This document is a contract amendment (Amendment No. 1) between the Florida Department of Environmental Protection (DEP) and Layne Christensen Company for well drilling services at the Collier-Hogan Project in Collier County, Florida. The amendment addresses complications with the initial well drilling attempt (Deep Monitor Well #1 or DWM-1), which became lodged at 935 feet below land surface, and outlines the process for drilling a replacement well (Deep Monitor Well #2 or DWM-2).
The contract covers the installation of a single-interval, telescoping/multi-cased monitor well to monitor water quality at or near the base of the Underground Source of Drinking Water (USDW). The total depth of the well is set at approximately 1,800 feet or until reaching the base of the USDW, with a 200-foot open-hole sampling interval. The contract includes comprehensive services such as site preparation, pad construction, water supply well installation, well drilling, development, and site restoration. The total contract value for both wells (DWM-1 and DWM-2) is $944,828.00, with payment structured through various fixed-price and rate schedule items, including mobilization, drilling rig time, casing, geophysical services, and travel expenses. The contract emphasizes compliance with Florida statutes, administrative codes, and environmental protection regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN047.pdf | ||
| CN-370000-CN047-TA2 CO1.pdf | ||
| CN-370000-EX018-CO3.pdf | ||
| CN-370000-EX018-CO1.pdf | ||
| CN-370000-EX018-CO2.pdf | ||
| CN-370000-EX018-CO4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP Contract No. EXC018, Exhibit A‐1, Page 1 of 13
EXHIBIT A‐1
Scope of Work for Monitor Well Installation Contract Collier‐Hogan Project ‐ Collier County, Florida
CONTRACTOR shall install a single interval, telescoping/multi‐cased monitor well at the site located southwest of the city of Immokalee, Florida (the “Site,” Figure 1), to monitor water quality at or near the base of the Underground Source of Drinking Water (USDW). The location of the Site for the monitor well is west of and in proximity to Hughes well 22‐3H (Figure 2(Revision 1)). In addition, the CONTRACTOR shall construct a drilling pad and supply water well to support the construction of the USDW monitor well. The CONTRACTOR’S Work for this project is further described below. In all instances where DEP is entitled to delivery of reports, samples or reserves the right to take or direct actions (including operational activities, suspension of work or the taking of samples), DEP may act through its Contract Manager or may accept such reports, samples or direct any activity through a designated employee, representative, contractor or agent.
1. The total depth (TD) of the USDW monitor well will be either i) approximately 1800 feet below land surface (BLS) or ii) near the base of the USDW, which is indicated in ground water by a total dissolved solids (TDS) concentration of 10,000 milligrams per liter (mg/L), whichever occurs first.
2. CONTRACTOR shall be responsible for drilling site preparation, not limited to, pad construction
(see Figure 2 (Revision 1)), water supply well construction, and the construction of the USDW monitor well and restoration of the site at the completion of this project. CONTRACTOR shall not drill the USDW monitor well below the 1800 foot depth without prior approval from the DEP. The monitor well will be completed with a twelve‐inch diameter open‐hole sampling interval approximately 200 feet in length. All well construction and permitting will comply with all applicable standards and rules established by Florida Statutes, the Florida Administrative Code, the South Florida Water Management District or its delegated authority, DEP (specifically, but not limited to, DEP Underground Injection Control (UIC) rule 62‐528.420, F.A.C.) All costs for insurance, permits, bonds, labor, lodging, equipment, services, materials, supplies, solid waste (garbage) disposal, to appropriately licensed facilities, associated with this project are provided in Figure 3 (Revision 2) of this Exhibit A‐1.
3. CONTRACTOR shall develop a Health and Safety Plan (HASP) associated with drilling and site activities, maintained, and available on‐site, for all personnel entering or working at the site. A copy of the HASP will be provided to DEP for review and acceptance prior to commencement of on‐site activities. CONTRACTOR’s operations shall be OSHA compliant and maintain said compliance.
4. DEP requires appropriate insurance and payment and performance bonding for all Work under the Contract (Exhibit B). Proof of applicable insurance (through a Certificate of Insurance listing the DEP as a certificate holder) will be required prior to DEP’s execution of the contract authorizing the Work to begin.
5. Materials and casing used to construct the well will be new and free of manufacturing oils and grease prior to installation. Lubricants used for drill rods will be non‐petroleum based and approved by DEP.
DEP Contract No. EXC018, Exhibit A‐1, Page 2 of 13
6. Water samples will be collected by DEP or its contractor from the water supply well to be used for drilling fluid make‐up water and grouting purposes. Such samples will be provided to the DEP Central Laboratory for analysis and results to confirm the acceptability of the water quality prior to commencement of drilling the USDW monitor well.
7. Disposal of drilling associated solid waste (cuttings) and fluids (drilling mud), development and testing waste water storage, transport and disposal to appropriately licensed facilities will be the responsibility of the DEP.
8. Utility clearance, if required, will be the responsibility of the CONTRACTOR.
9. CONTRACTOR shall create and maintain a well construction summary report detailing all personnel used and times, drilling progress (to include: problems encountered, footage drilled, down time, casing installation, materials/supplies used, geophysical logging and water quality sampling activities) and provide such report to DEP at the end of each 12 hour shift.
10. CONTRACTOR shall collect a complete set of drill cuttings, washed, lagged relative to depth
(when necessary), and bagged every 10 feet starting at the surface. Each bag of cuttings will be marked with the depth collected from, date, time and the name of the person collecting them.
Each bag will be no less than one (1) full quart in volume. CONTRACTOR shall create and maintain a cuttings sample collection log, documenting the same information as that provided on the sample bag label. An up‐to‐date copy of this log will be provided to on‐site DEP personnel at the end of each 12 hour shift.
11. Monitor Well Design and Construction
The following deep monitor well designations will be used to separate the first well attempted (Deep Monitor Well #1 (DWM‐1)), which was not completed, from the replacement second well (Deep Monitor Well #2 (DWM‐2). This designation will continue throughout Exhibit A‐1.
A. For DWM‐1: The drilling method for the upper 700 feet of the borehole shall be mud rotary.
If zones of lost circulation are encountered any lost circulation materials (LCM) used to regain circulation of the drilling fluid must be approved by the DEP. Drilling below the 700 foot depth shall be by the reverse air drilling method. The source of air being generated from the air compressor(s) used shall have the proper in‐line filtration system to preclude the introduction of oils or contaminates generated by the compressor(s). Two strings of steel, 0.375”–wall, ERW A53B and a third string of steel, 0.028”‐wall, ERW A53B, surface casing will (Refer to Figure 3 (Revision 2)) containing the breakdown of contract pay items.) A minimum of 5.5 inches of over‐drill will be required for the placement of each casing string.
An XY caliper log will be run prior to the installation of each individual casing string. It is anticipated that the Department’s Subject Matter Expert (SME) will contract with CONTRACTOR to require as many as six and no fewer than three interruptions to drilling to determine ground water quality and/or collect confirmatory samples for on‐site testing or laboratory analyses under a separate contract. All cost for this interruption will be the responsibility of the SME under separate contract with CONTRACTOR.
B. For DWM‐2: The drilling method for the upper 1000 feet of the borehole shall be mud rotary. If zones of lost circulation are encountered any lost circulation materials (LCM) used
DEP Contract No. EXC018, Exhibit A‐1, Page 3 of 13 to regain circulation of the drilling fluid must be approved by the DEP. Drilling below the 1000 foot depth shall be by the reverse air drilling method. The source of air being generated from the air compressor(s) used shall have the proper in‐line filtration system to preclude the introduction of oils or contaminates generated by the compressor(s). Two strings of steel, 0.375”–wall, ERW A53B and a third string of steel, 0.028”‐wall, ERW A53B, surface casing will be installed and grouted to surface or in accordance with appropriate rules and statutes. (Refer to Figure 3 (Revision 2)) containing the breakdown of contract pay items.) A minimum of 5.5 inches of over‐drill will be required for the placement of each casing string. An XY caliper log will be run prior to the installation of each individual casing string. It is anticipated that the Department’s Subject Matter Expert (SME) will contract with CONTRACTOR to require as many as six and no fewer than three interruptions to drilling to determine ground water quality and/or collect confirmatory samples for on‐site testing or laboratory analyses under a separate contract. All cost for this interruption will be the responsibility of the SME under separate contract with CONTRACTOR.
12. The following describes the advancement of the pilot hole for the monitor wells:
A. For DWM‐1: A 12‐inch pilot hole was advanced from the bottom of the second string of casing, approximately 700 linear feet BLS to 935 linear feet BLS. Contractor was unable to complete construction of this well, and terminated its efforts at 935 linear feet BLS.
B. For DWM‐2: A 12‐inch pilot hole will be advanced from the bottom of the second string of casing, approximately 1000 feet BLS to TD. This pilot hole will be used to determine the location of the base of USDW through geophysical logging and/or the collection of in‐situ water quality samples required by the DEP. The last 200 feet (approximately) of the well will be the monitor well production/sampling interval and will be completed as open‐hole.
When the well’s total depth is determined by the TDS concentration, the appropriate suite of geophysical logs will be run to surface or depth indicated by the DEP.
CONTRACTOR shall suspend drilling, when directed, to allow CLIENT to identify through open‐ hole sampling intervals, the transition zone to the base of the USDW. Geophysical logging and packer testing for obtaining in‐situ ground water samples may be required starting at a depth of approximately 1100 feet BLS. The number of water quality tests and type geophysical logging tools required for each event will be determined by the DEP and paid for under separate contract.
13. For DWM‐2: CONTRACTOR shall not commence well development prior to a determination of the TD/sampling interval, installation of the final 6‐inch diameter string of casing and following curing of the grout (a minimum of 12 hours). The well will be developed by pumping until return water is clean/clear and contains a turbidity of less than 20 Nephelometric Turbidity Units (NTUs), has a TDS concentration equal to or less than 10,000 mg/L (or as agreed by DEP), a pH representative of formation water in a limestone unit (approximately 6.9 to 7.5) and is accepted by the DEP. All ground water produced during sampling and well development will be contained in on‐site tanks and removed from the location by an approved transporter and disposed of at a licensed disposal facility at the direction of the DEP under separate contract. Casing strings 1 & 2 will extend to ground surface. The final 6‐inch diameter casing string will extend 3 feet above the ground surface and be protected inside a ten‐inch, steel, above ground vault that will be emplaced in a 3 foot by 3 foot square, concrete pad and secured with a lock. It will be outfitted with a minimum of a 1‐horsepower centrifugal pump. The selection of this pump and associated
DEP Contract No. EXC018, Exhibit A‐1, Page 4 of 13 plumbing will be based on the capacity of the production/sampling interval determined during the water quality collection event and the well development process.
Payments and Deliverables:
14. CONTRACTOR shall be paid at the completion of each Task identified in Figure 3 (Revision 2) on a cost reimbursement, lump sum (fixed price), or unit rate basis as delineated in Figure 3 (Revision 2). Payment shall be made based on completion and DEP approval of the deliverables established in paragraph 15, below.
15. Deliverables for this project will be as follows and are determined by Tasks in their order of occurrence. Each Task will contain elements listed under specific Items that will be eligible for reimbursement at the time of their completion. Proof of payment for cost reimbursement activities will require receipts and other appropriate documentation (travel vouchers for travel reimbursement). All lump sum (fixed price) and fee schedule (unit rate) items will be invoiced using the payment method disclosed on Figure 3 (Revision 2) for the appropriate item.
The Department has established the following tasks for deliverable and payment points for this Contract. The Department reserves the right to modify this list of tasks through formal contract amendment.
Tasks Established for DWM‐1:
Task 1‐1: The following documents, services, equipment, supplies and materials were provided, determined eligible for payment, and paid: a Site specific Health and Safety Plan and OSHA Certifications (1A) and Payment and Performance Bonds and Insurance Demonstration (1B).
Task 1‐2: The following documents, services, equipment, supplies and materials were provided, determined eligible for payment, and paid: SFWMD General Water Use Permit for supply well (11A); SFWMD Well Construction Permit (11B); SFWMD Well Construction Permit for monitor well DWM‐1 (11C); SWPPP Generic NOI (11D); Drilling Pad Construction (1D); Supply Water Well Installation (1E); and Mobilization and Set Up of Drill Rig, materials, equipment, and supplies (1C).
The following deliverables were submitted in support of Task 1‐2 defined activities:
A. Copies of all issued permits and receipts from the permitting entities disclosing the actual cost for each permit.
B. Confirmation by DEP Contract Manager of the presence of necessary equipment, supplies and materials to begin commencement of work on the USDW monitor well DWM‐1.
C. Confirmation by the DEP Contract Manager of the completion of the construction of the water supply well.
D. A copy of the well completion report for the water supply well (includes all construction and casing details).
E. A copy of the driller’s log for the water supply well.
DEP Contract No. EXC018, Exhibit A‐1, Page 5 of 13
Task 1‐3: The following documents, services, equipment, supplies and materials were provided to the DEP and determined to be eligible for payment through February 6, 2015 for completion of the well through the installation of the 14‐inch diameter casing: Drill Rig with crew (2); Caliper logging of borehole in preparation for the installation of 24 inch casing (7A); installation of 112 linear feet of 24 inch diameter x 0.375 inch‐wall thickness ERW A53B casing and includes, centralizers, hub and welding (3A); Caliper logging of borehole in preparation for the installation of 14 inch casing (7B) ; installation of 700 linear feet of 14 inch diameter x 0.375 inch‐wall thickness ERW A53B casing, includes, centralizers, hub and welding (3B); Cement, Portland Type II (9A); Bentonite (drilling mud, Barite, gel) (9B); Consumables (rags, lubricants, pipe joint compound, etc.) (9C); Travel, reimbursement will be in accordance with section 112.061, Florida Statutes and will be submitted on form DEP 53‐203 Travel V3.2 (4/10/14), hotel room receipts required (10).
The following deliverables were submitted in support of the above defined activities:
A. The driller’s log as described in paragraph 9 above.
B. A cuttings sample collection log as described in paragraph 10 above.
C. Travel vouchers supporting reimbursable travel costs pursuant to Section 112.061, Florida
Statutes.
Task 1‐4. Contractor performed operations related to DWM‐1 for the period of February 9, 2015 through March 19, 2015. Eligible reimbursement elements under Task 1‐4 are: Drill Rig with crew (2); Bentonite (drilling mud, Barite, gel) (9B); Consumables (rags, lubricants, pipe joint compound, etc.) (9C); Travel, reimbursement will be in accordance with section 112.061, Florida Statutes and will be submitted on form DEP 53‐203 Travel V3.2 (4/10/14), hotel room receipts required (10).
The following deliverables must be submitted in support of Task 1‐4 defined activities:
A. The driller’s log as described in paragraph 9 above.
B. A cuttings sample collection log as described in paragraph 10 above.
C. Travel vouchers supporting reimbursable travel costs pursuant to Section 112.061, Florida
Statutes.
Task 1‐5: The Department reserves the right, by Contract Change Order, to require additional services to allow DWM‐1 to be used for the collection of ground water samples from a shallower depth interval or for its proper abandonment. The cost for any such services will be negotiated and described in the executed Contract Change Order (15). No such services shall be performed prior to authorization.
Contractor was unable to drill and complete DWM‐1, as a result of the downhole drilling assembly becoming lodged at 935 linear feet BLS. On March 20, 2015, Contractor initiated the drilling of a replacement well, Deep Monitor Well #2 (DWM‐2).
Tasks Established for DWM‐2:
Task 2‐1: The previously provided and paid for deliverables for DWM‐1, Tasks 1‐1, have been applied to the requirements of DWM‐2. As such, no additional services or costs are allowed for them in regard to DWM‐2.
DEP Contract No. EXC018, Exhibit A‐1, Page 6 of 13
Task 2‐2: The following documents, services, equipment, supplies and materials must be provided to the DEP prior to requesting payment. Eligible payment elements under Task 2‐2 are:
SFWMD Well Construction Permit for monitor well DWM‐2 (11C); Drilling Pad Extension to include DWM‐2 drilling location (1D); and Relocation and Set‐Up of Drill Rig, materials, equipment, and supplies (1C). The Contractor will continue to utilize the Water Supply Well constructed under Task 1‐2 above (1E).
The following deliverables must be submitted in support of Task 2‐2 defined activities:
A. Copies of all issued permits and receipts from the permitting entities disclosing the actual cost for each permit.
B. Confirmation by DEP Contract Manager of the presence of necessary equipment, supplies and materials to begin commencement of work on the USDW monitor well DWM‐2.
C. Confirmation by the DEP Contract Manager of the continued use of the previously constructed water supply well.
Task 2‐3: The following documents, services, equipment, supplies and materials must be provided to the DEP prior to requesting payment. Eligible pay items under Task 2‐3 are: Drill Rig with crew (2); Caliper logging of borehole in preparation for the installation of 24 inch casing (7A); installation of 112 linear feet of 24 inch diameter x 0.375 inch‐wall thickness ERW A53B casing and includes, centralizers, hub and welding (3A); Caliper logging of borehole in preparation for the installation of 14 inch casing (7B) ; installation of 1,009 linear feet of 14 inch diameter x
0.375 inch‐wall thickness ERW A53B casing, includes, centralizers, hub and welding (3B); Cement, Portland Type II (9A); Bentonite (drilling mud, Barite, gel) (9B); Consumables (rags, lubricants, pipe joint compound, etc.) (9C); Travel, reimbursement will be in accordance with section 112.061, Florida Statutes and will be submitted on form DEP 53‐203 Travel V3.2 (4/10/14), hotel room receipts required (10).
The following deliverables must be submitted in support of Task 2‐3 defined activities:
A. The driller’s log as described in paragraph 9 above.
B. A cuttings sample collection log as described in paragraph 10 above.
C. Travel vouchers supporting reimbursable travel costs pursuant to Section 112.061, Florida
Statutes.
Task 2‐4: The following documents, services, equipment, supplies and materials must be provided to the DEP prior to reimbursement. Eligible reimbursement elements under Task 2‐4 are: Drill Rig with crew (2); installation of approximately 1700 linear feet of 6‐inch diameter x
0.280 inch‐wall thickness ERW A53B casing, includes, centralizers, hub and welding (3C);
Contractor may be directed to drill an estimated additional 200 linear foot of open‐hole below the determined base of the 6‐inch diameter x 0.280 inch‐wall thickness ERW A53B casing (2);
Well Development (4); Caliper log, temperature log and cement bond log (7C); Cement, Portland Type II (9A); Bentonite (drilling mud, Barite, gel) (9B); Consumables (rags, lubricants, pipe joint compound, etc.) (9C); Travel, reimbursement will be in accordance with section 112.061, Florida Statutes and will be submitted on form DEP 53‐203 Travel V3.2 (4/10/14), hotel room receipts required (10).
The following deliverables must be submitted in support of Task 2‐4 defined activities:
A. The driller’s log as described in paragraph 9 above.
DEP Contract No. EXC018, Exhibit A‐1, Page 7 of 13
B. A cuttings sample collection log as described in paragraph 10 above.
C. Travel vouchers supporting reimbursable travel costs pursuant to Section 112.061, Florida
Statutes.
Task 2‐5: The following documents, services, equipment, supplies and materials must be provided to the DEP prior to requesting payment. Eligible payment items under Task 2‐5 are:
installation of 10” Diameter Steel Locking Wellhead Vault with 3' x 3' Concrete Pad and 1 HP centrifugal pump (at a minimum) with piping (5). DEP Contract Manager must confirm that CONTRACTOR has completed the construction of the Wellhead Vault and Concrete Pad as described in paragraph 13 above.
Task Established Task Impacting Both DWM‐1 and DWM‐2:
Task 3‐1: The following documents, services, equipment, supplies and materials must be provided to the DEP prior to requesting payment. Eligible payment items under Task 3‐1:
demobilization of all equipment, materials, garbage, supplies and the restoration of the site to pre‐drilling conditions (1F). DEP Contract Manager must confirm that the condition of the drilling site has been restored to pre‐drilling conditions as described in paragraph 2 above.
Task Completion Dates:
The following task completion dates have been proposed by the CONTRACTOR and are currently under consideration by the Department. Final task completion dates shall be authorized by written letter from the Department to the CONTRACTOR, after further negotiation between the parties. As time is of the essence for this project, completion of this work is needed as quickly as possible.
Task Due Date Following Original Contract Execution
1‐1 Within 30 calendar days.
1‐2 Within 79 calendar days.
1‐3 Within 110 calendar days.
1‐4 Within 143 calendar days.
1‐5 To be determined if added by Change Order
2‐1 N/A Covered under 1‐1.
2‐2 Within 155 calendar days
2‐3 Within 185 calendar days
2‐4 Within 224 calendar days
2‐5 Within 239 calendar days
3‐1 Within 265 calendar days
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Contract No. EXC018, Exhibit A-1, Page 8 of 13
Figure 1
Figure 2 (Revision 1): DEP USDW Montioring Wells' Location and Drilling Pad
DEP Contract No. EXC018, Exhibit A-1, Page 9 of 13
Figure 2 (Revision 1)
Layne Christensen Company Monitor Well Installation
Collier-Hogan Property
Exhibit A-1, Figure 3 (Revision 2)
DEP Contract No. EXC018, Exhibit A-1, Page 10 of 13
A B C D E F G H I J
Task Item Description Qty Unit Rate Total Notes Payment Method DEP -Layne
Contract 1 Mobilization/Demobilization (Limited to one round trip for this project.)
The total cost appearing in Item 1 includes items 1A through 1E.
Includes site prep, moving in rig and equipment and setting up, performance and payment bonds, insurance, breaking down and moving out rig and equipment, removing temp. well pad. Excludes trailer for SME and power to trailer.
1-1 1A Health and Safety Plan 1 EA $750.00 $750.00 Fixed Price $750.00
1-1 1B Bonds and Insurance Demonstration 1 EA $6,350.00 $6,350.00 Fixed Price $6,350.00
1-2 1C Mobilization and Set Up of Rig, Materials, Equipment, and Supplies 1 EA $25,000.00 $25,000.00 Fixed Price $25,000.00
1-2 1D Pad Construction (Soil samples must be collected by the DEP or its Subject Matter Expert for submission to the DEP Laboratory for analysis to establish background conditions prior to construction of the pad and commencement of drilling.)
1 EA $10,000.00 $10,000.00 Pad Construction includes: drilling location foundation preparation to include berms, silk fences, road foundation and pad foundation. Refer to Exhibit A-1, Figure 2 (Revision 1).
Fixed Price $10,000.00
1-2 1E Supply Water Well Installation (Ground water sample will be collected by the DEP or its Subject Matter Expert for submission to the DEP Laboratory for analysis to determine the acceptability of the water quality prior to the drilling of the monitor well.)
1 EA $6,500.00 $6,500.00 Fixed Price $6,500.00
1-2 1G Mobile field office with AC and appropriate equipment (Subject Matter Expert is responsible for the equipment, materials, and supplies for the mobile office/laboratory.)
1 TBD TBD Excluded, to be done by FDEP SME if desired. N/A
1-3 1-4
2 Rate: Drill Rig w/crew 46 12-hour shift $5,920.00 $272,320.00 Estimates are based on 12 hour shifts. The Contractor shall calculate the number of hours and minutes per task, based on the daily drilling operations reports, for the invoice period. For example: 156 hours and 45 minutes would equate to 156.75 hours, divided by 12 hrs. = 13.0625 shifts billable to the project.
Rate Schedule - per 12-hr shift $272,320.00
3 Casings:
1-3 3A 24" x 0.375"-wall ERW A53B 112 LF $135.00 $15,120.00 Estimated quantity, casing price includes centralizers, lugging and welding.
Rate Schedule - per LF $15,120.00
1-3 3B 14" x 0.375"-wall ERW A53B 700 LF $68.00 $47,600.00 Estimated quantity, casing price includes centralizers, lugging and welding.
Rate Schedule - per LF $47,600.00
6 Fluid/Cuttings Disposal
1-3 1-4
6A Transportation and disposal of drilling mud/fluids Excluded, to be done under FDEP OER Contract. N/A
1-3 1-4
6B Transportation and disposal of solid drill cuttings Excluded, to be done under FDEP OER Contract N/A
7 Geophysical Services and personnel 1-3 7A Caliper log on borehole for 24" casing 1 EA $3,500.00 $3,500.00 Rate Schedule - Per Log $3,500.00
1-3 7B Caliper log on borehole for 14" casing 1 EA $3,770.00 $3,770.00 Rate Schedule - Per Log $3,770.00
N/A 8 Water Sampling Services and personnel (packers, meters, equipment, materials) necessary to determine total dissolved solids (TDS)
Excluded, to be done by SME under separate contract with Layne, if desired. (Rig shift charges (Item 2) apply to FDEP if/when this is ongoing.)
Rate Schedule - Per Hour N/A
9 Drilling materials (e.g. drilling mud, cement, etc.) please list separately.
USDW Deep Monitor Well #1 (hereinafter referred to as DWM-1) All Tasks beginning with the designation of 1-# tracks with DWM-1 activities.
Collier-Hogan Property
Exhibit A-1, Figure 3 (Revision 2)
DEP Contract No. EXC018, Exhibit A-1, Page 11 of 13
A B C D E F G H I J
Task Item Description Qty Unit Rate Total Notes Payment Method DEP -Layne
Contract
1-3 1-4
9A Cement, Portland Type II 1251 94-pound sack $16.00 $20,016.00 Estimated quantity, is theoretical fill volumes + 30%, assumes 200 LF of neat cement at bottom of each casing with the balance having 6% Bentonite. This item will be billed in 94 lb quantities. The FDEP recognizes that the Contractor may obtain cement in other bulk quantities than per bag.
Rate Schedule - Per 94 lb sack. $20,016.00
1-3 1-4
9B Bentonite (drilling mud, Barite, gel) 17 Pallet (2800 LBS = 56 bags at 50 lbs per bag)
$650.00 $11,050.00 Estimated quantity. This item will be billed in quantities less than a full pallet, at a prorated amount. (Example: A pallet = 56, 50 lb bags. If 46 of the 56 bags are used during the billing period, the Contractor may bill the FDEP 46/56 = .82 of a pallet.
Rate Schedule - Per Pallet $11,050.00
1-3 1-4
9C Consumables (rags, grease, pipe joint compound, etc.) 46 12-hour shift $50.00 $2,300.00 Estimated quantity. The quantity used for this billing item must agree with the total drilling shifts billed under Item 2 above.
Rate Schedule - Per 12-hr shift $2,300.00
1-3 1-4
10 Travel, reimbursed in accordance with Section 112.061, Florida Statutes. Room receipts required.
204 Per man-day, Cost reimbursable, motel room plus $36.00/day food allowance
$96.00 $19,584.00 Estimated quantity and costs, assumed $60 per hotel room per day Cost Reimbursable $19,584.00
11 Permit(s) - Cost Reimbursable 1-2 11A SFWMD General Water Use Permit for supply well 1 EA $350.00 $350.00 Cost Reimbursable $350.00
1-2 11B SFWMD Well Construction Permit for supply well 1 EA $100.00 $100.00 Cost Reimbursable $100.00
1-2 11C SFWMD Well Construction Permit for monitor well 1 EA $100.00 $100.00 Cost Reimbursable $100.00 1-2 11D SWPPP Generic NOI 1 EA $250.00 $250.00 Cost Reimbursable $250.00 1-2 1-3 1-4
12 Frac tanks for packer testing/development water (20,000 gallon tanks) Excluded, to be handled by FDEP OER Contract. N/A
1-3 1-4
13 Off-Site Disposal of Packer Test/Development Water Excluded, to be handled by FDEP OER Contract. N/A
N/A 14 Standby Time 12-hour shift $5,000.00 Excluded, to be handled by SME under separate contract with Layne.
Estimated quantity to be determined by FDEP SME. (This item is based on situations whereby the SME ceases drilling activities to perform water quality evaluations in determining next steps for drilling activity. This charge shall be prorated in a fashion similar to that described under Item 2.)
Rate Schedule - Per 12 hr shift. N/A
1-5 15 Repurposing of DWM-1 to allow for the collection of ground water samples from a shallower depth or for well abandonment activities, to be determined and added by Change Order if authorized.
This item is subject to the execution of a Contract Change Order prior to the performance of work.
Subtotal DWM-1: $444,660.00 $444,660.00
Task Item Description Qty Unit Rate Total Notes Payment Method DEP -Layne
Contract 1 Mobilization/Demobilization (Limited to one round trip for this project.)
The total cost appearing in Item 1 includes items 1A through 1F.
Includes site prep, moving in rig and equipment and setting up, performance and payment bonds, insurance, breaking down and moving out rig and equipment, removing temp. well pad. Excludes trailer for SME and power to trailer.
2-1 1A Health and Safety Plan 1 This item covered previously under 1-1 and supports this effort. N/A $0.00
USDW Deep Monitor Well #2 (hereinafter referred to as DWM-2) All Tasks beginning with the designation of 2-# tracks with DWM-2 activities.
Collier-Hogan Property
Exhibit A-1, Figure 3 (Revision 2)
DEP Contract No. EXC018, Exhibit A-1, Page 12 of 13
A B C D E F G H I J
Task Item Description Qty Unit Rate Total Notes Payment Method DEP -Layne
Contract
2-1 1B Bonds and Insurance Demonstration 1 This item covered previously under 1-1 and supports this effort. N/A $0.00
2-2 1C Relocation and Set Up of Rig, Materials, Equipment, and Supplies 1 EA $2,500.00 $2,500.00 Fixed Price $2,500.00
2-2 1D Drilling Pad Extension 1 EA $1,000.00 $1,000.00 Pad Extension Construction includes: drilling location foundation preparation for monitor well #2 (DWM-2). Refer to Exhibit A-1, Figure 2 (Revision 1).
Fixed Price $1,000.00
2-1 1E Supply Water Well Utilization 1 This item was constructed under Task 1-2 (1E) above. As a result, there is no charge for this item under Task 2-1.
N/A $0.00
2-1 1G Mobile field office with AC and appropriate equipment (Subject Matter Expert is responsible for the equipment, materials, and supplies for the mobile office/laboratory.)
1 TBD TBD Excluded, to be done by FDEP SME if desired. N/A
2-3 2-4
2 Rate: Drill Rig w/crew 42 12-hour shift $5,920.00 $248,640.00 Estimates are based on 12 hour shifts. The Contractor shall calculate the number of hours and minutes per task, based on the daily drilling operations reports, for the invoice period. For example: 156 hours and 45 minutes would equate to 156.75 hours, divided by 12 hrs. = 13.0625 shifts billable to the project.
Rate Schedule - per 12-hr shift $248,640.00
3 Casings:
2-3 3A 24" x 0.375"-wall ERW A53B 112 LF $135.00 $15,120.00 Estimated quantity, casing price includes centralizers, lugging and welding.
Rate Schedule - per LF $15,120.00
2-3 3B 14" x 0.375"-wall ERW A53B 1003 LF $68.00 $68,204.00 Estimated quantity, casing price includes centralizers, lugging and welding.
Rate Schedule - per LF $68,204.00
2-4 3C 6" x 0.280"-wall ERW A53B 1700 LF $26.00 $44,200.00 Estimated quantity, casing price includes centralizers, lugging and welding.
Rate Schedule - per LF $44,200.00
2-4 4 Well Development (provide price on a per hour basis and estimate number of hours)
12 HRs $350.00 $4,200.00 This item is needed to complete the well to insure that it is operational. Rate Schedule - per hour $4,200.00
2-5 5 10” Diameter Steel Locking Wellhead Vault with 3' x 3' Concrete Pad and 1 HP centrifugal pump (at a minimum).
1 LS $11,500.00 $11,500.00 Fixed Price $11,500.00
6 Fluid/Cuttings Disposal
2-3 2-4
6A Transportation and disposal of drilling mud/fluids Excluded, to be done under FDEP OER Contract. Rate Schedule - Per 4,000 gal tanker.
N/A
2-3 2-4
6B Transportation and disposal of solid drill cuttings Excluded, to be done under FDEP OER Contract Rate Schedule - Per 12 CY dump truck.
N/A
7 Geophysical Services and personnel 2-3 7A Caliper log on borehole for 24" casing 1 EA $3,500.00 $3,500.00 Rate Schedule - Per Log $3,500.00
2-3 7B Caliper log on borehole for 14" casing 1 EA $3,770.00 $3,770.00 Rate Schedule - Per Log $3,770.00
2-4 7C Caliper log, temperature log and cement bond log on borehole for 6" casing.
1 EA $6,570.00 $6,750.00 Rate Schedule - Per Log $6,750.00
2-4 7D Gamma, dual induction, sonic and fluid conductivity logs and log-derived TDS on final hole, video survey of completed well.
1 EA $16,500.00 Excluded, to be done by FDEP SME under separate contract with Layne, if desired.
Rate Schedule - Per Log N/A
Collier-Hogan Property
Exhibit A-1, Figure 3 (Revision 2)
DEP Contract No. EXC018, Exhibit A-1, Page 13 of 13
A B C D E F G H I J
Task Item Description Qty Unit Rate Total Notes Payment Method DEP -Layne
Contract
2-3 2-4
8 Water Sampling Services and personnel (packers, meters, equipment, materials) necessary to determine total dissolved solids (TDS)
24 HRs $200.00 Excluded, to be done by SME under separate contract with Layne, if desired. (Rig shift charges (Item 2) apply to FDEP if/when this is ongoing.)
Rate Schedule - Per Hour N/A
9 Drilling materials (e.g. drilling mud, cement, etc.) please list separately.
2-3 2-4
9A Cement, Portland Type II 2809 94-pound sack $16.00 $44,944.00 Estimated quantity, is theoretical fill volumes + 30%, assumes 200 LF of neat cement at bottom of each casing with the balance having 6% Bentonite. This item will be billed in 94 lb quantities. The FDEP recognizes that the Contractor may obtain cement in other bulk quantities than per bag.
Rate Schedule - Per 94 lb sack. $44,944.00
2-3 2-4
9B Bentonite (drilling mud, Barite, gel) 20 Pallet (2800 LBS = 56 bags at 50 lbs per bag)
$650.00 $13,000.00 Estimated quantity. This item will be billed in quantities less than a full pallet, at a prorated amount. (Example: A pallet = 56, 50 lb bags. If 46 of the 56 bags are used during the billing period, the Contractor may bill the FDEP 46/56 = .82 of a pallet.
Rate Schedule - Per Pallet $13,000.00
2-3 2-4
9C Consumables (rags, grease, pipe joint compound, etc.) 42 12-hour shift $50.00 $2,100.00 Estimated quantity. The quantity used for this billing item must agree with the total drilling shifts billed under Item 2 above.
Rate Schedule - Per 12-hr shift $2,100.00
2-3 2-4
10 Travel, reimbursed in accordance with Section 112.061, Florida Statutes. Room receipts required.
215 Per man-day, Cost reimbursable, motel room plus $36.00/day food allowance
$96.00 $20,640.00 Estimated quantity and costs, assumed $60 per hotel room per day Cost Reimbursable $20,640.00
11 Permit(s) - Cost Reimbursable N/A 11A SFWMD General Water Use Permit for supply well Obtained under DW#1 above under 1-2. Cost Reimbursable $0.00
N/A 11B SFWMD Well Construction Permit for supply well Obtained under DW#1 above under 1-2. Cost Reimbursable $0.00
2-2 11C SFWMD Well Construction Permit for monitor well 1 EA $100.00 $100.00 Cost Reimbursable $100.00
N/A 11D SWPPP Generic NOI Obtained under DW#1 above under 1-2. Cost Reimbursable $0.00 2-2 2-3 2-4
12 Frac tanks for packer testing/development water Excluded, to be handled by FDEP OER Contract. N/A
2-3 2-4
13 Off-Site Disposal of Packer Test/Development Water Excluded, to be handled by FDEP OER Contract. N/A
2-4 14 Standby Time 3 12-hour shift $5,000.00 Excluded, to be handled by SME under separate contract with Layne.
Estimated quantity to be determined by FDEP SME. (This item is based on situations whereby the SME ceases drilling activities to perform water quality evaluations in determining next steps for drilling activity. This charge shall be prorated in a fashion similar to that described under Item 2.)
Rate Schedule - Per 12 hr shift. N/A
Subtotal DWM-2: $490,168.00
3-1 1F Demobilization of all equipment, materials, supplies and the restoration of the site to pre-drilling conditions.
1 EA $10,000.00 $10,000.00 This task is to be performed at the completion of all drilling and well completion operations.
Fixed Price $10,000.00
$10,000.00 $944,828.00Grand Total DWM-1 and DWM-2:
All Tasks beginning with the designation of 3-# covers both DWM-1 and DWM-2 at project completion.
Subtotal DWM-1 and DWM-2 Demobilization:
| Old 5-13-15 EXC018 Amend 1, Exhibit A-1 and Figures.pdf |
| 5-6-15 1650 hrs Figure 3 (Revision 2) Collier-Hogan.pdf |
| Figure 3 (Revised) |
| 5-7-15 Draft EXC018 Amend 1 Pkg.pdf |
| EXHIBIT A-1 |
| 5-6-15 1650 hrs Figure 3 (Revision 2) Collier-Hogan.pdf |
| Figure 3 (Revised) |
File details come from the government source that posted it. Updated .