AMENDMENT NO. 13 TO DEP AGENCY TERM CONTRACT NO. GC735
This document is an amendment to an Agency Term Contract between the Florida Department of Environmental Protection (DEP) and AHS-GEAR LLC, originally executed on April 9, 2014. The contract provides petroleum contamination site response action services in the Central Region of Florida. Amendment No. 13 is a rate increase amendment that modifies the pricing structure for services rendered under the contract.
The amendment implements a 5% rate increase across the majority of pay items in the contract's Rate Schedule (Attachment D, Version 3.5). The rate changes apply exclusively to new work assignments offered on or after the effective Rate Change Date of June 10, 2024. All pre-existing work assignments and previously offered work assignments continue under the prior rate schedule. The contract encompasses over 200 pay items spanning multiple service categories, including mobilization and demobilization costs, boring and drilling operations, well installation and abandonment, sampling and analysis, excavation and remediation activities, remedial system operations and maintenance, and professional services such as reports and engineering oversight. Rate increases range from approximately 4.55% to 5.00%, with the Agreed New Rates representing the maximum authorized for payment. The amendment does not modify any line items, add or delete services, or alter any other contract terms and conditions, which remain fully in effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC735-A6.pdf | ||
| CN-370000-GC735-A7.pdf | ||
| CN-370000-GC735-A8.pdf | ||
| CN-370000-GC735-A9.pdf | ||
| CN-370000-GC735-AR1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC735-CMC.pdf | ||
| CN-370000-GC735-A16.pdf | ||
| CN-370000-GC735.pdf | ||
| CN-370000-GC735-A11.pdf | ||
| CN-370000-GC735-A12E1.pdf | ||
| CN-370000-GC735-A14.pdf | ||
| CN-370000-GC735-A2.pdf | ||
| CN-370000-GC735-A4.pdf | ||
| CN-370000-GC735-AR1.pdf | ||
| CN-370000-GC735-CMC2.pdf | ||
| CN-370000-GC735.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC735-A10.pdf | ||
| CN-370000-GC735-A17.pdf | ||
| CN-370000-GC735-A3.pdf | ||
| CN-370000-GC735-A5.pdf | ||
| CN-370000-GC735-CMC1.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes
WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC735 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and AHS-GEAR LLC (hereinafter "Contractor") executed on April 9, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC735
RATE INCREASE
AMENDMENT NO. 13
Amendment No. 13 DEP Agency Term Contract No. GC735
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 13 DEP Agency Term Contract No. GC735
4.
5.
6.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
130.41$ $136.93 130.41$ $136.93 391.23$ $410.79
389.98$ $409.47
683.10$ $717.25
621.00$ $652.05
745.20$ $782.46
683.10$ $717.25
847.65$ $890.03
211.14$ $221.69 372.60$ $391.23
684.64$ $718.87
1,026.93$ $1,078.27
1,173.69$ $1,232.37
1,956.15$ $2,053.95
978.06$ $1,026.96
6,161.86$ $6,469.95
8,215.83$ $8,626.62
326.01$ $342.31
456.42$ $479.24
326.01$ $342.31
Est % Rate
Change(2)
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-15.
3-16.
3-17.
Description
3-12.
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization (hollow way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way
Work Trailer - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton
Contractor Oversight for Non-Price Schedule Activities miles each way
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review Site Health & Safety Plan
Receptor Survey and Exposure Pathway Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Mini Excavator/Loader (BobcatTM
100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Pay Item No.
1-1.
1-2.
3-14.a.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
456.42$ $479.24
652.05$ $684.65
39.74$ $41.72
41.73$ $43.81
44.71$ $46.94
146.55$ $153.87
102.68$ $107.81
3,105.00$ $3,260.25
27.32$ $28.68
28.56$ $29.98
34.77$ $36.50
28.68$ $30.11
32.59$ $34.21
39.11$ $41.06
36.51$ $38.33
41.07$ $43.12
45.64$ $47.92
32.90$ $34.54
36.01$ $37.81
44.08$ $46.28
40.42$ $42.44
46.28$ $48.59
+4.99%
+4.98%
+4.99%
+5.00%
3-18.
3-20.
5-9.
5-10.
5-11.
Sonic Core Sampling - 5 or 10 foot (during boring) feet total depth depth
Direct Push Technology (DPT) Rig and Equipment
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth depth depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth
100 feet feet
Drum Compactor mobilization - > 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-1.b.
5-2.
5-3.a.
5-6.
5-7.
5-17.
5-18.
5-19.
5-12.
5-13.
5-14.
5-15.
5-16.
5-8.
+5.00%
+5.00%
+4.98%
+4.98%
+4.99%
+4.99%
+5.00%
+5.00%
+4.98%
+4.97%
+4.98%
+4.99%
+4.97%
+4.98%
+5.00%
+4.99%
+5.00%
+4.99%
57.89$ $60.78
71.06$ $74.61
84.09$ $88.29
110.18$ $115.68
24.63$ $25.86 41.73$ $43.81
167.67$ $176.05
45.64$ $47.92
195.60$ $205.38
39.74$ $41.72 30.11$ $31.61 39.74$ $41.72 52.16$ $54.76 64.58$ $67.80
124.20$ $130.41
260.82$ $273.86
310.50$ $326.02
15.04$ $15.79
17.43$ $18.30
22.57$ $23.69
29.41$ $30.88 143.44$ $150.61
202.13$ $212.23
223.56$ $234.73
62.10$ $65.20 65.19$ $68.44 24.84$ $26.08 74.52$ $78.24 65.19$ $68.44
8-3.
8-6.
8-7.
8-8.
8-11.
6-5.
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Domestic Water Well Sampling
Monitoring Well Sampling with Water Level, > 100 foot depth foot depth
Removal of Well Pad and Manhole
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
6-6.
6-7.
6-8.
Well Redevelopment
7-2.
7-3.
7-4.
7-1.
6-13.
6-14.
6-15.
7-7.
8-1.
8-2.
Surface Casing - 8 inch diameter Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Well Installation - 1 inch diameter
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Electronic Data Deliverables (EDD) Free Product Gauging & Bailing Water Level or Free Product Gauging Soil/Sediment Sample Collection
Surface Casing - 12 inch diameter Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
6-4.
6-2.b.
5-20.
5-21.
5-22.
5-23.
6-1.
6-2.a.
+5.00%
+4.98% +4.98% +4.98% +4.98% +4.99% +5.00%
+4.99%
+5.00%
+4.99%
+4.99%
+4.99% +4.98%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.96%
+5.00% +5.00%
+5.00%
+5.00%
+4.99% +4.99% +4.99% +4.99%
21.50$ $22.57
540.27$ $567.28
55.18$ $57.93
75.20$ $78.96
93.15$ $97.80
105.57$ $110.84
107.10$ $112.45
195.60$ $205.38
81.97$ $86.06
273.24$ $286.90
84.75$ $88.98
14.27$ $14.98 14.27$ $14.98 14.27$ $14.98 14.27$ $14.98
55.89$ $58.68
32.59$ $34.21 +4.97%
+4.98% +4.98% +4.98% +4.98%
+4.99%
8-14.
9-1.
9-2.
9-3.
9-4.
9-5.
9-6.
9-18.
9-15.
9-7.
9-8.
9-8.a.
9-10.
9-11.
9-12.
9-13.
9-14.
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Soil, Volatile Organic Halocarbons (EPA 8021 or
EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
+4.98%
+5.00%
+4.98%
+5.00%
+4.99%
+4.99%
+5.00%
+5.00%
+4.99%
+5.00%
310.50$ $326.02
412.31$ $432.92
54.02$ $56.72
74.32$ $78.03
105.57$ $110.84
51.28$ $53.84
54.64$ $57.37
96.58$ $101.40
104.32$ $109.53
195.60$ $205.38
14.77$ $15.50
14.77$ $15.50
39.11$ $41.06
39.11$ $41.06
14.77$ $15.50
18.99$ $19.93
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+5.00%
9-49.
9-50.
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA 8260)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-32.
9-25.
9-26.
9-27.
9-28.
9-30.
9-31.
9-31.a.
9-41.
9-41.a.
9-44.a.
9-33.
9-34.
9-38.
+5.00%
+4.94%
+4.94%
+4.99%
+4.99%
+4.99%
+4.99%
+4.94%
+4.95%
18.99$ $19.93
18.99$ $19.93
18.99$ $19.93
18.99$ $19.93
19.93$ $20.92
19.24$ $20.20
14.77$ $15.50
15.64$ $16.42
17.13$ $17.98
42.84$ $44.98
931.50$ $978.07
931.50$ $978.07
186.30$ $195.61
186.30$ $195.61
9-57.
9-58.
9-59.
9-60.
9-61.
9-62.
9-63.
9-64.
9-65.
9-51.
9-53.
9-54.
9-55.
9-56.
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution
GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
+4.95%
+4.95%
+4.95%
+4.95%
+4.97%
+4.99%
+4.94%
+4.99%
+4.96%
+5.00%
+5.00%
+5.00%
+5.00%
74.52$ $78.24
186.30$ $195.61
47.81$ $50.20
113.02$ $118.67
279.45$ $293.42
331.16$ $347.71
186.30$ $195.61
186.30$ $195.61
12.42$ $13.04
4.96$ $5.20
37.26$ $39.12
1.54$ $1.61
2.78$ $2.91
7.75$ $8.13
32.59$ $34.21
28.68$ $30.11
159.84$ $167.83
198.86$ $208.80
+4.90%
+4.97%
+4.99%
+5.00%
+5.00%
+5.00%
+4.99%
+4.84%
+4.99%
+4.55%
+4.68%10-2.c.
10-2.d.
10-7.
10-8.
10-9.
9-66.
10-2.a.
9-72.
9-73.
10-1.a.
10-1.d.
9-67.
9-79.
9-68.
9-70.
9-71.
10-2.b.
Air, Polycyclic Aromatic Hydrocarbons (EPA Method
TO-13)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Air, Volatile Organic Compounds (EPA Method TO- 17)
Excavation
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
300 cubic yards cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Installation for > 20 feet deep Excavation
10-11.a.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
356.01$ $373.81
186.48$ $195.80
155.96$ $163.75
45.64$ $47.92
45.64$ $47.92
14.34$ $15.05
13.03$ $13.68
81.36$ $85.42 71.72$ $75.30
3,129.84$ $3,286.33
130.41$ $136.93
9,389.52$ $9,858.99
163.00$ $171.15
15,101.47$ $15,856.54
272.54$ $286.16
1,242.00$ $1,304.10
2,484.00$ $2,608.20
3,726.00$ $3,912.30
4,968.00$ $5,216.40
3.90$ $4.09
41.77$ $43.85
43.35$ $45.51 47.06$ $49.41
239.24$ $251.20
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+4.95%
+4.99%
+4.99%
12-3.
12-4.
12-5.
12-6.
#57 Stone Pea Gravel
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and Testing Flowable Fill Concrete and Installation
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Driven Casing < 300 cubic yards
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
1,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport and Disposal of Mixed Debris Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean Overburden
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
10-18.
10-19.
10-20.
10-21.
10-22.
10-23.
10-17.
10-11.b.
10-12.a.
10-13.
10-14.
10-15.
10-15.a.
10-15.b.
10-16.
11-3.
11-4.
12-2.
11-1.
11-2.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+4.87%
+4.98%
+4.98% +4.99%
33.17$ $34.82
52.16$ $54.76
45.23$ $47.49
45.42$ $47.69
43.77$ $45.95
41.69$ $43.77
236.52$ $248.34
1.24$ $1.30
280.22$ $294.23
1.46$ $1.53
164.31$ $172.52
10.55$ $11.07
11.79$ $12.37
1.24$ $1.30
3,105.00$ $3,260.25
4,347.00$ $4,564.35
86.06$ $90.36
96.49$ $101.31 109.54$ $115.01
4,968.00$ $5,216.40
326.01$ $342.31 +5.00%
+5.00% +4.99%
+5.00%
14-4.
14-5.
15-1.a.
15-1.b.
15-1.c.
12-7.
16-2.
Grass - Sod
Disposal of Petroleum Impacted Soil at a Landfill
Transport Petroleum Impacted Soil (bulk) > 100 miles
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Contact Water (includes drum)
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Groundwater Recovery System Pilot Test - Additional Time
Concrete Paving - 4 inch thickness (includes sub-base)
Trenching and Installation of 21 - 30 Lines Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
12-18.
13-1.
13-3.
13-6.
12-8.
15-4.d.
12-9.
12-10.
12-11.
12-12.
12-13.
12-14.
12-15.
12-16.
+4.97%
+4.98%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.98%
+4.99%
+5.00%
+4.84%
+5.00%
+4.79%
+5.00%
+4.93%
+4.92%
+4.84%
4,238.31$ $4,450.22
326.01$ $342.31
4,238.31$ $4,450.22 326.01$ $342.31
4,968.00$ $5,216.40
623.48$ $654.65
4,238.31$ $4,450.22
326.01$ $342.31
6,210.00$ $6,520.50 639.00$ $670.95
4,595.40$ $4,825.17
456.42$ $479.24
3,259.44$ $3,422.41
9,311.27$ $9,776.83
3,390.66$ $3,560.19 6,781.32$ $7,120.38 3,390.66$ $3,560.19 6,458.40$ $6,781.32 6,582.60$ $6,911.73
14,158.80$ $14,866.74 2,608.20$ $2,738.61 3,260.25$ $3,423.26 3,912.30$ $4,107.91 4,173.12$ $4,381.77
469.47$ $492.94
2,856.60$ $2,999.43
3,105.00$ $3,260.25
4,303.53$ $4,518.70
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
16-24.
16-25.
16-26.
17-1.
17-2.
17-3.
17-4.
17-5.
18-12.
18-14.
18-16.
16-5.
16-18.
16-17.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
16-12.
16-13.
16-14.
16-21.
16-22.
16-23.
16-3.
16-4.
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Supplemental System O&M Package - Add Thermox or Catox Treatment
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small AS/MPE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
1,242.00$ $1,304.10
326.01$ $342.31
705.51$ $740.78
6,781.32$ $7,120.38
8,346.24$ $8,763.55
10,824.03$ $11,365.23
1,956.15$ $2,053.95 4,347.00$ $4,564.35 1,956.15$ $2,053.95 1,242.00$ $1,304.10 1,242.00$ $1,304.10
652.05$ $684.65
978.06$ $1,026.96
1,614.60$ $1,695.33
1,863.00$ $1,956.15
3,105.00$ $3,260.25
5,216.40$ $5,477.22
7,172.55$ $7,531.17
3,260.25$ $3,423.26
652.05$ $684.65
2,608.20$ $2,738.61 342.31$ $359.42
1,825.74$ $1,917.02
2,608.20$ $2,738.61 1,304.10$ $1,369.30
621.00$ $652.05 326.01$ $342.31 342.31$ $359.42
94.17$ $98.87
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +4.99%
19-20.
19-21.
19-22.
19-23.
19-25.
19-17.
19-8.
19-10.
19-13.
19-14.
19-15.
19-16.
19-26.
19-27.
20-6.
18-58.
19-1.
19-3.
19-4.
19-5.
19-6.
19-7.
19-18.
19-19.
18-56.
18-54.
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Construction Drawings and Specs Report
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Pilot Test Report
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report Supplemental Site Assessment Report General Site Assessment Report Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Carbon Off Gas Treatment - Add On - Large - Short
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
Scientist/Technical Specialist (Key) Interim Assessment Report Well Abandonment/Site Restoration Report Free Product Recovery Report Remedial Action General Report Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non- Annual
Letter/NPDES Report
18-38.
18-37.
18-40.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
65.52$ $68.79 62.71$ $65.84 41.94$ $44.03
1,376.13$ $1,444.93
688.06$ $722.46
344.03$ $361.23
180.60$ $189.63
180.60$ $189.63
180.60$ $189.63
344.03$ $361.23
541.71$ $568.79
180.60$ $189.63
180.60$ $189.63
361.22$ $379.28
361.22$ $379.28
326.01$ $342.31
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99% +4.99%
21-31.
21-32.
21-33.
21-34.
21-36.
20-11.
20-8.
20-7.
P.E. Review, Evaluation, and Certification of Annual PARM Report
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Pilot Test Report
Laborers and Security Guards Field Technician (Key)
P.E. Project Oversight for Remediation System Integration and Startup - Small System
Notes:
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
Assistant Scientist/Technical Specialist
P.E. Review, Evaluation and Certification of As-Built Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
21-29.
21-6.a.
21-30.
21-22.
21-25.
21-26.
21-27.
21-28.
+5.00%
+5.00%
+5.00%
+5.00%
+4.98%
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
File details come from the government source that posted it. Updated .