This is Amendment No. 16 to Agency Term Contract No. GC734 between the Florida Department of Environmental Protection (DEP) and APEX COMPANIES, LLC. The contract, originally executed on February 28, 2014, provides petroleum contamination site response action services in the Central Region of Florida. This amendment exclusively modifies the rate schedule without adding, deleting, or otherwise altering any line items contained in the original contract.
The amendment implements a 5 percent maximum rate increase across the contract's pay items, effective for new work assignments issued on or after June 10, 2024. The rate increase applies only to prospective work assignments; all pre-existing and previously offered work assignments continue under their prior rate schedules. The updated Attachment D (Rate Schedule V3.6) reflects the new rates for services spanning site assessment, drilling and boring operations, well installation and abandonment, environmental sampling and analysis, excavation, soil and groundwater treatment systems, remedial action plans, and professional services including engineering and geological oversight. The increases were requested by the contractor, supported by detailed justification, reviewed and approved by the Department, and confirmed to remain within the maximum 5 percent increase allowed under contract provision 11.B.ii. The Department provided data processing confirmation on June 10, 2024, establishing the official Rate Change Date, with the contractor to receive notice within five business days.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes
WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.5) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC734 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and APEX COMPANIES, LLC (hereinafter "Contractor") executed on February 28, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC734
RATE INCREASE
AMENDMENT NO. 16
Amendment No. 16 DEP Agency Term Contract No. GC734
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 16 DEP Agency Term Contract No. GC734
4.
5.
6.
Attachment D, Rate Schedule (V3.6) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.6) shall apply.
Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
594.39$ $624.09
340.51$ $357.53
317.00$ $332.85 538.92$ $565.86
483.44$ $507.61
924.64$ $970.87
538.92$ $565.86
857.32$ $900.18
578.55$ $607.47
1,037.48$ $1,089.35
190.19$ $199.69 253.61$ $266.29
740.13$ $777.13
1,184.11$ $1,243.31
1,117.82$ $1,173.71
1,754.58$ $1,842.29
594.39$ $624.09
693.46$ $728.13
523.07$ $549.22
807.21$ $847.57
356.63$ $374.46
Est % Rate
Change(2)
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-15.
3-16.
3-17.
Description
3-12.
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization (hollow way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way
Work Trailer - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton
Contractor Oversight for Non-Price Schedule Activities
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement
Receptor Survey and Exposure Pathway Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Mini Excavator/Loader (BobcatTM
100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
Pay Item No.
1-1.
1-3.
1-5.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
3-11.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
610.25$ $640.76
40.73$ $42.76
47.67$ $50.05
52.87$ $55.51
192.16$ $201.76
2,694.70$ $2,829.43
37.12$ $38.97
40.35$ $42.36
37.49$ $39.36
41.83$ $43.92
48.27$ $50.68
50.74$ $53.27
54.46$ $57.18
59.98$ $62.97
45.44$ $47.71
51.68$ $54.26
49.87$ $52.36
56.71$ $59.54
63.58$ $65.48
33.50$ $35.17 41.90$ $43.99 50.40$ $52.92 46.85$ $49.19
5.11$ $5.36
+4.99%
+4.99%
+4.99%
+4.98%
3-18.
5-9.
5-10.
5-11.
6-5.
feet total depth
Direct Push Technology (DPT) Rig and Equipment
6-9.a.
Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth depth depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth
Well Installation - 1 inch diameter
100 feet feet
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
Well Installation - 2 inch diameter (vertical)
Additional Well Screen > 20 feet - 1 inch diameter
Well Installation - 4 inch diameter (vertical)6-3.a.
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-2.
5-3.a.
5-7.
5-17.
5-18.
5-19.
5-20.
6-1.
6-2.a.
5-12.
5-13.
5-14.
5-16.
5-8.
+5.00%
+4.98%
+4.99%
+4.99%
+5.00%
+5.00%
+4.98%
+4.98%
+4.99%
+5.00%
+4.99%
+4.89%
+5.00%
+4.99%
+4.99%
+4.99%
+2.99%
+4.99% +4.99%
6.56$ $6.88
8.03$ $8.43
9.67$ $10.15
261.52$ $274.59 744.98$ $782.22 190.64$ $200.17
362.17$ $380.27
20.52$ $21.54
22.94$ $24.08
27.49$ $28.86
31.88$ $32.83 435.87$ $457.66 784.59$ $823.81 188.03$ $197.43
196.92$ $206.76
240.51$ $252.53
109.01$ $114.46 76.75$ $80.58 27.72$ $29.09 44.36$ $46.57
57.47$ $60.34
98.72$ $103.65
110.40$ $115.92
310.67$ $326.19
67.57$ $70.94
44.36$ $46.57
44.36$ $46.57
+4.98%
+4.98%
9-2.
9-4.
9-5.
9-16.
8-3.
8-6.
8-7.
8-11.
9-15.
9-8.a.
9-9.
Domestic Water Well Sampling
Monitoring Well Sampling with Water Level, > 100 foot depth foot depth
Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Well Redevelopment Installation of Well Vault - 2 x 2 x 2 foot
7-2.
7-3.
7-4.
7-5.
7-1.
6-9.b.
6-9.c.
6-9.d.
6-10.
6-11.
6-13.
6-14.
7-6.
7-7.
8-1.
8-2.
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Electronic Data Deliverables (EDD) Water Level or Free Product Gauging Soil/Sediment Sample Collection
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)
Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)
Soil, PCBs [or Aroclors] (EPA 8082)
+4.88%
+4.98%
+4.96%
+5.00% +5.00% +5.00%
+5.00%
+4.97%
+4.97%
+4.98%
+4.99%
+4.99%
+5.00%
+5.00%
+4.99%
+2.98% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +4.99% +4.94% +4.98%
66.41$ $69.73
8.78$ $9.21 71.40$ $74.97
80.70$ $84.73
235.13$ $246.88
50.69$ $53.22
93.50$ $98.17
111.43$ $116.99
63.38$ $66.54
66.55$ $69.87
12.71$ $13.34
12.71$ $13.34
12.71$ $13.34
13.72$ $14.39
21.00$ $22.05
12.13$ $12.73
15.69$ $16.47
16.90$ $17.74
15.74$ $16.52
+5.00%
+4.90% +5.00%
+4.99%
+5.00%
+4.99%
+4.99%
+4.99%
+4.99%
9-49.
9-51.
9-52.
9-18.
9-19.
9-20. Soil, Texture, (See Gee 7 Bauder [1966])
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Soil, Moisture Content (ASTM D2216-10)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-24.
9-27.
9-29.
9-30.
9-31.a.
9-41.
9-42.
9-43.
9-39.
9-40.
9-21.
9-37.
9-38.
+4.99%
+4.96%
+4.96%
+4.96%
+4.88%
+5.00%
+4.95%
+4.97%
+4.97%
+4.96%
16.90$ $17.74
16.90$ $17.74
25.24$ $26.49
18.50$ $19.42
14.70$ $15.43
14.98$ $15.72
49.55$ $52.02
610.24$ $640.75
85.76$ $90.04
76.31$ $80.12
88.74$ $93.17
117.95$ $123.84
242.55$ $254.67
321.96$ $338.05
289.00$ $303.45
13.29$ $13.95
8.65$ $9.08
15.82$ $16.61
+4.97%
+4.97%
+4.99%
9-66.
9-57.
9-58.
9-59.
9-61.
9-63.
10-2.a.
9-72.
10-1.a.
10-1.c.
9-53.
9-55.
9-56.
9-78.
9-80.
9-68.
9-70.
9-71.
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Air, Polycyclic Aromatic Hydrocarbons (EPA Method
TO-13)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Air, Volatile Organic Compounds (EPA Method TO- 17)
Excavation
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)
Water, Heterotrophic Plate Count (SM 9215 B)
Sheet Piling Installation for > 20 feet deep Excavation
+4.99%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
+4.97%
+4.97%
+4.95%
+4.97%
+4.97%
+4.94%
+4.98%
+5.00%
+4.99%
41.18$ $43.23
32.94$ $34.58
122.47$ $128.59
149.32$ $156.78
23.73$ $24.91
21.36$ $22.42
71.19$ $74.74
7,846.40$ $8,238.72
9,035.26$ $9,487.02
482.02$ $506.12
3.45$ $3.62
3.63$ $3.81
46.20$ $48.51 63.38$ $66.54
230.94$ $242.48
33.51$ $35.18
44.35$ $45.68
44.32$ $46.53
44.26$ $46.47
38.99$ $40.93
36.62$ $38.45
221.87$ $232.96
221.87$ $232.96
+4.98%
+4.98%
+5.00%
+5.00%
+4.97%
+4.96%
12-4.
12-5.
12-6.
12-7.
10-7.
10-8.
10-10.
