This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, involving Hydra Engineering & Construction, LLC for a project at Edward Ball Wakulla Springs State Park. The contract involves the Florida Department of Environmental Protection, Hydra Engineering & Construction, LLC, O'Neal Surveying & Mapping, Inc., Bloodhound LLC, and GS Preble, with Vu Nguyen as the FDEP Contract Manager and Garland Sandel as the Project Manager.
The task assignment is for a comprehensive pre-engineering design investigation into the failure of an existing sanitary sewer force main and premature deterioration of associated lift station pumps and infrastructure. The project is divided into three subtasks: a utility locate survey, a subsurface location survey of the existing sanitary sewer, and a sanitary sewer force main investigation. The total fixed price cost is $9,576.78, with no reimbursable costs. The project is scheduled to begin upon authorization and complete by 12/23/2025, with each subtask having specific duration and timing. Payment will be made upon approval of deliverables for each subtask by the FDEP in the specified amounts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN815.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN815-T1.pdf | ||
| CN-370000-CN815.pdf | ||
| CN-370000-PL521-T4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Recreation and Parks
Consultant’s Task Assignment Notification
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
DRP-084
Rev. 0 /2025 of 2
FDEP Contract No: Project Number: Task Assignment No:
Project Location Project
Consultant’s Name:
Consultant’s Representative:
Phone: Email:
FDEP Contract Manager:
Phone: Email:
Task Description:
Project Manager:
Schedule:
Start Date: Completion Date:
Fixed Price Cost: Cost Reimbursement (Not to Exceed):
Total Task Amount:
Signatures and Date:
1.
Budget Representative, FDEP Signature Date
2.
Project Manager, FDEP Signature Date
3.
Signature Date
4.
Signature Date
5.
Contract Authority, FDEP Signature Date
CN815 61590 2
Edward Ball Wakulla Springs State Park Sewer
Hydra Engineering & Construction, LLC
Leslie Weiss,
(850) 926-2559 lahope@hydraengineering.com
Vu Nguyen,
(850) 245-2630 Vu.Nguyen@FloridaDEP.gov
This proposal is a comprehensive Pre - Enginneering design into the failure of the existing sanitary sewer force main and the premature deterioration of the associated lift station pumps and infrastructure. Dated 4/23/25
Garland Sandel
Upon Execution 12/23/2025
$9,576.78 $0.00
$9,576.78
Tamika Bass
Garland Sandel
Leslie Weiss, P.E., C.G.C.
Vu Nguyen
Michael W. Foster Jr., P.E.
06/02/2025
06/02/2025
06/02/2025
06/02/2025
06/02/2025
Division of Recreation and Parks
Consultant’s Task Assignment Notification
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
DRP-084
Rev. /2025 2 of 2
Encumbrance Information:
Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount
Total: $9,576.78
HYDRA ENGINEERING & CONSTRUCTION, LLC
36 Jasper Thomas Road, Crawfordville, Florida 32327 (850) 926-2593 www.hydraec.com
Rev. May 26, 2025 April 23, 2025
Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: CN815- TA , BDC Project No.
Edward Ball Wakulla Springs State Park, Sanitary Sewer Investigation
Dear Mr. Sandel:
Hydra Engineering & Construction, LLC is pleased to provide the attached proposal summary and man-hour documentation for the Sewer Force Main Investigation at Edward Ball Wakulla Springs State Park.
Please see the attached proposal summary and deliverables.
Sincerely, Leslie Weiss, P.E., C.G.C.
Hydra Engineering & Construction, LLC
Sewer –Edward Ball Wakulla Springs State Park
As requested, Hydra is submitting this proposal to provide the sewer main investigative services at the Wakulla Springs State Park. Hydra will conduct a comprehensive investigation into the failure of the existing sanitary sewer force main and the premature deterioration of the associated lift station pumps and infrastructure. The objective of this study is to determine the root cause(s) of the observed issues, including suspected excessive pressure events within the force main and the potential presence of aging infrastructure that may have surpassed its intended service life.
To achieve this, Hydra will undertake a series of investigative steps aimed at evaluating the condition of the force main system, confirming the performance of critical components, and identifying any contributing factors to the recent failures. The following tasks outline the approach that will be used to support this assessment: The investigative procedures will consist of the below listed items:
1. Hydra will engage with a surveyor to locate and flag the areas where existing air release valves (ARV) should be located based upon as-builts and previous design plans in our possession.
2. Hydra will engage with a qualified utility contractor to expose the existing air release valves along the force main within the boundaries of the park and if needed, along the force main outside the boundaries of the park. Hydra will also request that the contractor expose the force main within the park in multiple locations to confirm the pipe size and type.
3. Hydra will make recommendations based upon the data received on the suspected cause of the failed force main and potential remedies to correct the conditions (minor repairs up to replacement of the existing force main within the park).
Subtask 1: Survey Description: Optimum (formally O’Neal) Surveying & Mapping, Inc. shall conduct a utility location survey of all known ARV (Air Release Valves) along the alignment of the existing sanitary sewer force main, both within the limits of the park and outside the limits of the park. Hydra will assist in coordination with FDEP and Wakulla Conty Public Works to gain access to the force main.
Deliverable: Consultant will provide electronic copies (AutoCAD and pdf) digitally signed and sealed of the utility survey.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 1: Utility Locate Survey
Firm Name Position Classification Hourly Rate Hours
Total Fixed Price Cost
O'Neal Surveying & Mapping, INC. Chief Surveyor $200.92 1 $200.92 O'Neal Surveying & Mapping, INC CAD Operator $123.75 2.5 $309.38
O'Neal Surveying & Mapping, INC Field Crew (Party
Chief/1Man) $192.34 5 $961.70
Hydra Engineering & Construction, LLC
Principal Engineer $227.41 1 $227.41
Hydra Engineering & Construction, LLC
Project Engineer $129.22 2 $258.44
Hydra Engineering & Construction, LLC
Office Administrator $77.53 1 $77.53
Fixed Price Cost Total: $2,035.38
Total for Subtask 1: (Fixed Price Cost) = $2,035.38
Subtask 2: Subsurface Location Survey of Existing Sanitary Sewer Force Main within the Limits of Wakulla Springs State Park
Description: Tasks include a subsurface utility location survey of the existing sanitary sewer force main at 6 different locations (TBD) along the alignment of the force main. Blood Hound will flag 20-25 L.F. of sewer force main in each of the 6 different locations for excavation or potholing activities to determine the existing utility size and material.
Deliverable: Consultant will provide subsurface investigation narrative with attachments and .kmz files to project manager electronically in PDF format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 2: Subsurface Location Survey of Existing Sanitary Sewer
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Bloodhound LLC. Field Technician $254.01 8 $2,032.08
Hydra Engineering & Construction, LLC
Principal Engineer $227.41 1 $227.41
Hydra Engineering & Construction, LLC
Project Engineer $129.22 4 $516.88
Hydra Engineering & Construction, LLC
Office Administrator $77.53 1 $77.53
Fixed Price Cost Total: $2,853.90
Total for Subtask 2: (Fixed Price Cost) = $2, Subtask 3: Sewer
Description: Hydra will engage with a qualified utility contractor to perform the ARV maintenance and testing (both inside the limits of the park and along the force main outside the limits of the park).
Hydra will direct the utility contract to expose the force main along the established route in 4 - 6 separate locations to confirm the pipe size a type. Hydra will also direct the utility contractor to excavate the manifold location where the lift station that serves the residences connects to the primary force main existing the park. Hydra will also consult with G.S. Preble as he is the original D.O.R. of the lift station and force main. G.S. Preble will perform one site visit to the park to review and evaluate the current conditions of the system.
Hydra will gather and analyze all available as-built drawings, maintenance records, and previous inspection reports related to the force main and lift station infrastructure to establish a baseline understanding of system. In addition, Hydra will perform hydraulic calculations to determine expected total dynamic head values of the existing system to compare to measured pressures within the system.
Deliverable: Hydra will provide site notes and a sanitary sewer investigation report in PDF format to the project manager.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3: Sanitary Sewer Force Main Investigation
Firm Name Position Classification Hourly Rate Hours
Total Fixed Price Cost
GS Preble Structural Engineer $158.04 8.5 $1,343.34 Hydra Engineering & Construction, LLC
Project Engineer $129.22 20 $2,584.40
Hydra Engineering & Construction, LLC
Principal Engineer $227.41 3 $682.23
Hydra Engineering & Construction, LLC
Office Administrator $77.53 1 $77.53
Fixed Price Cost Total: $4,687.50
Total for Subtask 3: (Fixed Price Cost) = $4,687.50
Project Schedule:
Subtask Duration (Calendar
Days) Dates
Subtask 1: Utility Locate Survey 30 Upon receiving Authorization
Subtask 2: Subsurface Location Survey of Existing Sanitary Sewer
Upon receiving Authorization
Subtask 3: Sanitary Sewer Force Main Investigation
From Completion of
Subtask 2
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask
Reimbursable
Subtask 1: Utility Locate Survey $2,035.38 $0.00
Subtask 2: Subsurface Location Survey of Existing Sanitary Sewer
$2,853.90 $0.00
Subtask 3: Sewer $4,687.50 $0.00
Total Fixed Price Cost: $9,576.78
Total Reimbursable Cost: $0.00
Overall Total Cost: $9,576.78
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.