About this file
This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection's Division of Recreation and Parks, involving Halff Associates, Inc. as the consultant for a project at Rainbow Springs State Park. The contract (FDEP Contract No. CN822) is specifically for the Park Drive Repave Project, with the primary point of contact being Bryant King, P.E. from Halff Associates, and the FDEP Contract Manager is Vu Nguyen.
The contract covers multiple subtasks including site improvement plans, permitting, bid support services, construction administration, geotechnical services, and civil design services for the repaving of Park Drive and parking lots. The total fixed price cost is $75,031.21, with an additional $500.00 in reimbursable costs. The project is scheduled to run from the date of execution through February 26, 2026, with various subtasks ranging from 7 to 35 calendar days in duration. The work involves design, permitting, geotechnical assessment, and construction administration tasks for demolishing two parking lots, resurfacing the entrance road, and making associated improvements to the park's infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ContractBudgetExport.csv | CSV file | |
| CN-370000-CN201-T6CO2.pdf | ||
| CN-370000-CN822.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.03.04 09:42:37 -05'00'
Bryant A King
2025.03.05 11:58:33 -05'00'
Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2025.03.10 09:37:24 -04'00'
Proiect Schedule:
An estimated project schedule has been included below:
Activity Duration (Calendar Days)
Subtask 1-Site Improvement Plans Final Construction Documents 34
Subtask 2 -Permitting 35
Subtask 3 -Bid Support Services 7
Subtask 4A- Shop Drawings and RFl's 14
Subtask 4B - Pre-Construction Meeting 7
Subtask 4C - Substantial Completion and Documents 7
Subtask 8 -Additional Geotechnical Services 21
Subtask 9 -Additional Civil Design Services 30
Summa.rt of Fees*:
The project fees are summarized below:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1- Site Improvement Plans Final
Construction Documents $ 29,220.00 $ -
Subtask 2 -Permitting $ 11,905.00 $ 500.00
Subtask 3 - Bid Support Services $ 4,215.00 $ -
Subtask 4 - Limited Construction Administration $ 19,780.00 $ -
Subtask 5 -Additional Geotechnical Services $ 4,433.71 $ -
Subtask 6 - Additional Civil Design Services $ 5,477.50 $ -
Total Fixed Price Cost $ 75,031.21
Total Reimbursable Cost $ 500.00
Overall Total Cost $ 75,531.21
*NOTE: The hourly rates and fees shown in the above tables represents the approved rates from the previous continuing services contract under Contract Number 213 (CN213). Use of the fees previously approved in CN213 for this proposal does not constitute approval for use in future proposals that were not previously executed as a task assignment under the previous continuing services contract.