#57 Stone
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Flowable Fill Concrete and Installation
Dewatering System, up to 12 well points (includes installation)
Dewatering System, up to 12 well points (includes installation)
LDA Excavation and Loading Without Casing > 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards cubic yards
Additional Dewatering System Well Points (2) (includes installation)
Disposal of Petroleum Impacted Soil at a Landfill
Transport Petroleum Impacted Soil (bulk) > 100 miles
Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Contact Water (includes drum)
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport and Disposal of Mixed Debris Transport and Disposal of Clean Concrete
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness
10-20.
10-22.
10-23.
10-17.
10-13.
10-15.a.
10-15.b.
12-8.
12-1.
12-2.
12-9.
12-10.
12-11.
12-12.
12-13.
12-15.
+5.00%
+5.00%
+5.00%
+4.99%
+4.93%
+4.96%
+5.00% +4.99%
+5.00%
+4.98%
+3.00%
+4.99%
+4.99%
+4.98%
+5.00%
+5.00%
965.57$ $1,013.84
9.90$ $10.39
3.13$ $3.28
10.69$ $11.22
3.06$ $3.21 1.78$ $1.86 1.86$ $1.95 0.77$ $0.79
5,293.91$ $5,558.59
4,485.95$ $4,710.24
101.47$ $104.51
110.35$ $113.66
20.93$ $21.97
11,413.00$ $11,983.65
12,205.56$ $12,815.83
13,949.23$ $14,646.68
4,943.19$ $5,091.48
2,991.91$ $3,081.66
3,899.41$ $4,094.38
4,422.51$ $4,643.63
619.50$ $650.47
+5.00%
+5.00%
+5.00%
+3.00%
+4.97%
+5.00%
+5.00%
+5.00%
+3.00%
+3.00%
16-9.
16-10.
15-1.a.
15-1.b.
16-3.
In-Situ Injection Into Existing Well/Treatment Point
Direct Push Boring with In-Situ Injection Grass - Seed and Mulch Grass - Sod Crushed Lime Rock Cover - 2 inch thickness
Asphalt Paving - 2 inch thickness (includes sub-base)
Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container
Air Sparging or Biosparging Pilot Test - 8 hours
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 11 - 20 Lines
1 Technology Component
System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
14-1.a.
12-17.
13-1.
13-2.
13-3.
13-4.
13-5.
13-6.
13-7.
15-2.a.
15-4.a.
15-4.b.
15-4.c.
15-4.d.
15-5.
14-2.a.
+3.00%
+5.00%
+4.95%
+4.79%
+4.96%
+4.90% +4.49% +4.84% +2.60% +5.00%
4,945.61$ $5,192.89
6,195.00$ $6,504.75
554.77$ $582.49
6,314.18$ $6,629.88 3,622.50$ $3,803.62 8,581.65$ $9,010.73 3,924.37$ $4,120.58 2,893.42$ $3,038.09 3,388.22$ $3,557.63 4,050.48$ $4,252.99 4,483.20$ $4,707.36
498.75$ $523.68
6,732.00$ $7,068.59
3,800.98$ $3,991.02
2,928.79$ $3,016.65
4,977.32$ $5,126.64
4,184.75$ $4,393.98
3,661.64$ $3,844.72
4,882.19$ $5,126.29
4,184.75$ $4,393.98
6,277.12$ $6,590.97
5,405.29$ $5,675.54
5,004.90$ $5,255.14 3,729.72$ $3,916.19
6,451.48$ $6,774.05
5,053.31$ $5,305.97 8,072.45$ $8,476.07 6,275.97$ $6,589.76
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
18-5.
18-21.
18-22.
16-27.
17-1.
17-2.
17-3.
17-4.
17-5.
18-20.
18-13.
18-14.
18-15.
18-17.
18-18.
18-19.
16-11.
16-13.
16-14.
16-20.
16-21.
16-22.
Supplemental System O&M Package - Add Thermox or Catox Treatment Groundwater Treatment System - Stand Alone Small -
Multi-Phase Pilot Test - 8 hours
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small SVE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
MPE System - Large - Long Term > 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Small - Long Term > 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
18-23.
18-24.
18-25.
18-26.
18-27.
18-28.
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+3.00%
+3.00%
+5.00%
+5.00%
935.19$ $981.94
1,664.37$ $1,747.58
3,051.37$ $3,203.93
490.95$ $515.49
935.19$ $981.94
1,981.37$ $2,080.43
585.90$ $615.19
790.39$ $814.11
346.50$ $356.89
412.42$ $433.04
7,252.82$ $7,615.46
7,233.07$ $7,450.06
8,482.99$ $8,907.13
8,357.83$ $8,608.56
10,399.52$ $10,919.48
10,168.69$ $10,677.12
2,434.22$ $2,555.93 2,599.88$ $2,729.87 1,424.05$ $1,495.25
857.41$ $900.28
1,814.03$ $1,904.73
1,102.02$ $1,157.12 1,761.05$ $1,849.09
12,855.46$ $13,498.23 17,991.30$ $18,890.86
+3.00%
+5.00%
19-8.
19-9.
19-10.
19-11.
19-12.
18-57.
18-58.
19-1.
19-4.
19-5.
19-7.
18-56.
18-53.
18-54.
18-55.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Small - Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Short
Groundwater Treatment - Add On - Medium - Short
Groundwater Treatment - Add On - Small - Short
Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Receptor and Exposure Pathway Report Supplemental Site Assessment Report Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Carbon Off Gas Treatment - Add On - Medium -
Carbon Off Gas Treatment - Add On - Small - Short
Level 2 Remedial Action Plan
18-38.
18-29.
18-30.
18-31.
18-32.
18-33.
18-34.
18-35.
18-36.
18-39.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+3.00%
+3.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00%
+5.00%
+3.00%
+5.00%
1,990.01$ $2,089.51
3,675.76$ $3,859.54
6,518.29$ $6,844.19
9,827.83$ $10,319.22
4,541.75$ $4,768.83
870.84$ $914.38
3,481.93$ $3,656.02 424.47$ $445.69
2,288.81$ $2,403.25
4,077.25$ $4,281.11 1,495.24$ $1,569.99
848.96$ $891.39 397.73$ $417.61 165.00$ $173.25 137.81$ $144.69 112.56$ $118.18 113.56$ $119.23
96.83$ $101.67 84.30$ $88.51 85.13$ $89.38 69.34$ $72.79
160.00$ $167.99 151.59$ $159.16
848.01$ $890.41
1,109.57$ $1,165.04
1,386.95$ $1,456.29
1,386.95$ $1,456.29
1,664.37$ $1,747.58
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +4.99% +4.99% +4.99% +5.00% +4.99% +4.99% +4.98%
19-20.
19-21.
19-22.
19-23.
19-24.
20-9.
21-1.
19-17.
19-13.
19-14.
19-15.
19-16.
20-8.
19-26.
20-1.
20-2.
20-4.
20-5.
20-6.
20-7.
19-18.
19-19. Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key) Professional Engineer (Key) Draftsperson Field Technician (Key)
Construction Drawings and Specs Report
P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System Integration and Startup - Large System
P.E. Project Oversight for Remediation System Integration and Startup - Medium System
P.E. Project Oversight for Remediation System Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology Pilot Testing
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Hydrogeologist/Modeler (Key) Geologist/Geoscientist (Key) Project Manager (Key) Program Manager (Key) Well Abandonment/Site Restoration Report Remedial Action Interim Report Remedial Action General Report Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non- Annual
Letter/NPDES Report
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-2.
21-5.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99% +4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
554.77$ $582.49
396.25$ $416.06
1,386.95$ $1,456.29
536.27$ $563.08
673.74$ $707.42
416.08$ $436.88
277.35$ $291.21
277.35$ $291.21
277.35$ $291.21
416.08$ $436.88
554.77$ $582.49
1,109.57$ $1,165.04
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot Test Report
P.E. Review, Evaluation and Certification of a Pilot Test Plan
P.G. Review and Certification of Sufficiency of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Review, Evaluation and Certification of a Non- Annual Natural Attenuation or Post RA Monitoring Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report
P.G. or Qualified P.E. Review, Evaluation and Certification of a Supplemental Site Assessment Report
P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA
P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan
21-11.
21-13.
21-15.
21-16.
21-17.
21-19.
21-9.
21-10.
21-21.
21-22.
21-23.
21-24.
+5.00%
+5.00%
416.08$ $436.88
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
384.95$ $396.49
594.39$ $624.09
453.60$ $467.21
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%21-31.
21-32.
21-33.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of Annual PARM Report
P.E. Review, Evaluation, and Certification of Construction Drawings
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
21-30.
21-25.
21-26.
21-27.
21-28.
+5.00%
+3.00%
+5.00%
+3.00%
File details come from the government source that posted it. Updated .