CN-370000-CN826-T1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|CN826|1903a62f2685da1206aab1c3d3236eae
Contract number
CN826
Issued by
Florida

About this file

This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection's Division of Recreation and Parks, involving Dewberry Engineers Inc. as the consultant for the Grayton Beach State Park Boardwalk Replacement project. The contract is identified as CN826 TA01, located in Walton County, Florida, and involves the Florida Department of Environmental Protection's Bureau of Design and Construction.

The task assignment covers professional services for replacing an existing beach access boardwalk, with a total fixed price cost of $6,462.03. The project is divided into three subtasks: Preconstruction Meeting ($1,176.66), Construction Phase Services ($3,170.34), and Construction Close-out Services ($2,115.03). The contract period runs from April 15, 2025, to October 12, 2025 (180 calendar days). The scope includes reviewing contractor submittals, conducting site visits, performing substantial completion walk-throughs, and preparing documentation for permitting agencies. Dewberry will provide deliverables such as meeting minutes, submittal reviews, construction request for information (RFI) responses, site visit documentation, and project completion certification.

View the file

Other files

File Type Posted
CN-370000-CN826-T2.pdf PDF
CN-370000-CN826.pdf PDF
ContractBudgetExport.csv CSV file
CN-370000-GC913-T3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Consultant’s Task Assignment Notification

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-084

Rev. 0 /2025 of 2

FDEP Contract No: Project Number: Task Assignment No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Task Description:

Project Manager:

Schedule:

Start Date: Completion Date:

Fixed Price Cost: Cost Reimbursement (Not to Exceed):

Total Task Amount:

Signatures and Date:

1.

Budget Representative, FDEP Signature Date

2.

Project Manager, FDEP Signature Date

3.

Signature Date

4.

Signature Date

5.

Contract Authority, FDEP Signature Date

CN826 61360C 01

Grayton Beach State Park Boardwalk Replacement

Dewberry Engineers, Inc.

Rudy Mall, PE

(850) 635-2620 rmall@dewberry.com

Vu Nguyen

(850) 245-2630 Vu.Nguyen@FloridaDEP.gov

Moving Construction Administration subtasks from expired task assignment CN220 TA23 into the new CN826TA01 per the attached proposal dated 4/10/2025. Subtasks using CN220 rates are indicated in the proposal with an asterisk (*) in the subtask heading.

Theresa Carron

Upon Execution 04/15/2026

$6,462.03 $0.00

$6,462.03

Tamika Bass

Theresa Carron

Rudy Mall, PE

Vu Nguyen

Michael W. Foster Jr., P.E.

Division of Recreation and Parks

Consultant’s Task Assignment Notification

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-084

Rev. /2025 2 of 2

Encumbrance Information:

Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount

Total: $6,462.03

File details come from the government source that posted it. Updated .