CN-370000-GC867-A11.pdf

PDF 609 KB Posted

Attached to
Master Agreement FL|GC867|d355ec2b97c727210375c0ccdebb540d
Contract number
GC867
Issued by
Florida

About this file

This document is Amendment No. 11 to Agency Term Contract No. GC867 between the Florida Department of Environmental Protection (DEP) and Handex Consulting and Remediation-Southeast, LLC. The amendment modifies the existing contract originally executed on February 24, 2014, to provide petroleum contamination site response action services in the South Region of Florida. The amendment was executed on May 8, 2024, with an effective Rate Change Date of June 10, 2024, and applies only to new work assignments offered on or after that date.

The amendment increases rates for 344 pay items contained in Attachment D (Rate Schedule V3.3) by amounts ranging from +3.03% to +5.00%, with the majority of increases at approximately +4.99%. All rate increases remain within the maximum 5% allowed under provision 11.B.ii of the contract. The pay items cover comprehensive petroleum remediation services including field activities such as drilling, boring, well installation, and sampling; laboratory analysis for soil and water testing; equipment rental and mobilization; waste disposal and transportation; remediation system operations and maintenance; and professional services including engineering oversight, report preparation, and regulatory certifications. Pre-existing work assignments and those previously offered continue to apply the prior rate schedule, while the new rates apply exclusively to work assignments offered on or after June 10, 2024.

View the file

Other files

File Type Posted
CN-370000-GC867-A10E1.pdf PDF
CN-370000-GC867-A7.pdf PDF
CN-370000-GC867-A9.pdf PDF
CN-370000-GC867-AR1.pdf PDF
CN-370000-GC867-CMC.pdf PDF
CN-370000-GC867-CMC2.pdf PDF
CN-370000-GC867-CMC3.pdf PDF
CN-370000-GC867-A14.pdf PDF
CN-370000-GC867-A3.pdf PDF
CN-370000-GC867.pdf PDF
PC-370000-GC867.pdf PDF
CN-370000-GC867-A12E2.pdf PDF
CN-370000-GC867-A13.pdf PDF
CN-370000-GC867-A2.pdf PDF
CN-370000-GC867-A4.pdf PDF
CN-370000-GC867-A5.pdf PDF
CN-370000-GC867-A8.pdf PDF
CN-370000-GC867-CMC1.pdf PDF
CN-370000-GC867-CO1.pdf PDF
CN-370000-GC867-A6.pdf PDF
CN-370000-GC867-CO2.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.2) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC867 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and HANDEX

CONSULTING AND REMEDIATION-SOUTHEAST, LLC (hereinafter "Contractor") executed on

February 24, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC867

RATE INCREASE

AMENDMENT NO. 11

Amendment No. 11

DEP Agency Term Contract No. GC867

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 11

DEP Agency Term Contract No. GC867

4.

5.

6.

Attachment D, Rate Schedule (V3.3) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this

Amendment, Attachment D, Rate Schedule (V3.3) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

709.36$ $744.76

375.80$ $394.55

608.71$ $639.08

740.84$ $777.81

1,177.75$ $1,236.52

202.55$ $212.66

337.58$ $354.43

620.98$ $651.97

802.60$ $842.65

904.56$ $949.70

1,282.34$ $1,346.33

856.96$ $899.72

9,935.82$ $10,431.62

12,074.79$ $12,677.32

43.20$ $45.36

48.63$ $51.06

183.54$ $192.70

3,521.39$ $3,697.11

2,082.90$ $2,186.84

47.15$ $49.50

Est %

Rate

Change (2)

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

3-1.

3-3.

3-4.

Hand Auger Boring ≤ 10 foot total depth

DPT Membrane Interface Probe (MIP) Equipped with

PID and ECD (add-on cost to DPT base rate)

Direct Push Technology (DPT) Rig and Equipment

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

File Review

Notice of Discovery of Contamination Package

(Initial or TPOC)

Split Spoon Sampling – 2 foot (during boring) 50 to

100 feet

Split Spoon Sampling – 2 foot (during boring) < 50 feet

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Well Installation - 2 inch diameter (vertical)

Pay

Item No.

1-1.

1-3.

3-14.a.

3-5.

3-6.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

3-11.

5-1.a.1.

5-1.a.2.

5-2.

5-3.a.

5-5.a.

6-2.a.

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+4.98%

181.45$ $190.50

55.72$ $58.50

188.58$ $197.99

8.56$ $8.98

11.42$ $11.99

141.96$ $149.04

381.85$ $400.90

472.41$ $495.98

21.45$ $22.52

24.99$ $26.23

30.35$ $31.86

34.13$ $35.83

174.46$ $183.17

266.83$ $280.14

37.14$ $38.99

77.54$ $81.41

57.47$ $60.34

79.54$ $83.51

97.88$ $102.76

24.07$ $25.27

24.07$ $25.27

+4.99%

+4.99%

8-12.

8-3.

8-4.

8-9.

8-10.

8-11.

Removal and Reinstallation of 12-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Other Water Sampling

Domestic Water Well Sampling

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Removal of Well Pad and Manhole

Removal and Reinstallation of 8-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Well Redevelopment

6-9.a.

7-2.

7-3.

7-4.

7-1.

6-9.b.

6-13.

6-14.

6-15.

7-7.

8-1.

8-13.

Grout and Abandon Well, > 6 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Survey Latitude/Longitude of New Monitor Wells

Survey Latitude/Longitude of Existing Monitor Wells

Electronic Data Deliverables (EDD)

Vapor/Ambient Air Sample Collection - SUMMATM

Canister (or equivalent)

Vapor/Ambient Air Sample Collection - Passive

Dosimeter, Sorbent Tube, Tedlar

TM

Bag (or

Equivalent)

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

6-3.a.

6-3.b.

6-2.b.

+4.99%

+4.91%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.96%

+4.98%

+4.98%

+4.99%

+4.99%

+4.98%

+4.99%

+4.99%

+4.99%

+4.99%

19.91$ $20.90

451.46$ $473.99

39.84$ $41.83

65.19$ $68.44

76.06$ $79.86

84.51$ $88.73

86.33$ $90.64

283.74$ $297.90

53.13$ $55.78

265.62$ $278.87

53.13$ $55.78

72.43$ $76.04

12.07$ $12.67

12.07$ $12.67

12.07$ $12.67

12.07$ $12.67

33.20$ $34.86

33.20$ $34.86

39.54$ $41.51

+4.97%

+4.97%

+4.97%

+4.97%

+5.00%

+5.00%

+4.98%

8-14.

9-1.

9-2.

9-3.

9-4.

9-5.

9-6.

9-16.

9-17.

9-15.

9-7.

9-8.

9-8.a.

9-9.

9-10.

9-11.

9-12.

9-13.

9-14.

Soil, TRPH Fractionation (MADEP-EPH/VPH

Method or TPHCWG Direct Method)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-

PRO)

Soil, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Soil, Volatile Organic Halocarbons (EPA 8021 or

EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram

Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA

8260)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-

Black)

Soil, Synthetic Precipitation Leaching Procedure-

Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure-

Extraction Only (EPA 1311)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020

[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471

[Mercury])

Soil, PCBs [or Aroclors] (EPA 8082)

+4.97%

+4.99%

+4.99%

+4.99%

+5.00%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.98%

78.47$ $82.39

6.63$ $6.96

21.75$ $22.83

199.21$ $209.15

199.21$ $209.15

60.37$ $63.38

181.11$ $190.15

262.97$ $276.09

382.50$ $401.59

36.22$ $38.03

62.77$ $65.90

66.40$ $69.71

84.51$ $88.73

46.48$ $48.80

53.13$ $55.78

72.43$ $76.04

78.47$ $82.39

+5.00%

+4.98%

+4.97%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+4.99%

+4.98%

+4.99%

+4.99%

+4.99%

9-18.

9-19.

9-20. Soil, Texture, (See Gee 7 Bauder [1966])

Water, Priority Pollutant Volatile Organics [for

NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including

1-methylnaphthalene + 2-methylnaphthalene (EPA

610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA

624, EPA 6021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB

(EPA 8021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA

8021 or EPA 8260)

Water, Priority Pollutant Volatile Organics (EPA

8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM

D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Water, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline

PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution

GC/MS)

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

9-32.

9-24.

9-25.

9-26.

9-27.

9-28.

9-29.

9-30.

9-31.

9-31.a.

9-21.

9-22.

9-23.

9-33.

+4.98%

+5.00%

150.92$ $158.45

283.74$ $297.90

53.13$ $55.78

53.13$ $55.78

9.66$ $10.14

9.66$ $10.14

9.66$ $10.14

9.66$ $10.14

37.19$ $39.04

14.82$ $15.56

9.66$ $10.14

9.66$ $10.14

37.19$ $39.04

9.66$ $10.14

9.66$ $10.14

9.66$ $10.14

9.66$ $10.14

13.28$ $13.94 9-49.

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Total Recoverable Petroleum Hydrocarbons

(FL-PRO)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA

8270)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM

2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-48.

9-41.

9-41.a.

9-42.

9-43.

9-44.

9-44.a.

9-45.

9-46.

9-47.

9-39.

9-40.

9-34.

9-35.

9-36.

9-37.

9-38.

+4.99%

+4.99%

+4.99%

+4.99%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.99%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

16.29$ $17.10

14.49$ $15.21

12.07$ $12.67

14.49$ $15.21

14.49$ $15.21

14.49$ $15.21

21.73$ $22.81

16.29$ $17.10

12.07$ $12.67

13.28$ $13.94

14.49$ $15.21

36.22$ $38.03

905.55$ $950.74

905.55$ $950.74

199.21$ $209.15

9-57.

9-58.

9-59.

9-60.

9-61.

9-62.

9-63.

9-64.

9-50.

9-51.

9-52.

9-53.

9-54.

9-55.

9-56.

Water, Residue-nonfilterable [Total Suspended

Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310

C or EPA 9060)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM

4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3

C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA

2006.0/2007.0)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+4.97%

+5.00%

+4.99%

+4.99%

199.21$ $209.15

54.33$ $57.04

199.21$ $209.15

46.48$ $48.80

84.51$ $88.73

175.07$ $183.81

169.03$ $177.46

289.77$ $304.23

199.21$ $209.15

199.21$ $209.15

2.13$ $2.23

6.42$ $6.74

12.13$ $12.73

4.27$ $4.48

8.55$ $8.97

21.41$ $22.48

38.89$ $40.82

+5.00%

+4.96%

+4.99%

+4.69%

+4.98%

+4.95%

+4.92%

+4.91%10-2.c.

10-2.d.

10-7.

9-66.

9-65.

9-72.

9-73.

10-1.b.

10-1.c.

10-1.d.

9-67.

9-79.

9-68.

9-69.

9-70.

9-71.

10-2.b.

Air, Polycyclic Aromatic Hydrocarbons (EPA Method

TO-13)

Air, Volatile Organic Aromatics (EPA Method TO-

15)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328

High Resolution GC/FID)

Air, Volatile Organic Compounds (EPA Method TO-

17)

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution

GC/MS)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

34.31$ $36.02

151.20$ $158.74

40.11$ $42.11

38.56$ $40.48

14.31$ $15.02

13.12$ $13.77

64.55$ $67.77

57.41$ $60.27

4,289.99$ $4,504.06

8,971.10$ $9,418.76

365.89$ $384.15

365.89$ $384.15

1.95$ $2.04

57.13$ $59.98

42.84$ $44.98

49.98$ $52.47

224.21$ $235.40

35.70$ $37.48

19.99$ $20.98

19.99$ $20.98

35.70$ $37.48

32.84$ $34.48

202.80$ $212.92

1.42$ $1.49

+4.98%

+4.99%

+4.99%

+4.98%

+4.96%

+4.95%

+4.99%

12-3.

12-4.

12-5.

12-6.

12-7.

10-8.

#57 Stone

Pea Gravel

Clean Overburden Used As Backfill, Compaction and

Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and

Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) ≤ 300 cubic yards

Flowable Fill Concrete and Installation

Additional Dewatering System Well Points (2)

(includes installation)

Dewatering System, up to 12 well points (includes installation)

Dewatering System, up to 12 well points (includes installation)

Conventional Soil Excavation and Loading > 300 cubic yards

Additional Dewatering System Well Points (2)

(includes installation)

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) ≤ 450 tons

Transport and Disposal of Petroleum Contact Water

(bulk)

Transport and Disposal of Petroleum Contact Water

(includes drum)

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) > 450 tons

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil

(includes drum)

Transport and Disposal of Mixed Debris

Transport and Disposal of Clean Concrete

Loading, Transport and Disposal/Recycle Clean

Overburden

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

10-18.

10-20.

10-21.

10-23.

10-17.

10-13.

10-14.

10-15.

10-15.a.

10-15.b.

10-16.

12-2.

12-9.

12-10.

12-11.

12-12.

12-13.

12-14.

+4.99%

+4.99%

+4.99%

+4.98%

+4.99%

+4.62%

+4.99%

+5.00%

+4.98%

+4.99%

+4.99%

+4.95%

+4.95%

+4.99%

+4.99%

+4.99%

+4.93%

269.22$ $282.65

1.42$ $1.49

179.94$ $188.92

2.94$ $3.08

1.42$ $1.49

0.86$ $0.90

0.33$ $0.34

6,220.63$ $6,531.04

4,785.00$ $5,023.77

94.26$ $98.96

109.79$ $115.27

125.33$ $131.58

10.43$ $10.95

12,503.59$ $13,127.52

15,519.03$ $16,293.43

18,534.49$ $19,459.37

1,223.39$ $1,284.44

4,174.01$ $4,382.29

388.42$ $407.80

4,072.65$ $4,275.88

388.42$ $407.80

4,072.65$ $4,275.88

388.42$ $407.80

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

16-5.

16-6.

15-1.a.

15-1.b.

15-1.c.

16-1.

16-2.

16-3.

16-4.

In-Situ Injection Into Existing Well/Treatment Point

Direct Push Boring with In-Situ Injection

Grass - Seed and Mulch

Grass - Sod

Crushed Lime Rock Cover - 2 inch thickness

Additional Rental of 20 Cubic Yard Roll-Off

Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Product

(includes drum)

Vapor Extraction Pilot Test - Additional Time

Vapor Extraction Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - Additional

Time

Air Sparging or Biosparging Pilot Test - 8 hours

Groundwater Recovery System Pilot Test - Additional

Time

Groundwater Recovery System Pilot Test - 8 hours

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup – Addition of

1 Technology Component

System Installation/Integration/Startup - 1 Technology

Component - 21-30 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 11-20 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 1-10 Recovery/Treatment Points

Installation of Plumbing (and Electrical) Lines Above

Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.

Trenching and Installation of 1-10 Plumbing (and

Electrical) Lines in Trench

14-1.a.

12-18.

13-2.

13-5.

13-6.

13-7.

15-2.a.

15-4.a.

15-4.b.

15-4.c.

15-5.

12-15.

12-16.

14-2.a.

+4.99%

+4.99%

+4.93%

+4.99%

+4.76%

+4.93%

+4.65%

+3.03%

+4.99%

4,072.65$ $4,257.88

388.42$ $407.80

4,222.60$ $4,433.31

388.42$ $407.80

5,645.82$ $5,927.55

388.42$ $407.80

430.62$ $452.11

4,458.19$ $4,680.65

316.94$ $332.76

208.27$ $218.66

950.82$ $998.27

475.40$ $499.12

7,410.08$ $7,779.84

4,716.01$ $4,951.34

11,290.71$ $11,854.12

7,184.42$ $7,542.92

10,237.19$ $10,748.03

3,825.32$ $4,016.20

2,434.04$ $2,555.50

4,261.32$ $4,473.96

2,711.75$ $2,847.07

6,181.62$ $6,490.08

+4.55%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

18-3.

18-4.

18-5.

18-6.

18-7.

18-8.

18-10.

18-2.

18-1.

18-11.

18-12.

18-13.

18-14.

18-15.

16-17.

16-7.

16-8.

16-9.

16-10.

16-11.

16-12.

16-14.

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - Additional

Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Large -

Long Term > 6 mos.

Groundwater Treatment System - Stand Alone

Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone

Medium - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Small -

Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small -

Short Term ≤ 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Short Term ≤ 6 mos.

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Long Term > 6 mos.

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - Additional

Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test -

Additional Time

Air Sparge System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

3,933.63$ $4,129.92

5,004.17$ $5,253.88

5,695.64$ $5,979.85

4,987.38$ $5,236.25

3,173.21$ $3,331.55

7,292.18$ $7,656.06

4,640.02$ $4,871.56

6,054.84$ $6,356.98

231.37$ $242.92

462.73$ $485.82

925.47$ $971.65

126.77$ $133.10

253.55$ $266.20

507.10$ $532.40

4,437.17$ $4,658.48

4,873.64$ $5,116.83

3,803.29$ $3,993.07

5,810.88$ $6,100.84

3,665.65$ $3,848.57

3,512.91$ $3,688.20

4,276.59$ $4,489.99

4,123.84$ $4,329.62

7,942.24$ $8,338.56

+4.99%

18-44.

18-46.

18-47.

18.48.

18-49.

18-50.

18-51.

18-20.

18-16.

18-18.

Thermox/Catox Off Gas Treatment - Add On - Small -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Large - Long

Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long

Term > 6 mos.

MPE System - Large - Long Term > 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Soil Vapor Extraction (SVE) System - Large - Short

Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Long Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Short

Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Small - Short

Term ≤ 6 mos.

Soil Vapor Extraction (SVE) System - Medium -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Long

Term > 6 Months

Soil Vapor Extraction (SVE) System - Small - Short

Term ≤ 6 Months

Thermox/Catox Off Gas Treatment - Add On - Large -

Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small -

Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Short Term ≤ 6 mos.

18-38.

18-35.

18-36.

18-37.

18-23.

18-24.

18-25.

18-26.

18-28.

18-39.

18-40.

18-41.

18-42.

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

9,469.60$ $9,942.13

10,920.58$ $11,465.42

10,615.11$ $11,144.80

2,437.96$ $2,559.61

4,369.58$ $4,587.62

2,476.32$ $2,599.89

807.25$ $847.53

1,896.77$ $1,991.42

2,046.47$ $2,148.59

3,571.47$ $3,749.69

6,625.31$ $6,955.91

10,411.07$ $10,930.58

4,592.98$ $4,822.17

3,290.44$ $3,454.63

379.51$ $398.45

2,320.60$ $2,436.40

4,119.73$ $4,324.30

413.34$ $433.97

139.96$ $146.94

121.84$ $127.92

110.64$ $116.16

105.14$ $110.39

110.54$ $116.06

85.11$ $89.36

76.59$ $80.41

63.73$ $66.91

70.81$ $74.34

54.14$ $56.84

53.31$ $55.97

168.21$ $176.60

168.21$ $176.60

+4.99%

+4.99%

+4.99%

+4.97%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

19-20.

19-21.

19-22.

19-25.

20-9.

20-10.

20-11.

19-17.

19-8.

19-13.

19-14.

19-15.

19-16.

20-8.

20-1.

20-2.

20-3.

20-4.

20-5.

20-6.

20-7.

18-57.

18-58.

19-1.

19-3.

19-4.

19-7.

19-19.

18-55.

Remedial Action Startup Report

Professional Geologist (Key)

Laborers and Security Guards

Administrative

Draftsperson

Field Technician (Key)

Construction Drawings and Specs Report

P.G. Field Oversight of Drilling and Boring and Soil-

Boring Logging (Use hourly rate on site specific basis)

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Supplemental Site Assessment Report

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Short Term ≤ 6 Months

Level 4 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP

Modification Plan

Assistant Scientist/Technical Specialist

Scientist/Technical Specialist (Key)

Hydrogeologist/Modeler (Key)

Geologist/Geoscientist (Key)

Engineer (Key)

Project Manager (Key)

Program Manager (Key)

Free Product Recovery Report

Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non-

Annual

Letter/NPDES Report

21-2.

21-3.

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

168.21$ $176.60

801.12$ $841.10

801.12$ $841.10

1,201.69$ $1,261.65

1,602.25$ $1,682.20

2,002.82$ $2,102.76

200.28$ $210.27

801.12$ $841.10

672.86$ $706.44

552.74$ $580.32

736.99$ $773.77

460.62$ $483.60

300.42$ $315.41

+4.99%

+4.99%

+4.99%

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation System

Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Medium System

P.E. Project Oversight for Remediation System

Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology

Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.E. Review, Evaluation and Certification of a Non-

Annual Natural Attenuation or Post RA Monitoring

Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved

Monitoring Plan

P.G. or Qualified P.E. Review, Evaluation and

Certification of a Supplemental Site Assessment

Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a

Soil Source Removal Report That Includes a

Recommendation for NFA

21-13.

21-15.

21-16.

21-19.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-10.

21-4.

21-5.

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

276.37$ $290.16

400.56$ $420.44

400.56$ $420.55

400.56$ $420.55

200.28$ $210.27

801.12$ $841.10

184.24$ $193.43

552.74$ $580.32

442.00$ $464.06

360.42$ $378.40

+4.99%

+4.96%

+4.99%

+4.99%

+4.99%

+4.99%

21-33.

21-34.

21-35.

21-36.

P.E. Review, Evaluation, and Certification of Annual

PARM Report

P.E. Review, Evaluation, and Certification of

Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

P.E. Review, Evaluation and Certification of a Pilot

Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

Notes:

P.G or P.E. Review, Evaluation and Certification of a

Remedial Action General Report

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of As-Built

Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level

2 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

1 Limited Scope Remedial Action Plan or RAP

Modification Plan

21-29.

21-20.

21-30.

21-21.

21-25.

21-26.

+4.99%

+4.99%

+4.99%

File details come from the government source that posted it. Updated .