CM RFP International Community School Bid For.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Construction Manager at Risk (CMAR) Services
Solicitation number
PE-55519-NONST-2027-000000003
Issued by
Dekalb County, Georgia

About this file

This is a Construction Manager at Risk (CMAR) bid template for the International Community School project in Georgia. The project involves construction of a permanent, state-of-the-art educational facility on a newly acquired site designed to serve Pre-K-5th grade students. The anticipated building size is up to 95,000 square feet with a total estimated project cost of $24,000,000. Program elements include a multi-story building, outdoor learning areas, playground facilities, bus loop, parent drop-off areas, parking, athletic fields, utility infrastructure, and site development, with some elements potentially phased into future projects. The facility is expected to initially serve 600 students with opportunities for future expansion. The selected CMAR is currently in the design development phase and will be expected to actively participate in value engineering, lead time analysis, project scheduling, and constructability reviews to support development of construction documents.

The bid template provides a comprehensive framework for the Construction Manager to detail hard construction trade costs, general conditions and general requirements, and labor rates. Bidders are required to populate sections including general conditions and general requirements as a lump sum, CM fee mark-up percentage, general liability insurance percentage, pre-construction services, change order mark-ups, and GMP contingency percentages. The template includes detailed line items for project personnel (project manager, superintendent, estimating, accounting, health and safety), direct labor (foremen and laborers at various rates and times), field setup, accommodation, plant and equipment, temporary utilities and services, sundries, and general expenses. Construction period is estimated at 14 weeks. The CM Labor Rates section requires bidders to provide hourly rates for position-specific staff members, with examples provided for project executives and other positions.

View the file

Other files

File Type Posted
ICS Phase II CMAR RFP_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Construction Phase

INTERNATIONAL COMMUNITY SCHOOL
Section 1 - Construction Phase General Conditions, Fees and Insurances

Ref Description Total Hard Construction Trade Costs

1 General Conditions & General Requirements (Lump Sum)

2 CM Fee Mark-Up (%)

3 General Liability Insurance (%)

4 Pre- Construction Service (Lump Sum)

5Change Order GC Mark-up (%)
5.1Change Order Fee Mark-up (%)
5.2Change Order Insurance Mark-up (%)

6 CM Fee Change Order Holiday (Lump Sum)

7 Cost per week for General Conditions & General Requirements (Lump Sum)

8aGMP Conversion at (eg x% Procurement)
8bGMP Contingency percentage
Assumptions and Exclusions
Weekly on-site meetings required, CM to fill out remainder
1)
2)

2. General Cond. & Req.

INTERNATIONAL COMMUNITY SCHOOL
Section 2 - General Requirements & General Conditions
Trade ReferenceDescription
1.00Project PersonnelQtyUnitUnit CostTotalComments
1.1Project Managerwks- 0
1.2Trade Project Managerwks- 0
1.3Assistant Project Managerwks- 0
1.4Superintendentwks- 0
1.5Assistant Superintendentwks- 0
1.6Estimatingwks- 0
1.7Accountingwks- 0
1.8Building Department Coordinatorwks- 0
1.9Health & Safetyvisit- 0
1.10MEP Engineerwks- 0
1.11Securitywks- 0
Additional Project Personnel; The CM is to insert below further cost items as may be required;- 0
- 0
Subtotal Project Personnel- 0
2.00Direct LaborQtyUnitUnit CostTotalComments
2.1Labor Foreman (S/T)wks0
2.2Laborer Foreman (O/T)wks0
2.3Journeyman Laborer (R/T)wks0
2.4Journeyman Laborer (O/T) (Daily)wks0
2.5Laborer Foreman (O/T) (Saturday)wks0
2.6Laborer Foreman (O/T) (Sunday)wks0
2.7Laborer (O/T) (Saturday)Day0
2.8Laborer (O/T) (Sunday)Day0
Additional Direct Labor; The CM is to insert below further cost items as may be required;0
0
Subtotal Direct Labor0
3.00Field SetupQtyUnitUnit CostTotalComments
3.1Telephone/Fax Conn.nr- 0
3.2Temporary Plumbinglump sum- 0
3.3Temporary Electricslump sum- 0
3.4Temporary Phasing Protectionlump sum- 0
3.5Temporary Floor Covering at each phaselump sum- 0
3.6Temporary Wall and/or zip wall construction (CM to propose strategy)lump sum- 0
3.7Signagelump sum- 0
3.8First Aid Trainingman- 0
3.9Induction Trainingman day- 0
Additional Field Setup; The CM is to insert below further cost items as may be required;- 0

Subtotal Field Setup - 0

4.00AccommodationQtyUnitUnit CostTotalComments
4.1Site Officewks- 0
4.2Containerswks- 0
4.3Off-site Material Storage (Unit price to hold)wks- 0
Additional Accommodation; The CM is to insert below further cost items as may be required;

Subtotal Accommodation - 0

5.00Plant/EquipmentQtyUnitUnit CostTotalComments
5.1Scaffolding / Access Equipmentwks- 0
5.2Scissor liftwks- 0
Additional Plant/Equipment; The CM is to insert below further cost items as may be required;

Subtotal Plant/Equipment - 0

6.00Temporary Utilities & ServicesQtyUnitUnit CostTotalComments
6.1Electrical Consumption/Temporary Electrical to Sitewks- 0
6.2Water & Sewer Consumption/Temporary Water and Sewer to Sitewks- 0
6.3Temporary Portable Toiletswks- 0
6.4Telephone/Internet Consumption and Hook-upwks- 0
6.5Cleaning & Protection Materialslot
Additional Temporary Utilities & Services; The CM is to insert below further cost items as may be required;

Subtotal Temporary Utilities & Services - 0

7.00SundriesQtyUnitUnit CostTotalComments
7.1Insuranceslump sum- 0
7.2Bondslump sum- 0
Additional Sundries; The CM is to insert below further cost items as may be required;

Subtotal Sundries - 0

8.00General ExpensesQtyUnitUnit CostTotalComments
8.1Water / Coffee Service, Office Supplies and Project Meetingswks- 0
8.2Shop Drawing Reprographics (C.O. Reproduction Reimbursable)wks- 0
8.3Courier / Postagewks- 0
8.4Progress Photographs (holobuilder or similar software)lump sum- 0
8.5Travelwks- 0
8.6Misc. Toolslot- 0
8.7Field Communicationslot- 0
8.8Petty Cash & Misc. Expenseslot- 0
- 0
Additional General Expenses; The CM is to insert below further cost items as may be required;

Subtotal General Expenses - 0

General Conditions & General Requirements Total- 0
Construction Period (Weeks)14.00
General Conditions & General Requirements $/Week- 0

3. CM Labor Rates

INTERNATIONAL COMMUNITY SCHOOL
Section 3 - Construction Manager Resource Hourly Rates
PositionStaff Member NameHourly Rate
e.g. Project ExecJohn Smith$0.00
Example 2Example 2