CN-370000-GM158-T1CO4.pdf
PDF 213 KB Posted
- Contract number
- GM158
- Issued by
- Florida
About this file
This document is a task assignment change order for the Dunnellon Trail and Bridge Project, involving the Florida Department of Environmental Protection and Page One Consultants, Inc. The contract is identified as DEP Contract No. GM158, Task Assignment No. 01, with Change Order No. 04. The primary parties are the Florida Department of Environmental Protection, located in Tallahassee, and Page One Consultants, Inc., based in Orlando, Florida.
The change order addresses a no-cost reallocation of funds for construction phase engineering services, specifically related to a time extension for the project. The current contract amount remains $492,518.97, with no adjustment to the overall contract price. Page One Consultants requests to transfer $11,171.85 from unused sub-consultant fees to cover additional construction phase supervision, necessitated by the construction contractor's inability to complete the project within the original timeframe. This resulted in a 9-day extension for Construction Engineering Inspection (CEI) supervision, with funds reallocated from sub-consultants Ardaman & Associates, GRL Engineers, and Central Testing to offset the additional time required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GM158-T1.pdf | ||
| CN-370000-GM158-T1CO2.pdf | ||
| CN-370000-GM158.pdf | ||
| CN-370000-GM158-T1CO5.pdf | ||
| CN-370000-GM158-T1CO1.pdf | ||
| CN-370000-GM158-T1CO3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .