Amendment No. 2 to DEP Agency Term Contract No. GC866
This document is Amendment No. 2 to an Agency Term Contract between the Florida Department of Environmental Protection (DEP) and Groundwater and Environmental Services, Inc. The original contract was executed on February 17, 2014, to provide petroleum contamination site response action services in the South Region of Florida. The amendment implements rate increases to the contractor's fee schedule effective for new work assignments issued on or after the Rate Change Date of August 6, 2016.
The rate increases apply exclusively to new work assignments and do not affect previously awarded work or outstanding work assignments, which continue under the prior rate schedule. All requested rate increases are uniformly 5% and do not exceed the maximum allowable increase of 5% specified in contract provision 11.B.ii. The increases apply to 276 pay items across multiple service categories including office activities, field operations, drilling and boring, well installation, sample collection and laboratory analysis, soil source removal, debris removal and disposal, resurfacing, trenching, remediation system construction and operation, reports, and personnel services. The revised rate schedule (Attachment D V2.1) becomes the controlling document for all new work assignments. No changes were made to pay item descriptions or scope of work under the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC866-A11.pdf | ||
| CN-370000-GC866-A16E3.pdf | ||
| CN-370000-GC866-A4.pdf | ||
| CN-370000-GC866-CMC6.pdf | ||
| CN-370000-GC866-CMC7.pdf | ||
| CN-370000-GC866-A15E2.pdf | ||
| CN-370000-GC866-A17.pdf | ||
| CN-370000-GC866-CMC.pdf | ||
| CN-370000-GC866-CMC5.pdf | ||
| CN-370000-GC866-A12.pdf | ||
| CN-370000-GC866-A14E1.pdf | ||
| CN-370000-GC866-A5.pdf | ||
| CN-370000-GC866-A7.pdf | ||
| CN-370000-GC866-A8.pdf | ||
| CN-370000-GC866-A9.pdf | ||
| CN-370000-GC866-AR1.pdf | ||
| CN-370000-GC866-AR1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC866-CMC2.pdf | ||
| CN-370000-GC866-CMC3.pdf | ||
| CN-370000-GC866-CMC4.pdf | ||
| CN-370000-GC866.pdf | ||
| CN-370000-GC811-CO1.pdf | ||
| CN-370000-GC866-A10.pdf | ||
| CN-370000-GC866-A13.pdf | ||
| CN-370000-GC866-A3.pdf | ||
| CN-370000-GC866-A6.pdf | ||
| CN-370000-GC866-CMC1.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
4.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Attachment D, Rate Schedule (V2.1) is hereby added to the Contract and made a part hereof.
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V2.0) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC866 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GROUNDWATER AND ENVIRONMENTAL SERVICES, INC. (hereinafter "Contractor") executed on February 17, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC866
RATE INCREASE
AMENDMENT NO. 2
Amendment No. 2 DEP Agency Term Contract No. GC866
The rate changes specified on Table 1 do not affect any change to Pay Item Descriptions contained in the Contract.
NOW THEREFORE, the parties agree as follows:
Amendment No. 2 DEP Agency Term Contract No. GC866
5. The Rate Change Date is the date shown at the bottom of this document for the Department’s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
6.
Pre-existing Rate
Agreed New Rate(1)
$ 385.00 $ 404.25 $ 100.00 $ 105.00
$ 296.00 $ 310.80
$ 355.00 $ 372.75 $ 415.00 $ 435.75
$ 455.00 $ 477.75
$ 825.00 $ 866.25
$ 350.00 $ 367.50
$ 550.00 $ 577.50
$ 575.00 $ 603.75
$ 865.00 $ 908.25
$ 143.75 $ 150.94
$ 18.00 $ 18.90
$ 21.00 22.05$
$ 21.25 22.31$
$ 24.00 25.20$
$ 26.40 27.72$
$ 30.45 31.97$
$ 31.25 32.81$
$ 38.50 40.43$
$ 42.80 44.94$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
5-2.
5-6.
5-7.
5-12.
5-13.
5-14.
5-8.
Pay Item No.
1-1.
1-2.
1-3.
1-5.
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement
Receptor Survey and Exposure Pathway Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
Description
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Hand Auger Boring ≤ 10 foot total depth
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
5-9.
5-10.
5-11.
Table 1. Listed Schedule of Pay Items with Rate Changes
Est % Rate
Change(2)
+5.00% +5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Pre-existing Rate
Agreed New Rate(1)
$ 29.30 30.77$
$ 33.30 34.97$
$ 40.80 42.84$
$ 33.90 35.60$
$ 40.20 42.21$
$ 50.00 52.50$
$ 60.00 63.00$
$ 73.00 76.65$
$ 98.00 102.90$
$ 35.00 36.75$ $ 46.00 48.30$ $ 38.00 39.90$ $ 43.00 45.15$ $ 49.00 51.45$
$ 54.00 56.70$
$ 6.00 6.30$
$ 6.00 6.30$
$ 6.00 6.30$
$ 7.00 7.35$ $ 175.00 183.75$ $ 530.00 556.50$ $ 950.00 997.50$ $ 26.00 27.30$ $ 325.00 341.25$ $ 555.00 582.75$
$ 135.00 141.75$
$ 168.00 176.40$
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Est % Rate
Change(2)
5-17.
5-18.
5-19.
5-20.
5-21.
5-22.
5-23.
6-2.a.
5-15.
5-16.
Pay Item No.
6-4.
6-9.a.
Grout and Abandon Well, > 4 to 6 inch diameter
Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Description
Installation of Well Vault - 2 x 2 x 2 foot Above Grade Well Completion Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Surface Casing - 12 inch diameter
Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Surface Casing - 8 inch diameter6-6.
6-7.
6-8.
Installation of Well Vault - 4 x 4 x 2 foot
Monitoring Well Sampling with Water Level, > 100 foot depth
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot
6-5.
7-3.
7-5.
6-9.b.
6-9.c.
6-9.d.
6-10.
6-11.
6-12.
7-6.
8-1.
8-2.
Pre-existing Rate
Agreed New Rate(1)
$ 100.00 105.00$
$ 58.00 60.90$
$ 80.00 84.00$
$ 58.00 60.90$
$ 88.00 92.40$
$ 88.00 92.40$
$ 391.00 392.50$
$ 34.50 36.00$
$ 72.45 73.95$
$ 80.50 82.00$
$ 74.75 76.25$
$ 143.75 145.25$
$ 46.00 47.50$
$ 232.00 233.50$
$ 46.00 47.50$
$ 69.00 70.50$
$ 11.50 12.00$
$ 11.50 12.00$
$ 11.50 12.00$
$ 11.50 12.00$
$ 28.75 30.00$
Pay Item No. Description
Est % Rate
Change(2)
+0.38%
+4.35%
+2.07%
+1.86%
+2.01%
+1.04%
+3.26%
+0.65%
+3.26%
+2.17%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
9-12.
9-13.
9-14.
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, PCBs [or Aroclors] (EPA 8082)
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)
Free Product Gauging & Bailing
Soil/Sediment Sample Collection
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Free Product Sample Collection
Other Water Sampling
Domestic Water Well Sampling
9-1.
9-2.
9-4.
9-5.
9-6.
8-3.
8-4.
8-5.
8-6.
8-8.
8-10.
9-15.
9-7.
9-8.
9-8.a.
9-9.
9-10.
9-11. +4.35%
+4.35%
+4.35%
+4.35%
+4.35%
Pre-existing Rate
Agreed New Rate(1)
$ 28.75 30.00$
$ 10.00 10.50$
$ 71.50 73.00$
$ 400.00 401.50$
$ 57.50 59.00$
$ 241.50 243.00$
$ 227.70 229.20$
$ 414.00 415.50$
$ 34.50 36.00$
$ 63.25 64.75$
$ 80.50 82.00$
$ 40.25 41.75$
$ 69.00 70.50$
$ 74.75 76.25$
$ 143.75 145.25$ +1.04%
+2.17%
+2.01%
9-32.
9-24.
9-25.
9-26.
9-27.
9-29.
9-30.
9-31.
9-22.
9-23.
9-33.
9-34.
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Moisture Content (ASTM D2216-10)
Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)
Soil, Texture, (See Gee 7 Bauder [1966])
Description
9-16.
9-19.
9-20.
Pay Item No.
+5.00%
+2.10%
+0.38%
+2.61%
+0.62%
+0.66%
+0.36%
+4.35%
+2.37%
+1.86%
+3.73%
+4.35%
Est % Rate
Change(2)
Pre-existing Rate
Agreed New Rate(1)
$ 143.75 145.25$
$ 46.00 47.50$
$ 46.00 47.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 14.00 14.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 10.00 10.50$
$ 16.50 17.00$
$ 13.80 14.25$
$ 11.50 12.00$
$ 13.80 14.25$
$ 13.80 14.25$
+5.00%
+5.00%
+3.03%
+3.26%
+4.35%
+3.26%
+3.26%
+1.04%
+3.26%
+3.26%
+5.00%
+5.00%
+5.00%
+5.00%
+3.57%
+5.00%
+5.00%
+5.00%
+5.00%
9-48.
9-41.
9-42.
9-43.
9-44.
9-45.
9-46.
9-47.
9-35.
9-36.
9-37.
9-38.
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
9-39.
9-40.
9-50.
9-51.
9-52.
9-53.
9-54.
Pay Item No. Description
Est % Rate
Pre-existing Rate
Agreed New Rate(1)
$ 13.80 14.25$
$ 20.70 21.50$
$ 16.38 16.50$
$ 12.65 13.00$
$ 12.65 13.00$
$ 13.80 14.25$
$ 48.00 49.50$
$ 862.50 864.00$
$ 862.50 864.00$
$ 369.15 370.65$
$ 400.00 401.50$
$ 51.75 53.25$
Pay Item No. Description
Est % Rate
Change(2)
+3.26%
+3.86%
+0.73%
+2.77%
+2.77%
+3.26%
+3.13%
+0.17%
+0.17%
+0.41%
+0.38%
+2.90%
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
9-55.
9-56.
9-66.
9-57.
9-58.
9-59.
9-60.
9-61.
9-62.
9-63.
9-64.
9-65.
Pre-existing Rate
Agreed New Rate(1)
$ 241.50 243.00$
$ 258.75 260.25$
$ 400.00 401.50$
$ 35.00 36.75$
$ 27.00 28.35$
$ 120.00 126.00$
$ 36.00 37.80$
$ 1,800.00 1,890.00$
$ 125.00 131.25$
$ 8,700.00 9,135.00$
$ 330.00 346.50$
$ 9,500.00 9,975.00$
$ 400.00 420.00$
$ 7,700.00 8,085.00$
$ 9,100.00 9,555.00$
$ 11,500.00 12,075.00$
$ 8.00 8.40$
$ 1.75 1.84$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+0.58%
+0.62%
10-18.
10-19.
10-20.
10-21.
10-22.
10-23.
13-1.
13-2.
10-14.
11-3.
11-4.
Asphalt Paving - additional 1 inch thickness
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
Asphalt Paving - 2 inch thickness (includes sub-base)
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
9-67.
10-7.
10-8.
10-9.
9-72.
9-73.
11-2.
+5.00%
+5.00%
+5.00%
+5.00%
+0.38%
Pay Item No. Description
Est % Rate
Pre-existing Rate
Agreed New Rate(1)
$ 8.50 8.93$
$ 2.00 2.10$
$ 2.80 2.94$
$ 1.50 1.58$
$ 0.50 0.53$
$ 26.00 27.30$
$ 2,500.00 2,625.00$
$ 2,590.00 2,719.50$
$ 590.00 619.50$
$ 2,360.00 2,478.00$
$ 590.00 619.50$
$ 2,360.00 2,478.00$
$ 590.00 619.50$
$ 2,360.00 2,478.00$
$ 590.00 619.50$
$ 2,590.00 2,719.50$
$ 590.00 619.50$
$ 2,590.00 2,719.50$
$ 590.00 619.50$
$ 2,950.00 3,097.50$
$ 7,620.00 8,001.00$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
15-5.
14-1.
13-3.
13-4.
13-5.
13-6.
13-7.
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional Time
Groundwater Recovery System Pilot Test - 8 hours
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
System Installation/Integration/Startup – Addition of 1 Technology Component
Direct Push Boring with In-Situ Injection
Grass - Seed and Mulch
Grass - Sod
Crushed Lime Rock Cover - 2 inch thickness
16-1.
16-2.
16-3.
16-4.
16-5.
16-18.
16-17.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
16-12.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Pay Item No. Description
Est % Rate
Change(2)
+5.00%
Pre-existing Rate
Agreed New Rate(1)
$ 1,532.05 1,608.65$
$ 5,014.10 5,264.81$
$ 2,518.75 2,644.69$
$ 6,987.50 7,336.88$
$ 2,295.65 2,410.43$
$ 6,541.30 6,868.37$
$ 1,500.00 1,575.00$
$ 1,782.00 1,871.10$
$ 2,125.00 2,231.25$
$ 2,670.00 2,803.50$
$ 210.00 220.50$
$ 424.00 445.20$
$ 995.40 1,045.17$
$ 862.68 905.81$
$ 5,451.00 5,723.55$
$ 3,929.46 4,125.93$
$ 6,079.05 6,383.00$
$ 4,894.05 5,138.75$
$ 6,517.50 6,843.38$
$ 5,432.50 5,704.13$
$ 1,759.00 1,846.95$
$ 1,759.00 1,846.95$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos.
Supplemental System O&M Package - Add Thermox or Catox Treatment
Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos.
System O&M Package - Extra Large
System O&M Package - Large
System O&M Package - Medium
System O&M Package - Small
MPE System Package - Medium
MPE System Package - Medium
AS/SVE System Package - Medium
AS/SVE System Package - Medium
Air Sparge System Package - Medium
Air Sparge System Package - Medium16-19.
16-20.
16-21.
16-22.
16-23.
16-24.
18-3.
18-4.
18-5.
18-6.
18-7.
18-8.
18-9.
18-10.
17-1.
17-2.
17-3.
17-4.
17-5.
18-1.
18-11.
18-12.
Pay Item No. Description
Est % Rate
Pre-existing Rate
Agreed New Rate(1)
$ 1,996.00 2,095.80$
$ 1,996.00 2,095.80$
$ 2,470.00 2,593.50$
$ 2,470.00 2,593.50$
$ 2,233.00 2,344.65$
$ 2,133.00 2,239.65$
$ 2,470.00 2,593.50$
$ 2,470.00 2,593.50$
$ 2,944.00 3,091.20$
$ 2,944.00 3,091.20$
$ 2,784.00 2,923.20$
$ 2,684.03 2,818.23$
$ 3,495.00 3,669.75$
$ 3,495.00 3,669.75$
$ 4,454.00 4,676.70$
$ 4,454.00 4,676.70$
$ 3,929.46 4,125.93$
$ 3,906.00 4,101.30$
$ 5,332.50 5,599.13$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
18-15.
18-16.
18-17.
18-18.
18-19.
18-29.
18-30.
18-31.
18-23.
18-24.
18-25.
18-26.
18-27.
18-28.
Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.
MPE System - Large - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
Air Sparge System - Medium - Short Term ≤ 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
18-21.
18-22.
18-20.
18-13.
18-14.
+5.00%
+5.00%
Pay Item No. Description
Est % Rate
Pre-existing Rate
Agreed New Rate(1)
$ 3,929.46 4,125.93$
$ 4,894.05 5,138.75$
$ 5,332.50 5,599.13$
$ 216.26 227.07$
$ 432.53 454.16$
$ 796.32 836.14$
$ 118.50 124.43$
$ 237.00 248.85$
$ 500.00 525.00$
$ 3,081.00 3,235.05$
$ 3,318.00 3,483.90$
$ 4,740.00 4,977.00$
$ 2,962.50 3,110.63$
$ 3,199.50 3,359.48$
$ 4,621.50 4,852.58$
$ 1,600.00 1,680.00$ $ 1,650.00 1,732.50$ $ 975.00 1,023.75$ $ 1,050.00 1,102.50$
$ 515.00 540.75$
$ 1,110.00 1,165.50$
$ 796.67 836.50$ $ 1,300.00 1,365.00$
Pay Item No. Description
Est % Rate
Change(2)
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
18-39.
18-40.
18-41.
18-42.
18-38.
18-32.
18-33.
18-34.
18-35.
18-36.
18-37.
Pilot Test Report Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report Supplemental Site Assessment Report Soil Source Removal Report
Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large
- Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small
- Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large
- Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small
- Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Small - Long Term > 6 mos.
18-43.
18-44.
18-45.
18-46.
19-1.
19-4.
19-5.
19-6.
19-7.
19-8.
19-9.
19-10.
Pre-existing Rate
Agreed New Rate(1)
$ 9,650.00 10,132.50$
$ 12,950.00 13,597.50$
$ 1,500.00 1,575.00$
$ 2,800.00 2,940.00$
$ 6,700.00 7,035.00$
$ 3,500.00 3,675.00$
$ 650.00 682.50$
$ 2,550.00 2,677.50$
$ 300.00 315.00$
$ 1,681.65 1,765.73$
$ 1,100.00 1,155.00$
$ 578.00 606.90$
$ 275.00 288.75$
$ 98.00 102.90$
$ 85.00 89.25$
$ 78.00 81.90$
$ 78.00 81.90$
$ 78.00 81.90$
$ 68.00 71.40$
$ 60.00 63.00$
$ 65.00 68.25$
$ 55.00 57.75$
$ 48.00 50.40$
$ 45.00 47.25$
$ 98.00 102.90$
$ 96.00 100.80$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
20-3.
20-4.
20-5.
20-6.
20-7.
21-2.
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Remedial Action Plan
Assistant Scientist/Technical Specialist
Scientist/Technical Specialist (Key)
Hydrogeologist/Modeler (Key)
Geologist/Geoscientist (Key)
Engineer (Key)
Project Manager (Key)
Program Manager (Key)
Well Abandonment/Site Restoration Report
Remedial Action Interim Report
Remedial Action General Report
Operation & Maintenance Report, Quarterly or Non- Annual
Letter/NPDES Report
Level 1 Remedial Action Plan
Construction Drawings and Specs Report
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key)
Professional Engineer (Key)
Laborers and Security Guards
Administrative
Draftsperson
Field Technician (Key)
19-18.
19-19.
19-20.
19-21.
19-23.
19-24.
20-9.
20-10.
20-11.
21-1.
19-17.
19-11.
19-12.
19-13.
19-14.
19-16.
20-8.
19-26.
20-1.
20-2.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Pay Item No. Description
Est % Rate
Pre-existing Rate
Agreed New Rate(1)
$ 96.00 100.80$
$ 96.00 100.80$
$ 294.00 308.70$
$ 784.00 823.20$
$ 1,176.00 1,234.80$
$ 1,568.00 1,646.40$
$ 2,352.00 2,469.60$
$ 196.00 205.80$
$ 490.00 514.50$
$ 392.00 411.60$
$ 490.00 514.50$
$ 384.00 403.20$
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-7.a.
21-7.b.
21-8.
21-9.
21-10.
21-3.
21-4.
21-5.
P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Project Oversight for Remediation System Operation and Maintenance
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis
P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System Integration and Startup - Large System
P.E. Project Oversight for Remediation System Integration and Startup - Medium System
P.E. Project Oversight for Remediation System Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)
+5.00%
Pay Item No. Description
Est % Rate
Pre-existing Rate
Agreed New Rate(1)
$ 1,176.00 1,234.80$
$ 288.00 302.40$
$ 196.00 205.80$
$ 196.00 205.80$
$ 196.00 205.80$
$ 196.00 205.80$
$ 98.00 102.90$
$ 196.00 205.80$
$ 196.00 205.80$
$ 196.00 205.80$
$ 294.00 308.70$
$ 588.00 617.40$
+5.00%
+5.00%
+5.00%
21-21.
21-22.
21-23.
21-11.
21-12.
21-13.
21-15.
21-16.
21-17.
21-18.
21-19.
21-20.
P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report
P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA
P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan
P.E. Review, Evaluation and Certification of a Level 2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report
P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot Test Report
P.E. Review, Evaluation and Certification of a Pilot Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Pay Item No. Description
Est % Rate
Change(2)
+5.00%
Pre-existing Rate
Agreed New Rate(1)
$ 980.00 1,029.00$
$ 98.00 102.90$
$ 196.00 205.80$
$ 392.00 411.60$
$ 588.00 617.40$
$ 196.00 205.80$
$ 294.00 308.70$
$ 196.00 205.80$
$ 294.00 308.70$
$ 98.00 102.90$
$ 196.00 205.80$
+5.00%
+5.00%
+5.00%
21-30.
21-24.
21-25.
21-26.
21-27.
21-28.
21-29.
P.E. Review, Evaluation and Certification of As- Built Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
21-31.
21-32.
21-33.
21-34.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
Pay Item No. Description
Est % Rate
Notes:
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
PAY
ITEM UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
1.
1-1. Per Review $ 385.00 $ 385.00 $ 404.25 1-2. Per Site $ 100.00 $ 100.00 $ 105.00
1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 296.00 $ 296.00 $ 310.80 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 355.00 $ 355.00 $ 372.75
1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.
2-1. Per Visit $ 415.00 $ 415.00 $ 435.75 2-2. Per Survey $ 455.00 $ 455.00 $ 477.75 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 825.00 $ 825.00 $ 866.25 3.
3-1. Per Round Trip $ 350.00 $ 350.00 $ 367.50 3-2. Per Round Trip $ 550.00 $ 550.00 $ 577.50 3-3. Per Round Trip $ 575.00 $ 575.00 $ 603.75 3-4. Per Round Trip $ 865.00 $ 865.00 $ 908.25 3-5. Per Round Trip $ 115.00 $ 115.00 $ 115.00 3-6. Per Round Trip $ 172.50 $ 172.50 $ 172.50
DESCRIPTION
OFFICE ACTIVITIES
File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order) Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - ≤ 100 miles each way Work Trailer - > 100 miles each way
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
3-7. Per Round Trip $ 488.75 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 800.00 $ 800.00 3-8. Per Round Trip $ 575.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 1,150.00 $ 1,150.00 3-9. Per Round Trip $ 488.75 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 1,000.00 $ 1,000.00
3-10. Per Round Trip $ 575.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,310.00 $ 1,310.00
3-11. Per Round Trip $ 690.00 $ 690.00 $ 690.00 3-12. Per Round Trip $ 1,035.00 $ 1,035.00 $ 1,035.00 3-13. Per Round Trip $ 8,625.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 20,520.00 $ 20,520.00 3-14. Per Round Trip $ 11,500.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 27,000.00 $ 27,000.00 3-15. Per Round Trip $ 575.00 $ 575.00 $ 575.00 3-16. Per Round Trip $ 690.00 $ 690.00 $ 690.00 3-17. Per Round Trip $ 460.00 $ 460.00 $ 460.00 3-18. Per Round Trip $ 575.00 $ 575.00 $ 575.00 3-19. Per Round Trip Not Applicable $ 500.00 $ 500.00 3-20. Per Round Trip Not Applicable $ 775.00 $ 775.00
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - ≤ 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way Drill Rig Mobilization - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - ≤ 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - ≤ 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - ≤ 100 miles each way LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way LDA Rig Mobilization - > 100 miles each way
Drum Compactor mobilization - > 100 miles each way
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
4.
4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 30.30 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 38.00 $ 38.00 5-1.a.2. Per Spoon Not Applicable $ 42.00 $ 42.00 5-1.a.3. Per Spoon Not Applicable $ 52.00 $ 52.00 5-1.b. Per Core $ 135.00 $ 135.00 $ 135.00 5-1.c. Per Core $ 16.80 Not Applicable Not Applicable 5-2. Per Boring $ 143.75 $ 143.75 $ 150.94 5-3. Per Foot $ 14.00 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 3,050.00 $ 3,050.00 5-4. Per Foot $ 17.45 Not Applicable Not Applicable 5-5. Per Foot $ 27.80 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 3,160.00 $ 3,160.00
5-6. Per Foot $ 18.00 $ 18.00 $ 18.90
Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring ≤ 10 foot total depth
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
5-7. Per Foot $ 21.00 $ 21.00 $ 22.05 5-8. Per Foot $ 21.25 $ 21.25 $ 22.31 5-9. Per Foot $ 24.00 $ 24.00 $ 25.20
5-10. Per Foot $ 26.40 $ 26.40 $ 27.72 5-11. Per Foot $ 30.45 $ 30.45 $ 31.97 5-12. Per Foot $ 31.25 $ 31.25 $ 32.81 5-13. Per Foot $ 38.50 $ 38.50 $ 40.43 5-14. Per Foot $ 42.80 $ 42.80 $ 44.94 5-15. Per Foot $ 29.30 $ 29.30 $ 30.77 5-16. Per Foot $ 33.30 $ 33.30 $ 34.97 5-17. Per Foot $ 40.80 $ 40.80 $ 42.84 5-18. Per Foot $ 33.90 $ 33.90 $ 35.60 5-19. Per Foot $ 40.20 $ 40.20 $ 42.21 5-20. Per Foot $ 50.00 $ 50.00 $ 52.50 5-21. Per Foot $ 60.00 $ 60.00 $ 63.00 5-22. Per Foot $ 73.00 $ 73.00 $ 76.65 5-23. Per Foot $ 98.00 $ 98.00 $ 102.90
6.
6-1. Per Foot $ 32.00 $ 32.00 $ 32.00 6-2. Per Foot $ 32.00 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 35.00 $ 36.75 6-2.b. Per Foot Not Applicable $ 185.00 $ 185.00
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
6-3. Per Foot $ 41.00 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 45.00 $ 45.00 6-3.b. Per Foot Not Applicable $ 200.00 $ 200.00 6-4. Per Foot $ 46.00 $ 46.00 $ 48.30 6-5. Per Foot $ 38.00 $ 38.00 $ 39.90 6-6. Per Foot $ 43.00 $ 43.00 $ 45.15 6-7. Per Foot $ 49.00 $ 49.00 $ 51.45 6-8. Per Foot $ 54.00 $ 54.00 $ 56.70
6-9.a. Per Foot $ 6.00 $ 6.00 $ 6.30 6-9.b. Per Foot $ 6.00 $ 6.00 $ 6.30 6-9.c. Per Foot $ 6.00 $ 6.00 $ 6.30 6-9.d. Per Foot $ 7.00 $ 7.00 $ 7.35 6-10. Per Well $ 175.00 $ 175.00 $ 183.75 6-11. Per Vault $ 530.00 $ 530.00 $ 556.50 6-12. Per Vault $ 950.00 $ 950.00 $ 997.50 6-13. Per Well Not Applicable $ 195.00 $ 195.00
6-14. Per Well Not Applicable $ 350.00 $ 350.00
6-15. Per Well Not Applicable $ 400.00 $ 400.00
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)
Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
7.
7-1. Per Foot $ 18.95 $ 18.95 $ 18.95 7-2. Per Foot $ 21.90 $ 21.90 $ 21.90 7-3. Per Foot $ 26.00 $ 26.00 $ 27.30 7-4. Per Foot $ 30.50 $ 30.50 $ 30.50 7-5. Per Vault $ 325.00 $ 325.00 $ 341.25 7-6. Per Vault $ 555.00 $ 555.00 $ 582.75 7-7 Per Well Not Applicable $ 220.00 $ 220.00 8.
8-1. Per Well $ 135.00 $ 135.00 $ 141.75 8-2. Per Well $ 168.00 $ 168.00 $ 176.40 8-3. Per Well $ 100.00 $ 100.00 $ 105.00 8-4. Per Sample $ 58.00 $ 58.00 $ 60.90 8-5. Per Sample $ 80.00 $ 80.00 $ 84.00 8-6. Per Sample $ 58.00 $ 58.00 $ 60.90 8-7. Per Well $ 25.00 $ 25.00 $ 25.00 8-8. Per Well $ 88.00 $ 88.00 $ 92.40
8-9. Per Sample $ 88.00 $ 88.00 $ 88.00
8-10. Per Sample $ 88.00 $ 88.00 $ 92.40 8-11. Per Sampling Event Not Applicable $ 100.00 $ 100.00 8-12. Per Well Not Applicable $ 75.00 $ 75.00
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole
Survey Latitude/Longitude of Existing Monitor Wells
Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
8-13. Per Well Not Applicable $ 75.00 $ 75.00
8-14 Per Sample Not Applicable $ 17.50 $ 17.50
9.
9.A.
9-1. Per Sample $ 391.00 $ 391.00 $ 392.50
9-2. Per Sample $ 34.50 $ 34.50 $ 36.00 9-3. Per Sample $ 63.25 $ 63.25 $ 63.25 9-4. Per Sample $ 72.45 $ 72.45 $ 73.95 9-5. Per Sample $ 80.50 $ 80.50 $ 82.00 9-6. Per Sample $ 74.75 $ 74.75 $ 76.25
9-7. Per Sample $ 143.75 $ 143.75 $ 145.25
9-8. Per Sample $ 46.00 $ 46.00 $ 47.50 9-8.a. Per Sample Not Applicable $ 232.00 $ 233.50 9-9. Per Sample $ 46.00 $ 46.00 $ 47.50
9-10. Per Sample $ 69.00 $ 69.00 $ 70.50
9-11. Per Sample $ 11.50 $ 11.50 $ 12.00
Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
9-12. Per Sample $ 11.50 $ 11.50 $ 12.00 9-13. Per Sample $ 11.50 $ 11.50 $ 12.00 9-14. Per Sample $ 11.50 $ 11.50 $ 12.00 9-15. Per Sample $ 28.75 $ 28.75 $ 30.00 9-16. Per Sample $ 28.75 $ 28.75 $ 30.00 9-17. Per Sample $ 46.00 $ 46.00 $ 46.00
9-18. Per Sample $ 74.75 $ 74.75 $ 74.75
9-19. Per Sample $ 10.00 $ 10.00 $ 10.50 9-20. Per Sample $ 71.50 $ 71.50 $ 73.00
9-21. Per Sample $ 368.00 $ 368.00 $ 368.00
9-22. Per Sample $ 400.00 $ 400.00 $ 401.50
9-23. Per Sample $ 57.50 $ 57.50 $ 59.00
9-24. Per Sample $ 241.50 $ 241.50 $ 243.00 9.B.
9-25. Per Sample $ 227.70 $ 227.70 $ 229.20
9-26. Per Sample $ 414.00 $ 414.00 $ 415.50
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP Restated Agency Term Contract No. GC866 Amendment No. 2
Attachment D (V2.1) ‐ Rate Schedule
9-27. Per Sample $ 34.50 $ 34.50 $ 36.00 9-28. Per Sample $ 63.25 $ 63.25 $ 63.25 9-29. Per Sample $ 63.25 $ 63.25 $ 64.75
9-30. Per Sample $ 80.50 $ 80.50 $ 82.00
9-31. Per Sample $ 40.25 $ 40.25 $ 41.75 9-31.a. Per Sample Not Applicable $ 58.00 $ 58.00 9-32. Per Sample $ 69.00 $ 69.00 $ 70.50 9-33. Per Sample $ 74.75 $ 74.75 $ 76.25
9-34. Per Sample $ 143.75 $ 143.75 $ 145.25
9-35. Per Sample $ 143.75 $ 143.75 $ 145.25
9-36. Per Sample $ 46.00 $ 46.00 $ 47.50 9-37. Per Sample $ 46.00 $ 46.00 $ 47.50 9-38. Per Sample $ 10.00 $ 10.00 $ 10.50 9-39. Per Sample $ 10.00 $ 10.00 $ 10.50 9-40. Per Sample $ 10.00 $ 10.00 $ 10.50 9-41. Per Sample $ 10.00 $ 10.00 $ 10.50
9-41.a. Per Sample Not Applicable $ 35.00 $ 35.00
9-42. Per Sample $ 14.00 $ 14.00 $ 14.50
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
DESCRIPTION
Region:
Contractor:
Contract #:
South
GROUNDWATER AND ENVIRONMENTAL SERVICES, INC.
GC866
DEP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .