This is a Work Authorization Form (OER_13) issued by the Florida Department of Environmental Protection (FDEP), Office of Emergency Response (OER), dated March 24, 2026. The work authorization involves Cliff Berry Inc. as the contractor, with DEP Incident #2026-3I-73584 occurring on March 2, 2026, at Interstate 75, Mile Marker 87.8 in Naples, Collier County. The On-Scene Coordinator (OSC) is Leroy Feeney, with the contractor representative being Morgan Barber. The form was executed and approved by DEP Representative Leroy Feeney, Contractor Representative Robert C. Summers Jr., and OER Budget Representative Vickie Koenig on March 24, 2026.

The work involves the removal and disposal of approximately 20 tons of diesel fuel-impacted soil that will be excavated and transported to a Class I landfill, with replacement using clean fill material. The scope includes possible installation of monitoring wells and sampling if needed. The level of effort includes one supervisor, one recovery technician, one equipment operator, and one truck driver, utilizing response trucks, straight trucks, pickup/van vehicles, and backhoe equipment, with PPE Level D and an Organic Vapor Analyzer. The work is assigned as a fixed price contract with a not-to-exceed estimate of $13,500. Funding is provided under Project No. LE 809, Organization Code 3704 0100 000, EO FC, Object Code 131545, Fund 099001, Category/Year 101492, for a total authorized amount of $13,500.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OER_13 (Effective 7-01-2017)

Florida Department of Environmental Protection

Office of Emergency Response

WORK AUTHORIZATION FORM

Required Signatures: Adobe Signature or Original Ink Supplemental WAF

Contractor: ____________________________________ DEP Incident # ______________________ Contract #: ___________ Rep: ____________________ Incident Date _______________________ Site Name: ____________________________________ OSC: ______________________________ Location: ______________________________________ Phone: Office______________________ City: __________________County: _________________ Cell ________________________

Description of Work: Respond Immediately Call OSC to set date/time__________________________________

Spill Response Overpack Drums Transport drums to TSA Abandoned Drum:

Remove Soil Sampling Transport Drums to TSDF Analysis of samples collected by OER

Other:

Suspected Materials, and amounts: _____________________________________________________________________________________

Level of Effort: (Check all that apply) Use Subcontractor per OSC

Personnel Vehicles Equipment

Supervisor: ____ Response Truck Overpack Drums: Visqueen

Recovery Tech: ____ Straight Truck 55-gal. Drums: Roll-off Containers: ___________

Field Chemist: ____ Vacuum Truck Sampling Gear EPA Level 1 Vapor Detector

Equip. Oper.: ____ Pickup or Van Sampling Gear EPA Level 2 PPE Level: __________________

Other: ____________ Backhoe or Similar Other: ________________ MOT

Contract Rate: ____________

Comments: ___________________________________________________________________________________________________________

Analytical & Disposal Arrangements: (analytical will usually be listed on Chain-of-Custody or other form)

Via Contractor Via Subcontractor Other: __________________________

Profile Wastes as:

Work Assignment Type: fixed price Not to Exceed estimate amount: $___________________________

Funding Information: (information provided by OER budget rep., budget rep to sign after WAF executed, but prior to transmittal to F&A)

Project No. Organization Code EO Object Code Fund Category/Yr Amount

Approved:

DEP Representative: __________________________ Signature: _______________________________ Date: __________________

Contractor Rep: __________________________ Signature: ___________________________________ Date: __________________

OER Budget Rep: __________________________ Signature: __________________________________ Date: __________________

Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely

Cliff Berry Inc. 2026-3I-73584

LE809 Morgan Barber 03/02/2026

I-75 MM 87.8 Leroy Feeney

I-75 MM 87.8 239-810-9505

Naples Collier 239-810-9505

20 tons of diesel fuel impacted soil to be excvavated and transported to a Class I landfill

1 D truck driver OVA

General scientist is also supervisor. Excavate approx 20 tons of diesel impacted soil and replace with clean fill. Possible installation of MW and sampling if needed.

21,500

LE 809 3704 0100 000 FC 131545 099001 101492 21,500 00

Leroy Feeney

Robert Summers

Vickie Koenig 3/24/2026

Samuel Graves

✔ diesel fuel impacted soil

Vickie Koenig Digitally signed by Vickie Koenig Date: 2026.03.24 09:29:53 -04'00'

Robert C. Summers, Jr., P.G.

Digitally signed by Robert C. Summers, Jr., P.G.

Date: 2026.03.23 10:09:57 -04'00'

Leroy Feeney Digitally signed by Leroy Feeney Date: 2026.03.20 15:13:34 -04'00'

Samuel Graves Digitally signed by Samuel Graves Date: 2026.05.13 11:07:10 -04'00'

13,500

13,500

File details come from the government source that posted it. Updated .