CN-370000-GM158-T1CO1.pdf

PDF 676 KB Posted

Attached to
Master Agreement FL|GM158|2126d5e69efd576fd0a5c726ea198955
Contract number
GM158
Issued by
Florida

About this file

This document is a Task Assignment Change Order for the Florida Department of Environmental Protection (DEP), Contract No. GM158, involving Page One Consultants, Inc. as the contractor. The change order is specifically for the Dunnellon Trail and Bridge Project (Project #6749), with Charles Sukanek representing the contractor and James Wolfe serving as the DEP Contract Manager.

The change order modifies the existing contract to reallocate unused project funds and adjust task scope hours. Specifically, it involves additional work related to dynamic pile testing for bridge support structures, including addressing an incident where a test pile (Pile #6) broke during installation. The total contract value remains unchanged at $492,518.97, with adjustments made to the Construction CEI (Construction Engineering Inspections) monthly scope. The changes include reducing inspector hours from 40 to 24 per week and increasing Senior Project Engineer hours from 16 to 20 per week. The Contract Support Specialist rate is also adjusted from $70 to $88.18 per hour, with all additional costs to be covered by existing unused project funds.

View the file

Other files

File Type Posted
CN-370000-GM158-T1.pdf PDF
CN-370000-GM158-T1CO2.pdf PDF
CN-370000-GM158-T1CO4.pdf PDF
CN-370000-GM158.pdf PDF
CN-370000-GM158-T1CO5.pdf PDF
CN-370000-GM158-T1CO3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .