.00 on a fee schedule basis with no cost reimbursement, funded through Florida's budget allocation (Org Code 37500900000, Fund 348020, Project 67852). The contractor is required to maintain a minimum of $1,000,000 in professional liability insurance and must notify DSL immediately of any substantial problems of significant magnitude discovered during the assessment.

View the file

Other files

File Type Posted
CN-370000-PL275-A1.pdf PDF
CN-370000-PL275-CO01.pdf PDF
CN-370000-PL275-T6.pdf PDF
CN-370000-PL275-T5.pdf PDF
CN-370000-PL275.pdf PDF
CN-370000-PL275-A2.pdf PDF
CN-370000-PL275-T3.pdf PDF
CN-370000-PL275-T7.pdf PDF
PC-370000-PL275.pdf PDF
CN-370000-PL275-A3.pdf PDF
CN-370000-PL275-T2.pdf PDF
CN-370000-PL275-T8.pdf PDF
CN-370000-PL275-TA1.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E. O. Fund Object Code Budget Entity Module Special Category Project # Year Amount

37500900000 NC 348020 131545 37500300 U2620 080111 67852 09 $2,200.00

cc: Contracts Office (MS93)

Bureau of Finance & Accounting (MS75) 2 copies

29-Digit FLAIR Code: 37202348020375003000008011109

Page 1 - 1/23/2018 8:14:27 AM

Katrina S. Scarborough, CFA, CCF, MCF Osceola County Property Appraiser www.property-appraiser.org Osceola County Government Center

2505 East Irlo Bronson Memorial Hwy, Kissimmee, FL 34744 Ph: (407) 742-5000 Fax:( 407) 742-4900

Parcel: 32-25-29-00U0-0040-0000 Owner Information Owner Name YATES BILLIE

YATES CECIL TODD

KETCHUM JODY

KETCHUM JODY

Mailing Address PO BOX 420130

KISSIMMEE, FL 34742-0130

Physical Address KISSIMMEE FL 34746 Description PASTURELAND 1-VAC Tax District 200 - KISSIMMEE

Tax Values Current Values Certified Values Current Value represents working appraised values as of 01/22/2018, which are subject to change prior to certification

Certified Value represents certified values that appeared on the tax roll as of 10/03/2017

Land $1,200 Land $1,200 AG Benefit $197,800 AG Benefit $1,200 Extra Features $0 Extra Features $0 Buildings $0 Buildings $0 Appraised(just) $199,000 Appraised(just) $199,000 Assessed(estimated) $1,200 Assessed* $1,200 Exemption(estimated) $0 Exemption $0 Taxable(estimated) $1,200 Taxable $1,200

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

Sales Information Seq ORB-Pg Price Date Deed Type

0 1896-0669 $0 2001-04-30 PR

1 0839-2654 $0 1987-05-15 OR

2 0000-0000 $0 1987-05-07 DC

3 0792-1396 $0 1985-11-18 PR

4 0792-0185 $0 1985-01-21 OR

5 0000-0000 $0 1983-12-13 DC

6 0000-0000 $0 1901-01-01 DC

Page 2 - 1/23/2018 8:14:27 AM

Land Information - Total Acreage: 9.95 Land Description Units Depth Land Type Land Value

IMPROVED 5.00 0.00 AC $1,100

SWAMP MAR 4.95 0.00 AC $100

MARKET VALUE 9.95 0.00 AC $199,000

Legal Description Legal Description LAND N OF CREEK LYING S & E OF STATE HWY 2 IN NE 1/4 LESS R/W ORD #2359

Page 1 - 1/23/2018 8:15:50 AM

Osceola County Property Appraiser www.property-appraiser.org Osceola County Government Center

2505 East Irlo Bronson Memorial Hwy, Kissimmee, FL 34744 Ph: (407) 742-5000 Fax:( 407) 742-4900

Parcel: 33-25-29-00U0-0011-0000 Owner Information Owner Name YATES BILLIE

YATES CECIL TODD

KETCHUM JODY

Mailing Address PO BOX 420130

KISSIMMEE, FL 34742-0130

Physical Address KISSIMMEE FL 34746 Description PASTURELAND 1-VAC Tax District 200 - KISSIMMEE

Tax Values Current Values Certified Values Current Value represents working appraised values as of 01/22/2018, which are subject to change prior to certification

Certified Value represents certified values that appeared on the tax roll as of 10/03/2017

Land $13,200 Land $13,200 AG Benefit $1,535,600 AG Benefit $13,200 Extra Features $0 Extra Features $0 Buildings $0 Buildings $0 Appraised(just) $1,548,800 Appraised(just) $1,548,800 Assessed(estimated) $13,200 Assessed* $13,200 Exemption(estimated) $0 Exemption $0 Taxable(estimated) $13,200 Taxable $13,200

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

Sales Information Seq ORB-Pg Price Date Deed Type

0 1896-0669 $0 2001-04-30 PR

1 0839-2654 $0 1987-05-15 OR

2 0000-0000 $0 1987-05-07 DC

3 0792-0185 $0 1985-12-11 OR

4 0792-1396 $0 1985-11-18 PR

Page 2 - 1/23/2018 8:15:50 AM

Land Information - Total Acreage: 77.44 Land Description Units Depth Land Type Land Value

SWAMP MAR 20.00 0.00 AC $600

IMPROVED 57.44 0.00 AC $12,600

MARKET VALUE 77.44 0.00 AC $1,548,800

Legal Description Legal Description COM AT NW COR OF SE 1/4 OF 28/25/29, N 179.80 FT, E 54 FT TO ELY R/W US 17-92, N 88

DEG E (ALONG NLY LINE BLKS 16, 17 & 18) 550.90 FT TO ELY R/W DILLINGHAM AVE, S

149.30 FT TO N R/W MARTIN AVE, N 88 DEG E 726.56 FT (TO LINE LYING 50 FT E OF BANK OF LAKE), S 16 DEG E 144.12 FT, S 17 DEG E 102.23 FT, S 16 DEG E 106.61 FT, S 17 DEG E

97.02 FT, S 20 DEG E 103.62 FT, S 19 DEG E 99.44 FT, S 18 DEG E 88.63 FT, S 17 DEG E

110.69 FT, S 18 DEG E 195.05 FT, S 20 DEG E 103.15 FT, S 17 DEG E 123.80 FT, S 23 DEG E

213.46 FT, S 21 DEG E 108.30 FT, S 23 DEG E 100.43 FT, S 28 DEG E 69.28 FT, S 3 DEG E

53.07 FT, S 17 DEG W 95.46 FT, S 35 DEG E 30.78 FT TO S/L OF DOT DRAIN R/W, S 35 DEG E

41.44 FT, S 42 DEG E 112.50 FT, S 45 DEG E 104.62 FT, S 39 DEG E 111.92 FT, S 18 DEG E

117.18 FT, S 7 DEG E 77.14 FT, S 4 DEG E 93.73 FT, S 4 DEG E 98.69 FT, S 6 DEG E 136.90 FT, S 4 DEG E 142.97 FT, S 12 DEG W 120.65 FT, S 18 DEG W 104.23 FT, S 23 DEG W 92.34 FT, S 29 DEG W 133.62 FT, S 30 DEG W 96.99 FT, S 24 DEG W 399.46 FT S 25 DEG W 81.52 FT TO POB; CONT S 25 DEG W 21.05 FT, S 29 DEG W 101.73 FT, S 34 DEG W 96.37 FT, S 28 DEG W

96.12 FT, S 23 DEG W 94.49 FT, S 20 DEG W 96.20 FT, S 19 DEG W 100.23 FT, S 20 DEG W

93.20 FT, W 1942.25 FT, N 40 DEG E 50 FT, N 49 DEG W 1527.32 FT TO PT ON ELY R/W US 192, N 40 DEG E 952.34 FT ALONG R/W, S 50 DEG E 477.64 FT, S 77 DEG E 1209.58 FT TO

NON-TAN CURVE, CONC SELY, RAD 118.64 FT (CH BEARING S 84 DEG E) CENT ANG 101

DEG ALONG CURVE 210.90 FT, S 33 DEG E 244.97 FT TO CIRCULAR CURVE, CONC NELY,

RAD 164.85 FT (CH BEARING S 62 DEG E) CENT ANG 59 DEG ALONG CURVE 171.84 FT, S 86

DEG E 172.19 FT, S 64 DEG E TO POB

Page 1 - 1/23/2018 8:15:22 AM

Osceola County Property Appraiser www.property-appraiser.org Osceola County Government Center

2505 East Irlo Bronson Memorial Hwy, Kissimmee, FL 34744 Ph: (407) 742-5000 Fax:( 407) 742-4900

Parcel: 33-25-29-00U0-0012-0000 Owner Information Owner Name DERRICK KOGER TRUST

KOGER-KETCHUM JODY

YATES BILLIE

KOGER DERRICK TR

Mailing Address 1661 LORALYN DR

KISSIMMEE, FL 34744

Physical Address S JOHN YOUNG PKWY, KISSIMMEE FL 34746 Description PASTURELAND 1-VAC Tax District 200 - KISSIMMEE

Tax Values Current Values Certified Values Current Value represents working appraised values as of 01/22/2018, which are subject to change prior to certification

Certified Value represents certified values that appeared on the tax roll as of 10/03/2017

Land $19,200 Land $19,200 AG Benefit $2,042,800 AG Benefit $19,200 Extra Features $0 Extra Features $0 Buildings $0 Buildings $0 Appraised(just) $2,062,000 Appraised(just) $2,062,000 Assessed(estimated) $19,200 Assessed* $19,200 Exemption(estimated) $0 Exemption $0 Taxable(estimated) $19,200 Taxable $19,200

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

Sales Information Seq ORB-Pg Price Date Deed Type

0 4889-1319 $430,000 2015-12-18 QC

1 0000-0000 $0 2012-10-24 OR

2 1896-0669 $0 2001-04-30 PR

3 0839-2654 $0 1987-05-15 OR

4 0000-0000 $0 1987-05-07 DC

5 0792-0185 $0 1985-12-11 OR

6 0792-1396 $0 1985-11-18 PR

7 0000-0000 $0 1983-12-13 DC

8 0000-0000 $0 1901-01-01 DC

Page 2 - 1/23/2018 8:15:22 AM

Land Information - Total Acreage: 103.10 Land Description Units Depth Land Type Land Value

IMPROVED 85.00 0.00 AC $18,700

SWAMP MAR 18.10 0.00 AC $500

MARKET VALUE 103.10 0.00 AC $2,062,000

Legal Description Legal Description COM AT NW COR OF SE 1/4 28/25/29, N 179.80 FT, E 54 FT TO ELY R/W US 17-92, N 88 DEG E

(ALONG NLY LINE BLKS 16, 17 & 18) 550.90 FT TO ELY R/W DILLINGHAM AVE, S 149.30 FT TO N R/W MARTIN AVE, N 88 DEG E 726.56 FT (TO LINE LYING 50 FT E OF BANK OF LAKE), S 16 DEG E 144.12 FT, S 17 DEG E 102.23 FT, S 16 DEG E 106.61 FT, S 17 DEG E 97.02 FT, S 20 DEG E 103.62 FT, S 19 DEG E 99.44 FT, S 18 DEG E 88.63 FT, S 17 DEG E 110.69 FT, S 18 DEG E 195.05 FT, S 20 DEG E 103.15 FT, S 17 DEG E 123.80 FT, S 23 DEG E 213.46 FT, S 21 DEG E

108.30 FT, S 23 DEG E 100.43 FT, S 28 DEG E 69.28 FT, S 3 DEG E 53.07 FT, S 17 DEG W 95.46 FT, S 35 DEG E 30.78 FT TO S/L DOT DRAIN DITCH, S 35 DEG E 41.44 FT, S 42 DEG E 112.50 FT, S 45 DEG E 104.62 FT, S 39 DEG E 111.92 FT, S 18 DEG E 117.18 FT, S 7 DEG E 77.14 FT, S 4 DEG E 192.42 FT, S 6 DEG E 136.90 FT, S 4 DEG E 142.97 FT, S 12 DEG W 120.65 FT, S 18 DEG W 104.23 FT, S 23 DEG W 92.34 FT, S 29 DEG W 133.62 FT, S 30 DEG W 96.99 FT, S 24 DEG W 399.46 FT, S 25 DEG W 102.57 FT, S 29 DEG W 101.73 FT, S 34 DEG W 96.37 FT, S 28 DEG W 96.12 FT, S 23 DEG W 94.49 FT, S 20 DEG W 96.20 FT, S 19 DEG W 100.23 FT, S 20 DEG W 93.20 FT TO POB; CONT S 20 DEG W 53.41 FT, S 19 DEG W 169.84 FT, S 21 DEG W

71.14 FT, S 20 DEG W 134.24 FT, S 19 DEG W 100.56 FT, S 20 DEG W 202.10 FT, S 18 DEG W

97.41 FT, S 21 DEG W 177.14 FT, S 23 DEG W 360.61 FT, N 58 DEG W 234.87 FT, N 68 DEG W

831.24 FT, N 80 DEG W 643.78 FT, N 86 DEG W 306.41 FT, N 74 DEG W 353.04 FT, N 67 DEG W

261.30 FT, N 84 DEG W 312.71 FT, S 62 DEG W 199.889 FT, S 49 DEG W 523.38 FT, S 88 DEG W 157.96 FT, N 78 DEG W 523.03 FT TO E R/W US 17-92, N 40 DEG E 723.07 FT, N 49 DEG W 13 FT, N 40 DEG E 1638.39 FT, S 49 DEG E 1527.32 FT, N 40 DEG E 50 FT E 1942.25 FT TO

POB LYING WITHIN 33/25/29

Page 1 - 1/23/2018 8:19:42 AM

Osceola County Property Appraiser www.property-appraiser.org Osceola County Government Center

2505 East Irlo Bronson Memorial Hwy, Kissimmee, FL 34744 Ph: (407) 742-5000 Fax:( 407) 742-4900

Parcel: 33-25-29-00U0-0013-0000 Owner Information Owner Name YATES BILLIE

YATES CECIL TODD

KETCHUM JODY

Mailing Address PO BOX 420130

KISSIMMEE, FL 34742-0130

Physical Address KISSIMMEE FL 34746 Description PASTURELAND 1-VAC Tax District 200 - KISSIMMEE

Tax Values Current Values Certified Values Current Value represents working appraised values as of 01/22/2018, which are subject to change prior to certification

Certified Value represents certified values that appeared on the tax roll as of 10/03/2017

Land $800 Land $800 AG Benefit $69,000 AG Benefit $800 Extra Features $0 Extra Features $0 Buildings $0 Buildings $0 Appraised(just) $69,800 Appraised(just) $69,800 Assessed(estimated) $800 Assessed* $800 Exemption(estimated) $0 Exemption $0 Taxable(estimated) $800 Taxable $800

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

* Assessed Values Reflect Adjustments for Agricultural Classification and/or the Save Our Homes Cap

Sales Information Seq ORB-Pg Price Date Deed Type

0 1896-0669 $0 2001-04-30 PR

1 0839-2654 $0 1987-05-15 OR

2 0000-0000 $0 1987-05-07 DC

3 0792-0185 $0 1985-12-11 OR

4 0792-1396 $0 1985-11-18 PR

Page 2 - 1/23/2018 8:19:42 AM

Land Information - Total Acreage: 3.49 Land Description Units Depth Land Type Land Value

IMPROVED 3.49 0.00 AC $800

MARKET VALUE 3.49 0.00 AC $69,800

Legal Description Legal Description COM AT NE COR OF SE 1/4 OF 28/25/29, N 179.80 FT, E 54 FT TO ELY R/W US 17-92, N 88

DEG E 550.90 FT (ALONG NLY LINE BLKS 16, 17 & 18) TO ELY R/W DILLINGHAM AVE, S

149.30 FT TO N R/W MARTIN AVE, N 88 DEG E 726.56 FT (TO PT LYING 50 FT E OF BANK OF LAKE), S 16 DEG E 144.12 FT, S 17 DEG E 102.23 FT, S 16 DEG E 106.61 FT, S 17 DEG E 97.02 FT, S 20 DEG E 103.62 FT, S 19 DEG E 99.44 FT, S 18 DEG E 88.63 FT, S 17 DEG E 110.69 FT, S 18 DEG E 195.05 FT, S 20 DEG E 103.15 FT, S 17 DEG E 123.80 FT, S 23 DEG E 213.46 FT, S 21 DEG E 108.30 FT, S 23 DEG E 100.43 FT, S 28 DEG E 69.28 FT, S 03 DEG E 53.07 FT, S 17 DEG W 95.46 FT, S 35 DEG E 30.78 FT TO S/L DOT DRAIN. DITCH, S 35 DEG E 41.44 FT, S 42 DEG E 112.50 FT, S 45 DEG E 104.62 FT, S 39 DEG E 111.92 FT, S 18 DEG E 117.18 FT, S 07 DEG E 77.14 FT, S 04 DEG E 192.42 FT, S 06 DEG E 136.90 FT, S 04 DEG E 142.97 FT, S 12 DEG W 120.65 FT, S 18 DEG W 104.23 FT, S 23 DEG W 92.34 FT, S 29 DEG W 133.62 FT, S 30 DEG W 96.99 FT, S 24 DEG W 399.46 FT, S 25 DEG W 102.57 FT, S 29 DEG W 101.73 FT, S 34 DEG W 96.37 FT, S 28 DEG W 96.12 FT, S 23 DEG W 94.49 FT, S 20 DEG W 96.20 FT, S 19 DEG W 100.23 FT, S 20 DEG W 93.20 FT, S 1942.25 FT TO POB; N 40 DEG E 50 FT, N 49 DEG W

1527.32 FT TO PT ON ELY R/W US 17-92, S 40 DEG W 100 FT ALONG ELY R/W 17-92, S 49

DEG E 1527.32 FT, N 40 DEG E 50 FT TO POB LYING WITHIN 33/25/29

ATTACHMENT C

SCOPE OF SERVICES

ENVIRONMENTAL SITE ASSESSMENT SERVICES

The Contractor shall provide environmental site assessment (ESA) services, on a task assignment basis, for the Department.

These services may include, but not be limited to, the performance of all levels of environmental site assessments (i.e., Phase I, Phase II and updates) in compliance with the Division of State Lands' requirements (see Exhibits I, Ill, IV and V below);

summarizing recommendations and conclusions; preparing recommendations and conclusions; remediation coordination;

remediation activities; clerical staff assistance for environmental site assessment and related document processing, project assessment and remediation consultation.

All sampling and analyses performed under this Contract must conform to the requirements set forth in Chapter 62-160, Florida Administrative Code (F.A.C.) and the Quality Assurance Requirements for Department Contracts (see Attachment G).

The Contractor shall also be involved in the preparation of scopes of services for tasks to be assigned by the Department, at no cost to the Department. This may include compilation of information and products, and research and office work necessary for identification of tasks.

No minimum amount of work is guaranteed under this Contract.

Additional Services

The Contractor may be requested to provide additional services related to an environmental site assessment or remediation services, as deemed necessary by the Department. In the event that such additional services are needed, and based on the availability of funding, the Contractor shall be shall be compensated at rates mutually acceptable to the Department and the Contractor, as evidenced by an executed Task Assignment Notification or Task Assignment Change Order Form

Cost Proposals

The Department may issue informal cost proposal requests to its environmental site assessment contractors for specific projects to be conducted under a task assignment, although final selection for task assignment award may not be based solely on price. All cost proposals prepared by the Contractor must be submitted to the Department on or before the date and time set for receiving cost proposals in order to be considered for task assignment award.

Performance Measures:

Deliverables reviewed to ensure compliance requirements set forth in Chapter 62-160, Florida Administrative Code (F.A.C.)

and the Quality Assurance Requirements for Department Contracts (see Attachment G).

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

DEP Contract No. , Attachment C, Page 1 of 12

EXHIBIT I

STANDARDS FOR ENVIRONMENTAL SITE ASSESSMENT SERVICES

DIVISION OF STATE LANDS

INSTRUCTIONS FOR

ENVIRONMENTAL SITE ASSESSMENTS

SCOPE OF SERVICES REQUIRED IN PERFORMING THE PHASE I ENVIRONMENTAL SITE ASSESSMENT

(PHASE I ESA)

The environmental site assessment of the property (Property) to be acquired by the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Board of Trustees) must meet the requirements of the Florida Department of Environmental Protection, Division of State Lands (DSL), Bureau of Land Acquisition (BLA). For purposes of performing the environmental site assessment, the term "hazardous materials" shall mean any hazardous or toxic substance, material or waste of any kind or any other substance which is designated pursuant to and/or regulated by any environmental law. The term "environmental law" shall mean any and all applicable federal, state, tribal or local laws, statutes, ordinances, rules, regulations or other governmental restrictions regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E 1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements. Specifically, the Contractor must adhere to the current scope and limitations of ASTM Designation: E 1527-05;

Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process.

The DSL required components and scope of the environmental site assessment beyond the above are as follows:

1. Requests for deviation from the DSL requirements as set forth must be approved in writing by the Division of State Lands prior to the issuance of a Task Assignment.

2. Certify the environmental site assessment to the Board of Trustees of the Internal Improvement Trust fund of the State of Florida and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the Task Assignment was signed by the Contractor (also insert a copy of the signed Task Assignment in the report following the certification page); (b) the date the Contractor began the work on the ESA; (c) the environmental site assessment meets the requirements of the Department of Environmental Protection, Division of State Lands, the current ASTM E 1527 standard, and therefore the federal Environmental Protection Agency's All Appropriate Inquiry Rule; (d) the accuracy, correctness and completeness of the environmental site assessment is provided with the knowledge of the ASTM; and (e) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the environmental site assessment.

3. Determine if prior environmental site assessments have been done or any other environmental work and, if so, what it disclosed. Include all found information in the report as an Appendix for the independent review.

4. Contractor agrees to notify DSL immediately, or as soon as feasible, if any substantial problems of significant magnitude unfold or are discovered at any point during the Phase I ESA that impact the Subject Property.

5. Determine the potential existence of federal, state, tribal, and local environmental cleanup liens and Activity and Use Limitations (AUL) of enforcement actions against the Property. The Division of State Lands contracts with the Contractor to fulfill these obligations on behalf of the user( s )/DSL.

6. Identify adjoining property landowners.

7. Interview the applicable adjoining neighbors if it is determined by the Contractor that an adjoining landowner is involved in an industrial use (an activity requiring the application of labor and capital for the production or distribution of a product or

DEP Contract No. , Attachment C, Page 2 of 12 article, including, without limitation, manufacturing, processing, extraction, refining, warehousing, transportation, and utilities of hazardous substances or petroleum products), or if the adjoining site shows current or historical issues in the regulatory database search. Applicable sites would include gas stations; motor repair facilities; commercial printing facilities; dry cleaners; photo developing laboratories; junkyards or landfills; or waste treatment, storage, disposal, processing or recycling facilities. Interviewing residential neighbors is not necessary unless the Contractor has cause for concern.

8. Review and provide a summary of current and historical aerial photographs of the Property and surrounding area for an evaluation of prior and current use. Copies of the photography shall be placed in an appendix within the environmental site assessment for independent review.

9. Provide color photographs of the current site conditions in the ESA. All structures, wells, access roads and trail paths leading onto the Subject Property or impacting the Subject Property, areas of concern, items of concern (including trash sites, borrow pits, stressed vegetation and stained soil), business environmental risks, historical recognized environmental conditions, and recognized environmental conditions on the Property or impacting the Property shall be photographed.

Enough photographs should be taken to show a good representation of the entire site's conditions. If access is available inside of each structure(s), enough photographs should be taken to show a good representation of the internal portion of the structure{ s).

a. Include the corresponding Longitude and Latitude of each photograph, and an ArcGIS shapefile which also includes the latitudes and longitudes in the attribute table, in the ESA report for all indicated areas.

b. List manufacturer and model number of the GPS Unit used to collect data {i.e., Garmin GPS map 76).

10. Orient all photograph points on a site map to scale or current aerial photograph.

11. Estimate depth to groundwater and direction of groundwater flow.

12. List all data failures, as defined in the current ASTM E 1527 standard, and explain why they exist.

13. The environmental assessment report shall contain a discussion and evaluation of the relevance of all the components listed above and other findings of the ESA, along with definite conclusions and specific recommendations for further work the Contractor deems necessary as pertinent to the Subject Property.

14. Provide each report on double-sided pages.

15. Insert an aerial photograph or map of the entire Subject Property at the front of the report.

16. Provide a Table of Contents and page numbers in the ESA report.

17. Provide corresponding page numbers to the Contractor's Itemized Checklist (see Exhibit II), attached to the Task Assignment, and include a completed copy in the ESA.

18. Separate out appendices clearly in the report.

19. One (1) certified paper copy and four (4) certified CDs of the environmental site assessment shall be delivered to the DSL as set out below:

(DEP Contract Manager) Bureau of Land Acquisition Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 115 Tallahassee, Florida 32399

20. All professionals preparing or reviewing Environmental Site Assessments for the Division of State Lands are required to carry a minimum of $1,000,000 in professional liability insurance.

DEP Contract No. , Attachment C, Page 3 of 12

EXHIBIT II

CONTRACTOR'S ITEMIZED CHECKLIST

Phase I ESA {ASTM E 1527 and ASTM E 2247): Updated Phase I ESA (ASTM E 1527 and ASTM E 2247J

Directions: Please fill in each blank with the appropriate response. An appendix may be indicated instead of page numbe�s), if appropriate.

1) YES/NO Have any requests for deviation to the DSL Scope of Services been approved?

2) Page#

Certification to the Board of Trustees, with subsections a, b, c, d, and e.

3) Page# Determination of whether other or previous ESAs or environmental work has been performed at the Subject Property. If other ESAs or environmental work exists, state the Appendix in which copies of the previous ESAs or environmental work can be found in the report: Appendix

4) Page#

Determination of existing environmental liens and AULs on the Subject Property.

5) Page#

Adjoining property landowner identification.

6) YES/NO Were any adjoining landowners interviewed? If so, what page number can this information be found on in the report? Page # __

7) Page# Summary of current and historical aerial photographs.

8) Page# GPS points and GPS manufacturer and model.

9) Page#

Photograph points oriented on a site map to scale or current aerial photograph.

10) Page# Groundwater information.

11) Page# Data failure information.

12) Page# Discussion and evaluation of findings, conclusions and recommendations.

DEP Contract No. , Attachment C, Page 4 of 12

EXHIBIT Ill

DIVISION OF ST ATE LANDS

INSTRUCTIONS FOR

ENVIRONMENTAL SITE ASSESSMENTS

SCOPE OF SERVICES REQUIRED IN PERFORMING THE PHASE I ENVIRONMENTAL

SITE ASSESSMENT (ESA) FOR FORESTLAND OR RURAL PROPERTY

The environmental site assessment of the property (Property) to be acquired by the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Board of Trustees) must meet the requirements of the Florida Department of Environmental Protection, Division of State Lands (DSL), Bureau of Land Acquisition (BLA). For purposes of performing the environmental site assessment, the term "hazardous materials" shall mean any hazardous or toxic substance, material or waste of any kind or any other substance which is designated pursuant to and/or regulated by any environmental law. The term "environmental law" shall mean any and all applicable federal, state, tribal or local laws, statutes, ordinances, rules, regulations or other governmental restrictions regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements. Please see Contractor's Itemized Checklist (see Exhibit I), attached to the Task Assignment. Specifically, the Contractor must adhere to the current scope and limitations of ASTM Designation: E 2247-08; Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process for Forestland or Rural Property.

The DSL required components and scope of the environmental site assessment beyond the above are as follows:

1. Requests for deviation from the DSL requirements as set forth must be approved in writing by the Division of State Lands prior to the issuance of a Task Assignment.

2. Certify the environmental site assessment to the Board of Trustees of the Internal Improvement Trust fund of the State of Florida and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the Task Assignment was signed by the Contractor (also insert a copy of the signed Task Assignment in the report following the certification page); (b) the date the Contractor began the work on the ESA; (c) the environmental site assessment meets the requirements of the Department of Environmental Protection, Division of State Lands, the current ASTM E 2247 standard, and therefore the federal Environmental Protection Agency's All Appropriate Inquiry Rule; (d) the accuracy, correctness and completeness of the environmental site assessment is provided with the knowledge of the ASTM; and (e) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the environmental site assessment.

3. Determine if prior environmental site assessments have been done or any other environmental work and, if so, what it disclosed. Include all found information in the report as an Appendix for the independent review.

4. Contractor agrees to notify DSL immediately, or as soon as feasible, if any substantial problems of significant magnitude unfold or are discovered at any point during the Phase I ESA that impact the Subject Property.

5. Determine the potential existence of federal, state, tribal, and local environmental cleanup liens and Activity and Use Limitations (AUL) of enforcement actions against the Property. The Division of State Lands contracts with the Contractor to fulfill these obligations on behalf of the user(s)/DSL.

6. Identify adjoining property landowners.

DEP Contract No , Attachment C, Page 5 of 12

7. Interview the applicable adjoining neighbors if it is determined by the Contractor that an adjoining landowner is involved in an industrial use (an activity requiring the application of labor and capital for the production or distribution of a product or article, including, without limitation, manufacturing, processing, extraction, refining, warehousing, transportation, and utilities of hazardous substances or petroleum products), or if the adjoining site shows current or historical issues in the regulatory database search. Applicable sites would include gas stations; motor repair facilities; commercial printing facilities; dry cleaners; photo developing laboratories; junkyards or landfills; or waste treatment, storage, disposal, processing or recycling facilities. Interviewing residential neighbors is not necessary unless the Contractor has cause for concern.

8. Review and provide a summary of current and historical aerial photographs of the Property and surrounding area for an evaluation of prior and current use. Copies of the photography shall be placed in an appendix within the environmental site assessment for independent review.

9. Provide color photographs of the current site conditions in the ESA. All structures, wells, access roads and trail paths leading onto the Subject Property or impacting the Subject Property, areas of concern, items of concern (including trash sites, borrow pits, stressed vegetation and stained soil), business environmental risks, historical recognized environmental conditions, and recognized environmental conditions on the Property or impacting the Property shall be photographed.

Enough photographs should be taken to show a good representation of the entire site's conditions. If access is available inside of each structure(s), enough photographs should be taken to show a good representation of the internal portion of the structure( s).

a. Include the corresponding Longitude and Latitude of each photograph, and an ArcGIS shapefile which also includes the latitudes and longitudes in the attribute table, in the ESA report for all indicated areas.

b. List manufacturer and model number of the GPS Unit used to collect data (i.e., Garmin GPS map 76).

10. Orient all photograph points on a site map to scale or current aerial photograph.

11. Estimate depth to groundwater and direction of groundwater flow.

12. List all data failures, as defined in the current ASTM E 2247 standard, and explain why they exist.

13. The environmental assessment report shall contain a discussion and evaluation of the relevance of all the components listed above and other findings of the ESA, along with definite conclusions and specific recommendations for further work the Contractor deems necessary as pertinent to the Subject Property.

14. Provide each report on double-sided pages.

15. Insert an aerial photograph or map of the entire Subject Property at the front of the report.

16. Provide a Table of Contents and page numbers in the ESA report.

17. Provide corresponding page numbers to the Contractor's Itemized Checklist (see Exhibit I), attached to the Task Assignment, and include a completed copy in the ESA.

18. Separate out appendices clearly in the report.

DEP Contract No. , Attachment C, Page 6 of 12

19. One (1) certified paper copy and four (4) certified CDs of the environmental site assessment shall be delivered to the DSL as set out below:

(DEP Contract Manager) Bureau of Land Acquisition Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 115 Tallahassee, Florida 32399

20. All professionals preparing or reviewing Environmental Site Assessments for the Division of State Lands are required to carry a minimum of $1,000,000 in professional liability insurance.

DEP Contract No. , Attachment C, Page 7 of 12

EXHIBIT IV

DIVISION OF ST ATE LANDS

INSTRUCTIONS FOR

UPDATED ENVIRONMENT AL SITE ASSESSMENTS

SCOPE OF SERVICES REQUIRED IN PERFORMING AN UPDATED

PHASE I (ASTM E 1527 or E 2247) ENVIRONMENTAL SITE ASSESSMENT (ESA)

The updated environmental site assessment of the property (Property) to be acquired by the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Board of Trustees) must meet the requirements of the Florida Department of Environmental Protection, Division of State Lands (DSL), Bureau of Land Acquisition (BLA). For purposes of performing the environmental site assessment, the term "hazardous materials" shall mean any hazardous or toxic substance, material or waste of any kind or any other substance which is designated pursuant to and/or regulated by any environmental law. The term "environmental law" shall mean any and all applicable federal, state, tribal or local laws, statutes, ordinances, rules, regulations or other governmental restrictions regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials.

In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E 1527 or current ASTM E 2247 standard, whichever is applicable to the update. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements. Please see the Contractor's Itemized Checklist which will be attached to the Task Assignment (see Exhibit 11). Specifically, the Contractor must adhere to the current scope and limitations of ASTM Designation: E 1527-05; Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, or ASTM Designation: E 2247-08, Standard Practice for Environmental Site Assessment Process for Forestland or Rural Property, whichever is applicable to the update.

The OSL required components and scope of the environmental site assessment beyond the above are as follows:

1. Requests for deviation from the DSL requirements as set forth must be approved in writing by the Division of State Lands prior to the issuance of a Task Assignment.

2. Certify the updated environmental site assessment to the Board of Trustees of the Internal Improvement Trust fund of the State of Florida and any other parties requested by OSL. If the updated ESA report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted.

The certification shall state the following: (a) the date the Task Assignment was signed by the Contractor (also insert a copy of the signed Task Assignment in the report following the certification page); (b) the date the Contractor began the work on the updated ESA; (c} the updated environmental site assessment meets the requirements of the Department of Environmental Protection, Division of State Lands, the current ASTM standard, and therefore the federal Environmental Protection Agency's All Appropriate Inquiry Rule; (d) the accuracy, correctness and completeness of the updated environmental site assessment is provided with the knowledge of the ASTM; and (e) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the updated environmental site assessment.

3. Determine if prior environmental site assessments have been done or any other environmental work and, if so, what it disclosed. Include all found information in the report as an Appendix for the independent review.

4. Contractor agrees to notify DSL immediately, or as soon as feasible, if any substantial problems of significant magnitude unfold or are discovered at any point during the Updated Phase I ESA that impact the Subject Property.

5. Determine the potential existence of federal, state, tribal, and local environmental cleanup liens and Activity and Use Limitations (AUL) of enforcement actions against the Property. The Division of State Lands contracts with the Contractor to fulfill these obligations on behalf of the user(s)/DSL.

DEP Contract No. , Attachment C, Page 8 of 12

6. Identify adjoining property landowners.

7. Interview the applicable adjoining neighbors if it is determined by the Contractor that an adjoining landowner is involved in an industrial use (an activity requiring the application of labor and capital for the production or distribution of a product or article, including, without limitation, manufacturing, processing, extraction, refining, warehousing, transportation, and utilities of hazardous substances or petroleum products), or if the adjoining site shows current or historical issues in the regulatory database search. Applicable sites would include gas stations; motor repair facilities; commercial printing facilities; dry cleaners; photo developing laboratories; junkyards or landfills; or waste treatment, storage, disposal, processing or recycling facilities. Interviewing residential neighbors is not necessary unless the Contractor has cause for concern.

8. Review and provide a summary of current and historical aerial photographs of the Property and surrounding area for an evaluation of prior and current use. Copies of the photography shall be placed in an appendix within the updated environmental site assessment for independent review.

9. Provide color photographs of the current site conditions in the updated ESA. All structures, wells, access roads and trail paths leading onto the Subject Property or impacting the Subject Property, areas of concern, items of concern (including trash sites, borrow pits, stressed vegetation and stained soil), business environmental risks, historical recognized

. environmental conditions, and recognized environmental conditions on the Property or impacting the Property shall be photographed. Enough photographs should be taken to show a good representation of the entire site's conditions. If access is available inside of each structure(s), enough photographs should be taken to show a good representation of the internal portion of the structure(s).

a. Include the corresponding Longitude and Latitude of each photograph, and an ArcGIS shapefile which also includes the latitudes and longitudes in the attribute table, in the updated ESA report for all indicated areas.

b. List manufacturer and model number of the GPS Unit used to collect data (i.e., Garmin GPS map 76).

10. Orient all photograph points on a site map to scale or current aerial photograph.

11. Estimate depth to groundwater and direction of groundwater flow.

12. List all data failures, as defined in the current ASTM standard, and explain why they exist.

13. The updated environmental assessment report shall contain a discussion and evaluation of the relevance of all the components listed above and other findings of the updated ESA, along with definite conclusions and specific recommendations for further work the Contractor deems necessary as pertinent to the Subject Property.

14. Provide each report on double-sided pages.

15. Insert an aerial photograph or map of the entire Subject Property at the front of the report.

16. Provide a Table of Contents and page numbers in the updated ESA report.

17. Provide corresponding page numbers to the Contractor's Itemized Checklist (see Exhibit II), attached to the Task Assignment, and include a completed copy in the updated ESA.

18. Separate out appendices clearly in the report.

DEP Contract No. , Attachment C, Page 9 of 12

19. One (1) certified paper copy and four (4) certified CDs of the updated environmental site assessment shall be delivered to the DSL as set out below:

(DEP Contract Manager) Bureau of Land Acquisition Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 115 Tallahassee, Florida 32399

20. All professionals preparing or reviewing Environmental Site Assessments for the Division of State Lands are required to carry a minimum of $1,000,000 in professional liability insurance.

DEP Contract No. , Attachment C, Page 10 of 12

EXHIBIT V

DIVISION OF ST ATE LANDS

INSTRUCTIONS FOR

PHASE II ENVIRONMENT AL SITE ASSESSMENTS

STANDARDS FOR CONDUCTING PHASE II ENVIRONMENTAL SITE ASSESSMENT (PHASE II ESA)

1. Certify the Phase II environmental site assessment to the Board of Trustees of the Internal Improvement Trust fund of the State of Florida and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the Task Assignment was signed by the Contractor and the due date (also insert a copy of the signed Task Assignment in the report following the certification page); (b) the Phase II environmental site assessment meets the requirements of the Department of Environmental Protection, Division of State Lands; (c) the accuracy, correctness and completeness of the Phase II environmental site assessment is provided with the knowledge of the Comprehensive Environmental Response Compensation And Liability Act as set forth in 42 U.S.C. Section 9601 et seq., as amended ("CERCLA"); and (d) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the Phase II environmental site assessment.

2. Requests for deviation from the DSL requirements as set forth must be approved in writing by the Division of State Lands prior to the issuance of a Task Assignment.

3. Contractor agrees to notify DSL immediately, or as soon as feasible, a) if any substantial problems of significant magnitude unfold or are discovered at any point during the Phase II ESA that impact the Subject Property, or b) if any new Recognized Environmental Conditions (RECs) that were not listed as an REC in the corresponding Phase I ESA are discovered during the course of the Phase II ESA.

4. Contractor agrees to communicate to DSL, by email and/or telephone, all of the data results once received from the laboratory prior to submittal of the written report.

5. Provide color photographs of the Phase II ESA work and any onsite conditions that may have changed since the Phase I ESA that may be of concern. Enough photographs should be taken to show a good representation of the site's RECs that are associated with the Phase II ESA.

a) Orient all photographs on a site map to scale or current aerial photograph.

6. Provide correlating GPS points for all existing wells, sample points, monitor wells, and newly discovered recognized environmental conditions, items of concern or business environmental risks.

a) Orient GPS points on a site map to scale or current aerial photograph.

7. All Phase II environmental site assessments shall be approved and certified by a professional engineer or professional geologist licensed by the State of Florida.

8. Submit a written report which shall include a description of the RECs identified in the Phase I ESA (any any other RECs identified during the course of the Phase II ESA), the correlating work performed; observations; all back up documentation including, but not limited to, the results of the laboratory analysis, waste manifests, receipts and chain of custody documentation; monitoring well construction data; findings; conclusions, and specific recommendations based on the conditions encountered during the assessment..

9. Provide each report on double-sided pages.

10. Insert an aerial photograph or map of the entire Subject Property at the front of the report.

11. Separate out appendices clearly in the report.

DEP Contract No. , Attachment C, Page 11 of 12

12. One (1) certified paper copy and four (4) certified CDs of the Phase II environmental site assessment shall be delivered to the DSL as set out below:

(DEP Contract Manager) Bureau of Land Acquisition Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 115 Tallahassee, Florida 32399

DEP Contract No. , Attachment C, Page 12 of 12

12/11/08

X3. USER QUESTIONNAIRE

(1) Environmental cleanup liens that are filed or recorded against the site (40 CFR 312.25).

• Are you aware of any environmental cleanup liens against the property that are filed or recorded under federal, tribal, state or local law?

No, DSL looks to the ESA consultant to provide us with this information.

(2) Activity and land use limitations that are in place on the site or that have been filed or recorded in a registry

(40 CFR 312.26).

• Are you aware of any AULs, such as engineering controls, land use restrictions or institutional controls that are in place at the site and/or have been filed or recorded in a registry under federal, tribal, state or local law?

(3) Specialized knowledge or experience of the person seeking to qualify for the LLP (40 CFR 312.28).

• As the user of this ESA do you have any specialized knowledge or experience related to the property or nearby properties? For example, are you involved in the same line of business as the current or former occupants of the property or an adjoining property so that you would have specialized knowledge of the chemicals and processes used by this type of business?

No.

(4) Relationship of the purchase price to the fair market value of the property if it were not contaminated (40

CFR 312.29).

• Does the purchase price being paid for this property reasonably reflect the fair market value of the property? If you conclude that there is a difference, have you considered whether the lower purchase price is because contamination is known or believed to be present at the property?

Yes, DSL looks to the DSL approved value established by review and approval of the appraisal of said property by its Bureau of Appraisal. Total compensation to be provided for this property reasonably reflects the fair market value of the property.

(5) Commonly known or reasonably ascertainable information about the property (40 CFR 312.30).

• Are you aware of commonly known or reasonably ascertainable information about the property that would help the environmental professional to identify conditions indicative of releases or threatened releases? For example, as user,

(a) Do you know the past uses of the property?

(b) Do you know of specific chemicals that are present or once were present at the property?

No, the ESA consultant will find out through their research of the property, and interviews, etc.

(c) Do you know of spills or other chemical releases that have taken place at the property?

No, the ESA consultant will find out through their research of the property, and interviews, etc.

12/11/08

(d) Do you know of any environmental cleanups that have taken place at the property?

No, the ESA consultant will determine this through their research and regulatory record review of the property.

(6) The degree of obviousness of the presence of likely presence of contamination at the property, and the ability to detect the contamination by appropriate investigation (40 CFR 312.31).

• As the user of this ESA, based on your knowledge and experience related to the property are there any obvious indicators that point to the presence or likely presence of contamination at the property?

No.

_______ _____James Parker_____________ Contract Manager __ Name (Authorized User Representative) Title

_________________________________ ________January 22, 2018 __________ Signature Date

RE: Shingle Creek– Yates Connector Property – Phase I ESA Task Assignment No.: PL275.004 ____

File details come from the government source that posted it. Updated .