This document is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP), involving Gresham Smith as the consultant for the Jonathan Dickinson State Park FLAP Phase I Trail project. The contract, identified as CN297, is specifically for Project #6G752 located in Martin County, Florida. The document includes a proposal dated July 14, 2020, and involves multiple signatories from FDEP and Gresham Smith, including Richard Rowe, Philip Stone, and Tyler Strickland.

The task order is for updating construction drawings to meet current FDOT specifications and securing the required USACE permit. The total task amount is $41,658.34, broken down into a fixed price cost of $7,658.34 and a cost reimbursement not to exceed $34,000.00. The work is divided into two subtasks: Task 1A involves updating plan sheets, revising the engineer's cost estimate, and updating pay items to 2020 standards, while Task 1B involves reapplying for a USACE permit through Environmental Science Associates (ESA). The project is set to start upon execution and has a completion date of 6/30/2021, with payment to be made upon approval of deliverables for each subtask by FDEP.

View the file

Other files

File Type Posted
CN-370000-CN297-CMC1.pdf PDF
CN-370000-CN297-T1CO1.pdf PDF
CN-370000-CN297.pdf PDF
CN-370000-CN297-CMC2.pdf PDF
CN-370000-CN297-T1.pdf PDF
CN-370000-CN297-CMC3.pdf PDF
CN-370000-CN297-T1CO3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN297 2 FDEP-D5-BDC 6G752

Jonathan Dickinson State Park FLAP Phase I Trail

Gresham Smith

Tyler Strickland 850-219-8404 tyler.strickland@greshamsmith.com

Philip Stone 850-245-2770 Philip.Stone@FloridaDEP.gov

Task to provide updates on construction drawings to meet current FDOT specifications and assistance with securing the required USACE permit as described in attached proposal dated 7/14/2020.

Richard J. Rowe

Upon Execution $ 7,658.34 6/30/2021 $ 34,000.00

$ 41,658.34

Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2020.07.15 08:30:59 -04'00'

Richard Rowe Richard J. Rowe Digitally signed by Richard J.

Rowe Date: 2020.07.15 11:26:32 -04'00'

Philip Stone P.T. Stone Digitally signed by P.T. Stone Date: 2020.07.15 15:22:03 -04'00' 7/15/2020

Tyler Strickland R. Tyler Strickland, P.E., J.D.

2020.07.15 16:24:38 -04'00'

Michael W. Foster Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2020.08.05 16:18:21 -04'00'

6G752 6G752 37505000043 088137/20 339074 U3200 134000 MG $ 41,658.34