CN-370000-CN193-CO2.pdf
PDF 494 KB Posted
- Contract number
- CN193
- Issued by
- Florida
About this file
This document is a Change Order for a construction services contract (CN 193) between the Florida Department of Environmental Protection's Division of Recreation & Parks and The Watauga Company, pertaining to work at Okeechobee Battlefield State Park. The change order involves the State of Florida, specifically the Bureau of Recreation & Parks located in Tallahassee, and The Watauga Company, a general contractor based in Titusville, Florida.
The change order authorizes the installation of a 2" water service from an existing curb stop to the 1 1/2" line at the building, with an associated cost increase of $3,622.50. The breakdown includes $2,600 for subcontractor costs (materials, equipment, labor, and area restoration), $250 for additional supervision, and a 5% overhead and profit markup. The change order extends the contract completion date by 90 days to July 22, 2015, with the total contract sum increasing from $181,532.50 to $185,155.00. The document is signed by representatives from the Department of Environmental Protection and The Watauga Company, indicating mutual agreement to the proposed changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN193.pdf | ||
| CN-370000-CN193-CCO1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .