This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection (FDEP) for Contract CN292, Task Assignment No. 02, involving AE Engineering, Inc. as the consultant for the FKOHL - Old Spanish Harbor Bridge Improvements and Retrofit project. The contract is managed by Jim Post from FDEP and involves Rod Myrick as the consultant's representative, with the document dated June 2016.
The task assignment covers three primary subtasks with a total contract value of $404,740.30, broken down into fixed price costs of $362,152.19 and reimbursable costs of $42,588.11. The subtasks include: (1) Pre-Construction activities lasting 7 days, (2) Construction services spanning 300 days with extensive site inspections, documentation, and compliance monitoring, and (3) Project Close Out procedures requiring 45 days. The project is scheduled for completion by December 31, 2018, with AE Engineering, Inc. providing construction and engineering inspection services for the bridge retrofit. Pricing is structured with hourly rates for different position classifications, including Senior Project Engineer, Project Administrator/Inspector, and Contract Support Specialist, with additional reimbursable costs for items such as sample retrieval, concrete cylinder testing, and site visits.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN292-T1.pdf | ||
| CN-370000-CN292-T1CO1.pdf | ||
| CN-370000-CN292.pdf | ||
| CN-370000-GC856-CO1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .