CN-370000-GC862-A14.pdf

PDF 963 KB Posted

Attached to
Master Agreement FL|GC862|bff79d421ed35a1bc5229cff70e560e4
Contract number
GC862
Issued by
Florida

About this file

Summary

This is Amendment No. 14 to Agency Term Contract No. GC862 between the Florida Department of Environmental Protection (FDEP) and GEO Resources & Engineering, Inc. The contract provides petroleum contamination site response action services in the South Region of Florida. The amendment was executed on May 13, 2024, and modifies rates previously established under the original contract dated March 3, 2014.

The amendment implements a 5% rate increase across the contractor's rate schedule, with the increases effective for all new work assignments offered on or after the Rate Change Date of June 10, 2024. The rate adjustments apply to over 400 pay items covering mobilization services, drilling and boring operations, well installation and abandonment, sampling and analytical testing, soil and groundwater treatment systems, remediation technology pilot testing, and professional services including engineering and geological oversight. Rates for individual line items range from $1.35 to $11,284.43, with the contractor's increases justified under contract provision 11.B and approved by the FDEP. Pre-existing work assignments and previously offered assignments retain their prior rates. The updated Rate Schedule (V3.5) becomes effective upon completion of the Department's data processing, with notification provided to the contractor within five business days of data entry.

View the file

Other files

File Type Posted
CN-370000-GC862-A11.pdf PDF
CN-370000-GC862-A15E2.pdf PDF
CN-370000-GC862-A8.pdf PDF
CN-370000-GC862-CMC2.pdf PDF
CN-370000-GC862-A10.pdf PDF
CN-370000-GC862-A16.pdf PDF
CN-370000-GC862-A4.pdf PDF
CN-370000-GC862-A5.pdf PDF
CN-370000-GC862-A6.pdf PDF
CN-370000-GC862-A9.pdf PDF
CN-370000-GC862-CMC3.pdf PDF
CN-370000-GC810-CMC4.pdf PDF
CN-370000-GC862-A12.pdf PDF
CN-370000-GC862-A13E1.pdf PDF
CN-370000-GC862-A3.pdf PDF
CN-370000-GC862-CMC.pdf PDF
CN-370000-GC862.pdf PDF
CN-370000-GC862-A17.pdf PDF
CN-370000-GC862-A2.pdf PDF
CN-370000-GC862-A7.pdf PDF
CN-370000-GC862-AR1.pdf PDF
CN-370000-GC862-AR1.pdf.crdownload CRDOWNLOAD file
CN-370000-GC862-CMC1.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC862 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GEO RESOURCES & ENGINEERING, INC. (hereinafter "Contractor") executed on March 3, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC862

RATE INCREASE

AMENDMENT NO. 14

Amendment No. 14 DEP Agency Term Contract No. GC862

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 14 DEP Agency Term Contract No. GC862

4.

5.

6.

Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

131.26$ $137.82 131.26$ $137.82

131.26$ $137.82

131.26$ $137.82 393.81$ $413.50

656.37$ $689.18

656.37$ $689.18

287.53$ $301.90

575.10$ $603.85

1,163.86$ $1,222.05

359.43$ $377.40

912.87$ $958.51

1,417.55$ $1,488.42

1,078.28$ $1,132.19

1,417.55$ $1,488.42

790.66$ $830.19

6,326.18$ $6,642.48

10,239.79$ $10,751.77

431.31$ $452.87

646.95$ $679.29

323.48$ $339.65

Est %

Rate

Change (2)

+5.00% +5.00%

+5.00%

+5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

2-1.

2-2.

2-4.

3-1.

3-2.

3-4.

3-15.

3-16.

3-17.

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule Activities

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Pay

Item No.

1-1.

1-2.

1-3.

1-5.

3-14.a.

3-6.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

3-11.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

467.26$ $490.62

434.12$ $455.82

711.63$ $747.21

39.89$ $41.88

41.49$ $43.56

44.42$ $46.64

159.01$ $166.96

2,656.76$ $2,789.59

431.31$ $452.87

23.40$ $24.57

24.52$ $25.74

28.85$ $30.29

26.30$ $27.61

26.85$ $28.19

31.36$ $32.92

37.14$ $38.99

38.75$ $40.68

45.82$ $48.11

35.92$ $37.71

43.10$ $45.25

50.29$ $52.80

+4.97%

+4.98%

+4.98%

+5.00%

3-18.

3-19.

3-20.

5-9.

5-10.

5-11.

Hand Auger Boring ≤ 10 foot total depth

Split Spoon Sampling – 2 foot (during boring) > 100 feet

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)

Direct Push Technology (DPT) Rig and Equipment

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Drum Compactor mobilization - > 100 miles each way

Drum Compactor mobilization - ≤ 100 miles each way

Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way

5-1.a.1.

5-1.a.2.

5-1.a.3.

5-2.

5-3.a.

5-5.a.

5-6.

5-7.

5-17.

5-12.

5-13.

5-14.

5-15.

5-16.

5-8.

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.98%

+4.99%

+4.98%

+4.99%

+4.98%

+4.99%

+4.99%

43.11$ $45.26

50.29$ $52.80

57.49$ $60.36

57.49$ $60.36

64.69$ $67.92

79.05$ $83.00

39.89$ $41.88 56.80$ $59.64 65.88$ $69.17 40.34$ $42.35

5.74$ $6.02

8.61$ $9.04

10.04$ $10.54

11.49$ $12.06

433.90$ $455.59 575.10$ $603.85 862.65$ $905.78 115.72$ $121.50

307.04$ $322.39

372.63$ $391.26

17.64$ $18.52

21.16$ $22.21

25.77$ $27.05

30.32$ $31.83 359.40$ $377.37 575.10$ $603.85 115.60$ $121.38

6-5.

Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot

Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Well Redevelopment Installation of Well Vault - 4 x 4 x 2 foot Installation of Well Vault - 2 x 2 x 2 foot

6-9.a.

7-2.

7-3.

7-4.

7-5.

7-1.

6-9.b.

6-9.c.

6-9.d.

6-10.

6-11.

6-12.

6-13.

6-14.

6-15.

7-6.

7-7.

Surface Casing - 6 inch diameter

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, > 6 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Above Grade Well Completion

Additional Well Screen > 20 feet - 6 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Well Installation - 6 inch diameter Well Installation - 4 inch diameter (vertical)6-3.a.

6-4.

5-18.

5-19.

5-20.

5-21.

5-22.

5-23.

6-2.a.

+4.99% +4.98%

+4.88%

+4.99%

+4.98%

+4.96%

+5.00% +5.00% +5.00% +4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+4.99% +5.00%

+5.00%

+5.00%

+4.99%

+4.96%

+4.97%

+4.98% +5.00% +5.00%

143.76$ $150.94

143.76$ $150.94

71.87$ $75.46 71.87$ $75.46 71.87$ $75.46 71.87$ $75.46 71.87$ $75.46

71.87$ $75.46

50.29$ $52.80

50.29$ $52.80

50.29$ $52.80

21.54$ $22.61

488.82$ $513.26

43.11$ $45.26

77.61$ $81.49

90.55$ $95.07

100.61$ $105.64

93.44$ $98.11

179.71$ $188.69

287.53$ $301.90

57.49$ $60.36

+4.99%

+4.99%

8-14.

9-1.

9-2.

9-3.

9-4.

9-5.

9-6.

8-12.

8-3.

8-4.

8-5.

8-6.

8-8.

8-10.

8-11.

9-7.

9-8.a.

9-9.

Free Product Sample Collection Other Water Sampling Domestic Water Well Sampling

Monitoring Well Sampling with Water Level, > 100 foot depth

Monitoring Well Sampling with Water Level, ≤ 100 foot depth8-1.

8-2.

8-13.

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Survey Latitude/Longitude of New Monitor Wells

Survey Latitude/Longitude of Existing Monitor Wells

Electronic Data Deliverables (EDD)

Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)

Free Product Gauging & Bailing Soil/Sediment Sample Collection

Soil, Volatile Organic Halocarbons (EPA 8021 or

EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, PCBs [or Aroclors] (EPA 8082)

+4.97%

+5.00%

+4.99%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+5.00% +5.00% +5.00% +5.00% +5.00%

+5.00%

+4.99%

86.24$ $90.55

14.36$ $15.07 14.36$ $15.07 14.36$ $15.07 14.36$ $15.07

35.92$ $37.71

35.92$ $37.71

57.49$ $60.36

7.17$ $7.52

215.62$ $226.40

215.62$ $226.40

71.87$ $75.46

215.62$ $226.40

284.66$ $298.89

414.06$ $434.76

43.11$ $45.26

74.74$ $78.47

80.50$ $84.52

+4.88%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+4.94% +4.94% +4.94% +4.94%

+4.98%

+4.98%

+4.99%

9-16.

9-17.

9-19.

9-15.

9-10.

9-11.

9-12.

9-13.

9-14.

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Organic Carbon, Total (EPA 9060 or Walkey- Black)

Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution

GC/MS)

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])

9-24.

9-25.

9-26.

9-27.

9-28.

9-29.

9-21.

9-22.

9-23.

100.62$ $105.65

51.75$ $54.33

71.87$ $75.46

86.24$ $90.55

93.44$ $98.11

179.71$ $188.69

179.71$ $188.69

57.49$ $60.36

57.49$ $60.36

11.49$ $12.06

11.49$ $12.06

11.49$ $12.06

11.49$ $12.06

22.99$ $24.13

11.49$ $12.06

11.49$ $12.06

11.49$ $12.06

11.49$ $12.06

11.49$ $12.06

+5.00%

+4.99%

+5.00%

Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Total Recoverable Petroleum Hydrocarbons

(FL-PRO)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, Priority Pollutant Volatile Organics (EPA 8260)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-32.

9-30.

9-31.

9-31.a.

9-41.

9-42.

9-43.

9-44.

9-45.

9-46.

9-47.

9-39.

9-40.

9-33.

9-34.

9-35.

9-36.

9-37.

9-38.

+5.00%

+5.00%

+4.99%

+4.99%

+4.96%

+4.96%

+4.96%

+4.96%

+4.96%

+5.00%

+5.00%

+4.96%

+4.96%

+4.96%

+4.96%

+4.96%

11.49$ $12.06

14.36$ $15.07

19.38$ $20.34

17.24$ $18.10

14.36$ $15.07

17.24$ $18.10

17.24$ $18.10

17.24$ $18.10

25.73$ $27.01

19.38$ $20.34

14.35$ $15.06

15.78$ $16.56

17.24$ $18.10

43.11$ $45.26

1,078.22$ $1,132.13

1,078.22$ $1,132.13

9-57.

9-58.

9-59.

9-60.

9-61.

9-62.

9-63.

9-49.

9-50.

9-51.

9-52.

9-53.

9-54.

9-55.

9-56.

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

9-48. +4.96%

+4.94%

+4.95%

+4.99%

+4.94%

+4.99%

+4.99%

+4.99%

+4.97%

+4.95%

+4.95%

+4.94%

+4.99%

+4.99%

+5.00%

215.62$ $226.40

215.62$ $226.40

64.69$ $67.92

215.62$ $226.40

84.75$ $88.98

100.62$ $105.65

208.46$ $218.88

201.26$ $211.32

358.62$ $376.55

215.64$ $226.42

215.64$ $226.42 +5.00%

9-66.

9-64.

9-65.

9-72.

9-73.

9-67.

9-78.

9-68.

9-69.

9-70.

9-71.

Air, Polycyclic Aromatic Hydrocarbons (EPA Method

TO-13)

Air, Volatile Organic Aromatics (EPA Method TO- 15)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)

Air, Volatile Organic Compounds (EPA Method TO- 17)

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution

GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

1.29$ $1.35

7.88$ $8.27

11.04$ $11.59

43.10$ $45.25

7.88$ $8.27

11.04$ $11.59

50.59$ $53.11

115.02$ $120.77

107.81$ $113.20

158.13$ $166.03

258.78$ $271.59

157.91$ $165.80

244.40$ $256.62

130.06$ $136.56

37.36$ $39.22

31.61$ $33.19

15.78$ $16.56

+4.98%

+4.98%

+5.00%

+5.00%

+5.00%

+4.95%

+5.00%

+5.00%

+5.00%

+4.98%

+5.00%

+4.94%

+4.65%

+4.95%

+4.98%

+4.99%

+4.95%10-2.c.

10-2.d.

10-7.

10-9.

10-10.

10-2.a.

9-77.

10-1.c.

10-1.d.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.

The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards

Flowable Fill Concrete and Installation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

LDA Excavation and Loading With Driven Casing > 300 cubic yards

LDA Excavation and Loading With Surface Casing > 300 cubic yards

LDA Excavation and Loading With Driven Casing < 300 cubic yards

LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Installation for > 20 feet deep Excavation

10-11.a.

10-11.b.

10-12.a.

10-12.b.

10-13.

10-14.

10-15.

10-15.a.

15.78$ $16.56

69.10$ $72.55

8,626.61$ $9,057.94

431.19$ $452.74

4,133.00$ $4,339.65

5,787.00$ $6,076.35

7,439.88$ $7,811.87

10,747.08$ $11,284.43

2.12$ $2.22

0.69$ $0.72

64.69$ $67.92

208.46$ $218.88

35.58$ $37.35

51.75$ $54.33

37.36$ $39.22

37.36$ $39.22

40.25$ $42.26

40.25$ $42.26

260.12$ $273.12

273.13$ $286.78

1.76$ $1.84

862.65$ $905.78

+4.94%

12-5.

12-6.

12-7.

#57 Stone

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Dewatering System, up to 12 well points (includes installation)

Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity

Additional Dewatering System Well Points (2) (includes installation)

Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons

Transport Petroleum Impacted Soil (bulk) > 100 miles

Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Product (includes drum)

Transport and Disposal of Petroleum Contact Water (includes drum)

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport and Disposal of Mixed Debris

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity

10-20.

10-23.

12-17.

10-17.

10-15.b.

12-8.

11-3.

11-4.

12-1.

12-2.

11-1.

11-2.

12-9.

12-10.

12-11.

12-12.

12-13.

12-15.

12-16.

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+4.72%

+4.35%

+4.99%

+5.00%

+4.97%

+4.99%

+4.98%

+4.98%

+4.99%

+4.99%

+5.00%

+5.00%

+4.55%

50.29$ $52.80

7.17$ $7.52

2.86$ $3.00

8.24$ $8.65

1.42$ $1.49 0.69$ $0.72 0.34$ $0.35

5,411.99$ $5,682.58

4,564.35$ $4,792.56

5,723.68$ $6,009.86

8,736.16$ $9,172.96

37.36$ $39.22

47.42$ $49.79 63.24$ $66.40

15.78$ $16.56

15.78$ $16.56

5,060.90$ $5,313.50

6,009.87$ $6,310.36

7,116.46$ $7,472.28

5,060.90$ $5,313.94

3,637.12$ $3,818.97 +5.00%

+5.00% +5.00%

+4.94%

+4.94%

+4.99%

+5.00%

+5.00%

+5.00%

14-4.

14-5.

15-1.a.

15-1.b.

15-1.c.

16-1.

In-Situ Injection Into Existing Well/Treatment Point

Direct Push Boring with In-Situ Injection Grass - Seed and Mulch Grass - Sod

Asphalt Paving - 2 inch thickness (includes sub-base)

Additional Rental of 20 Cubic Yard Roll-Off Container

Groundwater Recovery System Pilot Test - 8 hours

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of 21 - 30 Lines Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points

Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

14-1.a.

12-18.

13-1.

13-2.

13-3.

13-4.

13-6.

13-7.

15-2.a.

15-4.a.

15-4.b.

15-4.c.

15-4.d.

15-1.d.

14-2.a.

+5.00%

+5.00%

+4.98%

+4.99%

+4.88%

+4.90%

+4.98%

+4.93% +4.35% +2.94% +5.00%

2,760.51$ $2,898.53

575.10$ $603.85

3,105.58$ $3,260.85 575.10$ $603.85

3,637.04$ $3,818.89

3,278.10$ $3,442.00

575.10$ $603.85

3,637.04$ $3,818.89 718.88$ $754.82

4,744.63$ $4,981.83

4,132.68$ $4,339.31 1,581.53$ $1,660.60 1,797.04$ $1,886.89 2,156.64$ $2,264.47 2,587.97$ $2,717.36

6,038.62$ $6,340.55

5,463.51$ $5,736.68

7,907.71$ $8,303.09

7,152.64$ $7,510.27

9,345.46$ $9,812.73

8,770.38$ $9,208.89

2,875.53$ $3,019.30

2,587.97$ $2,717.36

3,450.64$ $3,623.17

3,019.31$ $3,170.27

4,025.75$ $4,227.03

+5.00%

+5.00%

+5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00% +5.00%

+5.00%

18-5.

18-6.

18-7.

18-8.

18-9.

18-10.

17-1.

17-2.

17-3.

17-4.

18-11.

18-12.

18-13.

18-14.

18-15.

16-5.

16-6.

16-7.

16-9.

16-10.

16-11.

16-12.

16-13.

16-21.

16-3.

16-4.

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - Additional Time

Air Sparging or Biosparging Pilot Test - 8 hours

Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - Additional Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small AS/SVE System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

Air Sparge System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

+5.00% +5.00% +5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

3,594.41$ $3,774.13

3,450.64$ $3,623.17

3,019.31$ $3,170.27

4,025.75$ $4,227.03

3,450.64$ $3,623.17

5,175.96$ $5,434.75

4,457.07$ $4,679.92

4,456.10$ $4,678.90 3,881.96$ $4,076.05

5,319.74$ $5,585.72

4,744.63$ $4,981.86 7,188.83$ $7,548.27 6,469.95$ $6,793.44

1,581.47$ $1,660.54

3,019.31$ $3,170.27

5,032.18$ $5,283.78

718.88$ $754.82

2,012.87$ $2,113.51

3,738.19$ $3,925.09

1,142.97$ $1,200.11

323.48$ $339.65

395.35$ $415.11

416.92$ $437.76

4,313.30$ $4,528.96

+5.00%

+5.00%18-21.

18-22.

18-20.

18-16.

18-17.

18-18.

18-19.

Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.

MPE System - Large - Long Term > 6 mos.

MPE System - Large - Short Term ≤ 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term ≤ 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Small - Short Term ≤ 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.

18-38.

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-37.

18-23.

18-24.

18-25.

18-26.

18-27.

18-28.

18-39.

18-40.

18-41.

+5.00%

+5.00% +5.00%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

4,954.14$ $5,201.84

3,450.64$ $3,623.17

4,025.75$ $4,227.03

5,060.94$ $5,313.98

5,693.55$ $5,978.22

5,377.24$ $5,646.10

8,065.85$ $8,469.14

6,483.98$ $6,808.17

6,167.72$ $6,476.10

8,224.03$ $8,635.23

7,748.95$ $8,136.39

10,595.80$ $11,125.59

9,963.32$ $10,461.48

1,575.28$ $1,654.04 3,450.64$ $3,623.17 1,575.28$ $1,654.04

656.37$ $689.18 656.37$ $689.18

773.94$ $812.63

1,575.28$ $1,654.04

656.37$ $689.18 1,150.21$ $1,207.72 6,469.95$ $6,793.44 8,914.16$ $9,359.86

1,050.19$ $1,102.69

1,437.76$ $1,509.64

+5.00%

+5.00%

19-8.

19-9.

19-10.

19-11.

19-12.

19-13.

19-14.

18-44.

18-45.

18-57.

18-58.

19-1.

19-3.

19-4.

19-5.

19-6.

19-7.

18-56.

18-47.

18-49.

18-50.

18-51.

18-53.

18-54.

18-55.

Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report

Soil Vapor Extraction (SVE) System - Large - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months

Supplemental Site Assessment Report General Site Assessment Report Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Short Term ≤ 6 Months

Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.

Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Remedial Action Plan

18-42.

+5.00%

+5.00% +5.00% +5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

3,163.08$ $3,321.23

4,313.30$ $4,528.96

2,156.64$ $2,264.47

656.37$ $689.18

1,575.28$ $1,654.04 157.51$ $165.38

862.65$ $905.78

1,725.32$ $1,811.58 1,050.19$ $1,102.69

656.37$ $689.18 196.89$ $206.73 131.26$ $137.82 862.65$ $905.78 100.62$ $105.65 100.62$ $105.65 86.24$ $90.55 86.24$ $90.55 86.24$ $90.55 86.24$ $90.55 71.87$ $75.46 71.87$ $75.46 64.69$ $67.92 52.49$ $55.11 52.49$ $55.11

115.02$ $120.77 115.02$ $120.77

115.02$ $120.77

115.02$ $120.77

359.43$ $377.40

359.43$ $377.40

359.43$ $377.40

+5.00%

+5.00%

+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +4.99%

19-20.

19-21.

19-22.

19-23.

19-24.

19-25.

20-9.

20-10.

20-11.

21-1.

19-17.

19-15.

19-16.

20-8.

19-26.

19-27.

20-1.

20-2.

20-3.

20-4.

20-5.

20-6.

20-7.

19-18.

19-19. Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Professional Geologist (Key) Professional Engineer (Key) Laborers and Security Guards Administrative Draftsperson Field Technician (Key)

Construction Drawings and Specs Report

P.E. Project Oversight for Remediation System Integration and Startup - Medium System

P.E. Project Oversight for Remediation System Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)

Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Hydrogeologist/Modeler (Key) Geologist/Geoscientist (Key) Engineer (Key) Project Manager (Key) Program Manager (Key) Interim Assessment Report Well Abandonment/Site Restoration Report Free Product Recovery Report Remedial Action Interim Report Remedial Action General Report Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non- Annual

Letter/NPDES Report

21-6.a.

21-6.b.

21-2.

21-3.

21-4.

21-5.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99% +4.99% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

359.43$ $377.40

431.31$ $452.87

115.02$ $120.77

359.43$ $377.40

215.64$ $226.42

575.10$ $603.85

575.10$ $603.85

575.10$ $603.85

143.76$ $150.94

359.43$ $377.40

215.64$ $226.42

143.76$ $150.94

+5.00%

+5.00%

+4.99%

+5.00%

P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Project Oversight for Remediation System Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System Integration and Startup - Large System

P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report

P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report

P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

21-12.

21-13.

21-15.

21-16.

21-17.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-8.

21-9.

21-10.

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

215.64$ $226.42

287.53$ $301.90

215.64$ $226.42

287.53$ $301.90

359.43$ $377.40

359.43$ $377.40

215.64$ $226.42

215.64$ $226.42

143.76$ $150.94

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%21-31.

P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot Test Report

P.E. Review, Evaluation and Certification of a Pilot Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP

P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan

P.E. Review, Evaluation and Certification of a Level 2 Natural Attenuation Monitoring Plan

P.E. Review, Evaluation and Certification of As-Built Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan

21-29.

21-18.

21-19.

21-20.

21-30.

21-21.

21-22.

21-23.

21-24.

21-25.

21-26.

21-27.

21-28.

143.76$ $150.94

143.76$ $150.94

215.64$ $226.42

359.43$ $377.40

215.64$ $226.42

21-32.

21-33.

21-34.

21-35.

21-36. P.E. Review, Evaluation, and Certification of Annual PARM Report

P.E. Review, Evaluation, and Certification of Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report

P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report +4.99%

+4.99%

+5.00%

+5.00%

File details come from the government source that posted it. Updated .