This document includes a federal contract opportunity solicitation for an elevator modernization project and reference files. The U.S. Army Corps of Engineers, Pittsburgh District, is seeking to refurbish the electrical geared traction elevator at the Monongahela River Charleroi Locks and Dam in Westmoreland County, Pennsylvania. Major work includes removing and replacing the elevator driving machine, controls, wiring, fixtures, cables, governor assembly, and installing an air conditioning unit and associated controls in the machine room. Additional requirements are upgrading light fixtures, receptacles, and the disconnect switch as well as installing detectors in the hoistway, machine rooms, and lobby areas. The small business set-aside is $22 million. The anticipated award date is mid-August with a magnitude cost range of $250,000 to $500,000 and a completion time of less than 270 days. Interested firms must be registered in SAM and PIEE with the proposal manager role. Reference files of drawings and photos are provided but have been reduced in size.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Results List Bid Opening.pdf | ||
| W911WN23B8022 Amendment 2.pdf | ||
| DBA WD 06232023.gov.pdf | ||
| CHR Site Visit Sign in Sheet.pdf | ||
| W911WN23B8022 0001.pdf | ||
| DBA WD 06152023.gov.pdf | ||
| CHR Elevator Modernization_Technical Specification.pdf | ||
| W911WN23B8022 06212023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE DRAWINGS
(FILES BEEN REDUCED, ORIGINAL IS AVAILABLE UPON REQUEST)
SERVICE TRANSFORMER
ORIGINAL MIDDLE WALL
BRIDGE
DAM SERVICE
DAM PIER
POWERHOUSE
LAND WALL
SERVICE BUILDING
OPERATIONS BUILDING
TOWER
ACCESS
FOOTBRIDGE
FOOTBRIDGE
ESPLANADE
NEW CONTROL TOWERCONTROL SHELTER
NEW UPSTREAM
NEW FOOTBRIDGE
NEW MIDDLE WALL
RIVER WALL
LAND WALL
CONTROL SHELTER
NEW DOWNSTREAM
C
C
E
C
E
E
IP
P W
P :d m s
A O
L
C H
A
.d g n
H
T S
D E
S Q
A U
G
:5
A O
L
C H
A
.d g n
.0
:1
C
M
IL
L E
R
E L E
C T
R
IC
A L S
Y S
T E
M S
R O
N A
L D
R
G A
D O
M S
K I
D
N G
U Y
E N
L O
C K W
A L L S P
L A
N
O V
E R
A L L
FLOW
MONONGAHELA RIVERNN
80’0 40’
SCALE: 1"=40’
UPPER AND LOWER GUARD WALLS NOT SHOWN.2.
ALL IS EXISTING UNLESS OTHERWISE NOTED.1.
NOTES:
FLOW
SCALE: 1"=40’
LOCK WALLS PLAN - OVERALL
A29/230 s
J
O H
N
N
IT
E S
P .E
A P
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M O
N O
N G
A H
E L
A R
IV
E R
C H
A R
L E
R O I L
O C
K S A
N D D
A M
PITTSBURGH DISTRICT
P
IT
T S
B U
R G
H P
A
IV
E R C
H A
M B
E R C
O M
P L E
T
IO
N W
W N
B
AS-AWARDED CERTIFIED FINAL
W
W N
C
NEW RIVER CHAMBER
LAND CHAMBER
(ELEVATOR)
CONTRACTOR
WORK LIMIT
CONTRACTOR
LAY-DOWN AREA
H4ECNLJT
Rectangle
H4ECNLJT
Rectangle
H4ECNLJT
Callout
OUTDOOR COMPRESSOR/
CONDENSER UNIT (APPROX. SIZE 36"x24"x12) SUPPORTED AT 821.50 El
H4ECNLJT
Callout WALL-MOUNTED MINI-SPLIT INDOOR UNIT (APPROX. SIZE 36"x12"x8"
H4ECNLJT
Line
H4ECNLJT
Line
H4ECNLJT
Line
H4ECNLJT
Rectangle
H4ECNLJT
Line
H4ECNLJT
Line
H4ECNLJT
Line
H4ECNLJT
Callout
CONDENSATE LINE TO DRAIN TO LOWER ROOF DRAIN
H4ECDHLN
Rectangle
H4ECDHLN
Callout
EXISTING ELEVATOR DISCONNECT SWITCH
H4ECDHLN
Rectangle
H4ECDHLN
Callout NON-FUSED DISCONNECT SWITCH FOR CONDENSER UNIT MOUNT AT 820.50 El
PHOTOS
(FILE HAS BEEN REDUCED, ORIGINAL IS AVAILABLE UPON REQUEST)
File details come from the government source that posted it. Updated .