CN-370000-GW387-PRP2.pdf
PDF 13 MB Posted
- Contract number
- GW387
- Issued by
- Florida
About this file
This document is a Task Assignment (TA-PRP-2) issued under Contract GW387 between the State of Florida Department of Environmental Protection (Department) and the Florida Department of Health (Contractor). The Task Assignment, effective through December 31, 2024, establishes the scope and payment terms for administrative and field services related to potable well survey and sampling activities. Robert Perlowski serves as the Department Project Manager, while Mike Berry represents the Contractor as the Project Manager. The project location is Tallahassee, Florida.
The Contractor will provide comprehensive potable well survey and sampling services according to the detailed scope of work outlined in Attachment 1. Compensation is structured on both a fixed unit rate basis of $62,411.00 and a cost reimbursement basis of $91,500.00, for a total Task Assignment value of $153,911.00. The funding is allocated from Org Code 450401000 (JC 131545, Budget Entity 37450300, Appropriation Category 104132) for Fiscal Year 2024. Services include locating potable wells within specified distances of contamination risk sources, collecting water samples, obtaining GPS coordinates, conducting laboratory analysis, preparing well survey reports with maps, and providing documentation of sampling activities. The scope encompasses routine surveys, confirmation sampling, follow-up sampling, re-sampling requests, updated surveys, complaint investigations, and specialized projects as assigned through change orders. The Department Lab will conduct analytical testing on collected samples at no charge to the Contractor.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
GW387
PRP-2 December 31, 2024
The Contractor will provide administrative staff and services to the Department according to Contract GW387. Please see the attached pages for itemized Tasks.
Robert Perlowski 8502458917 Florida Department of Health
Mike Berry 8509016486
Tallahassee Florida
Potable Well Survey and Sampling
$ 62,411.00
$ 91,500.00
$ 153,911.00
Scope of Work
Florida Department of Health
Mike Berry
OMC Manager
6/24/2024
Tim Bahr Digitally signed by Tim Bahr Date: 2024.06.24 12:19:16 -04'00'
450401000 JC 131545 37450300 104132 GW387 00 $ 153,911.00
It e m iz e d E xp e n s e s
D O
H C
O S
T S
D E
P E
X P
E N
S E
S F
IE
L
D C
O S
T S
B R
E A
K D
O W
N
B Y
P R
O G
R A
M
D O
H P ro g ra m
O ff ic e
P e tr o le u m P e tr o le u m u n its
/u n it
P e tr o le u m
.7
,4
S u rv e ys
,2
T o xi cs
.1
,5
Pr og ra m O ffi ce
,4
S a m p le s
,2
D ry cl e a n in g
.0
Fi el d
Co st s
,5
O u t o f C o u n ty
,0
D is tr ic t S u p p o rt
.2
,7
To ta l
,9
T o ta l
,5
T o ta l
,7
W a te r R e st o ra tio n
P ro g ra m
T o xi cs
T o xi cs u n its
/u n it
S u rv e ys
,6
F ie ld C o st s u n its
/u n it
Pr og ra m
O ffi ce
,5
S a m p le s
,0
S u rv e ys
,8
Fi el d
Co st s
,5
M u lti p le S a m p le s
,2
S u rv e ys
/2
-1 m ile
,2
To ta l
,1
O u t o f C o u n ty
,0
S u rv e ys
-2 m ile
,1
F ie ld
A ss is ta n ce
.0
S u rv e ys m ile
,1
,2
D ry cl e a n in g
G P
S W e ll
P o in ts
.0
,2
.0
S a m p le s
,2
T o ta l
,5
M u lt S a m p le s
,2
Pr og ra m
O ffi ce o u t o f co u n ty
,5
Fi el d
Co st s
D ry cl e a n in g u n its
/u n it
G P
S
.0
,2
To ta l
S u rv e ys
A ss is ta n ce
S a m p le s
T o ta l
,1
O u t o f C o u n ty
D is tr ic t S u p p o rt
T o ta l
Pr og ra m
O ffi ce
,7
D is tr ic t S u p p o rt u n its
/u n it
Fi el d Co st s
,0
S u rv e ys
,0
To ta l
,8
S u rv e ys
/2 -1 m ile
,2
S u rv e ys
-2 m ile
,1
F Y
(6 M
O N
T H
S
P e tr o le u m R e st o ra ti o n P ro g ra m
S u rv e ys m ile
,1
,2
C o s t
R ei m b u rs e m e n t $6
,4
S a m p le s
,0
F ix e d
U n it R a te
,5
O u t o f
C o u n ty
,5
T o ta l
,9
T o ta l
,0
ATTACHMENT
File details come from the government source that posted it. Updated .