This document is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP), involving EAC Consulting, Inc. and Justin Architects, P.A. as the primary consulting firms. The task assignment is part of FDEP Contract No. CN301, Task Assignment No. 02, focused on the Hugh Taylor Birch State Park Restroom & Pavilion Replacements project located in Florida.
The contract involves professional services for conducting visual assessments of four existing buildings/structures within Hugh Taylor Birch State Park, including the Banyan & Live Oak Restroom & Pavilion Combo, South BBQ Shelter, BBQ Shelter, and North Restroom. The total contract value is $29,843.36, comprising $28,843.36 in fixed price costs and $1,000.00 in reimbursable expenses. The scope of work includes site visits, visual architectural and structural assessments, providing alternative construction options, listing permitting requirements, conducting a preliminary code review, creating renderings, and coordination meetings. The project is scheduled for 30 calendar days, with a completion date of 6/15/2024, and will result in a written report with recommendations, cost estimates, and alternative building options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN301-CMC4.pdf | ||
| CN-370000-CN301-T2CO1.pdf | ||
| CN-370000-CN300-T15.pdf | ||
| CN-370000-CN301-CMC3.pdf | ||
| CN-370000-CN301-CMC2.pdf | ||
| CN-370000-CN301-T2CO2.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-370000-CN301-CMC1.pdf | ||
| CN-370000-CN301.pdf | ||
| CN-370000-CN301-T1CO1.pdf | ||
| CN-370000-CN301-A1.pdf | ||
| CN-370000-CN301-T1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN301 02 FDEP-BDC 61490C
Hugh Taylor Birch Restroom & Pavilion Replacements
EAC
HUNTLEY HIGGINS, P.E., PMP 954-714-2055 hhiggins@eacconsult.com
Ralph Perkins 850-245-2460 Ralph.Perkins@FloridaDEP.gov
New professional services to provide building assessments and alternative construction options for buildings BL03914, BL039015, BL039029,and BL039022 per the attached proposal dated 12/12/2022.
Theresa Carron
Upon Execution $ 28,843.36 6/15/2024 $ 1,000.00
$ 29,843.36
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2022.12.14 11:47:31 -05'00'
Theresa Carron T.Carron Digitally signed by T.Carron Date: 2022.12.14 11:52:19 -05'00'
Ralph Perkins
HUNTLEY HIGGINS, P.E., PMP
Michael W. Foster Jr., PE
61490C 37505000039 080039/23 423001 U3100 131500 QK $ 29,843.36
$ 29,843.36
Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.12.14 12:04:36 -05'00'
Huntley Higgins Digitally signed by Huntley Higgins Date: 2022.12.14 13:49:42 -05'00' 12/14/2022
Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.12.15 16:25:08 -05'00'
December 12, 2022
Theresa Carron - Project Manager Florida Department of Environmental Protection Division of Recreation & Parks Bureau of Design and Construction
Re: FDEP Agreement Number CN301 TA2 Hugh Taylor Birch State Park - Restroom & Pavilion Replacements EAC Project Number 15024.SD01-02
Dear Ms. Carron:
EAC Consulting, Inc. (EAC) is pleased to submit this fee proposal to provide professional services for the referenced project.
Our services on this project will be supported by the following sub-consultant:
Justin Architects, P.A., previously known as Cartaya and Associates Architects, P.A.
In accordance with Section 16.1 of the Professional Services Agreement (CN301), our previously approved subconsultant, Cartaya & Associates Architects, P.A. now has a new corporate identity which became effective as of September 1, 2022. The firm is now known as Justin Architects, P.A.
(See attached letter from Justin Architects, P.A., dated September 28, 2022)
Sincerely, EAC Consulting, Inc.
Huntley Higgins, P.E Vice President
cc. File Michael Adeife, P.E. – EAC Consulting, Inc.
Encl. Correspondence from Justin Architects, P.A., dated September 28, 2022
H tl Hi i P E
Hugh Taylor Birch State Park - Restroom & Pavilion Replacements CN301, Task Assignment Number 2
SUBTASK 1: PRELIMINARY
Description: (Describe the tasks to be performed. If you need to invoice for multiple steps, divide the task into parts A, B, C, etc.)
The EAC team will be performing visual assessments of four (4) existing buildings/structures to assess their existing condition from an architectural and structural perspective. The following buildings/structures will be assessed:
Banyan & Live Oak Restroom & Pavilion Combo – BL039014 South BBQ Shelter – BL039015 BBQ Shelter - BL039029, [adjacent to the Manatee Pavilion (BL039028) – not included in this scope] North Restroom – BL039022
The following tasks will be undertaken:
Site visit to verify existing conditions/dimensions four (4) existing buildings/structures Visual Assessment of existing buildings/structures condition Visual assessments shall include architectural and structural building systems Provide alternate options/constructability methods (i.e., CMU vs. pre-manufactured buildings).
List Permitting Requirements Preliminary Code Review Renderings four (4) buildings (one view each building).
Coordination meetings
Deliverable: (These are the payment triggers – what items will consultant provide to FDEP, including format, size, number, minimum content, due date, etc.)
Written report with recommendations for four (4) existing buildings Alternate options for four (4) existing buildings, where feasible List of Permitting Requirements Preliminary Code Review Order of Magnitude (OOM) Cost Estimates. Included in written report Order of Magnitude (OOM) Cost Estimates for alternates. Included in written report.
Renderings four (4) buildings (one view each building)
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 1 – Research Existing Drawings and Conduct Field Measurements Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost EAC Consulting, Inc. Principal Engineer $291.49 20 $5,829.80 EAC Consulting, Inc. Clerical $50.32 4 $201.28 Justin Architects Principal $150.10 8 $1,200.80 Justin Architects Sr. Architect $209.25 80 $16,740.00 Justin Architects Drafter $58.53 60 $3,511.80 Justin Architects Administrative Assistant $42.49 32 $1,359.68
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Postage N/A Printing $966.62 Overnight Travel (if applicable)
N/A
Mileage (@ $0.585 per mile) 75 miles roundtrip @$0.445/mile = $33.38 Reimbursable Total Cost $1,000.00
Total for Subtask 1: $28,843.36 (Fixed Price Cost) + $1,000.00 (Reimbursable Cost) = $29,843.36
SUBTASK 2: 60% DOCUMENTS
Not Used
SUBTASK 3: 100% DESIGN DOCUMENTS
Not Used
SUBTASK 4: CONSTRUCTION ADMINISTRATION SERVICES
Not Used
Project Schedule:
Activity Duration (Calendar Days) Subtask 1 Research Existing Drawings and
Conduct Field Measurements 30 days
Subtask 2: 60% Design Document N/A N/A Subtask 3: 100% Design Documents N/A N/A Subtask 4: Construction Administration Services
N/A
N/A
Summary of Fees:
Subtask Subtask Fixed Price
Cost Subtask Reimbursable
Subtask 1 $28,843.36 $1,000.00 Subtask 2: 60% Design Document $0.00 $0.00 Subtask 3: 100% Design Documents $0.00 $0.00 Subtask 4A: CA Services - Bidding $0.00 $0.00 Subtask 4B: CA Services – Construction Phase $0.00 $0.00 Total Fixed Price Cost: $28,843.36 Total Reimbursable Cost: $1,000.00 Overall Total Cost: $29,843.36
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
List of Assumptions and Exclusions
The preparation of as-builts and/or construction documents are not included in this proposal Floor plans or schematic designs are not included in this proposal Asbestos studies and/or environmental surveys are not included in this proposal Services related to BIM, LEED, testing and permitting are not included in this proposal