CDRL.docx

DOCX document 115 KB Posted

Attached to
aDvisory sErvices For rEsearch aNd Development (DEFEND)
Solicitation number
FA9453-23-R-A006
Issued by

View the file

Other files

File Type Posted
20221220_PWS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

aDvisory sErvices For rEsearch aNd Development (DEFEND)

FA9453-23-R-A006

CONTRACT DATA REQUIREMENTS LIST

1 OCTOBER 22

Item
Title
Subtitle
DID
A001
Contract Funds Status Report

DI-MGMT-81468/T

A002
Funds and Man-Hours Expenditure Report

DI-FNCL-80331A

A003
Scientific, Tech Reports
Final Report
DI-MISC-80711A/T
A004
Status Report
Quarterly Status Report
DI-MGMT-80368A
A005
Test/Inspection Report
Test Report
DI-NDTI-80809B
A015
Systems Engineering Management Plan

DI-SESS-81785A

A016
Contractor’s Risk Management Plan

DI-MGMT-81808

A018
Management Plan

DI-MGMT-80004A

A019
Conference Minutes

DI-ADMN-81250B

A020
Presentation Material

DI-ADMN-81373

A021
Scientific and Technical Reports Summary
Research, Analysis and Findings Report
DI-MISC-80048
A022
Interface Control Document

DI-SESS-81248B

A023
Government Property Inventory Report
Government Furnished Property (GFP) and Contractor Acquired Property (CAP)
DI-MGMT-80441C
A024
Developmental Design Drawings/Models and Associated Lists
End item Data Package
DI-SESS-81002F

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A001
2. TITLE OF DATA ITEM............:
Contract Funds Status Report (CFSR)

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-MGMT-81468 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
PWS Part 7

6. REQUIRING OFFICE..............: AFRL/RVBN

7. DD250 REQ................................: LT

8. APP CODE.................................:See blk 16
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:QTRLY
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES

Refer to Block 16 for additional distribution instructions.

DRAFT
FINAL
AFRL/RVBN
0
1
AFRL/RVKB
0
LT
15. TOTAL:
0
1

16. REMARKS

Blk 8: Approval of contractor format is required on initial submittal. All subsequent submittals shall be non-approval items, and re-submittals may be required if contractor submits a delivery item that is unsatisfactory.

Blk 9: All financial performance data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement E: Distribution authorized to DoD components only; Contractor Performance Evaluation, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

EXPORT CONTROL WARNING: All technical data shall be marked as follows: “WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22,U.S.C., Sec. 2751, et seq.) or the Export Administration Action of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.”

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 11: Prepared as of the end of each calendar quarter or contractor accounting period nearest the end of each quarter.

Blk 12: Submit within 25 calendar days after first full quarter following authorization to proceed (ATP).

Blk 13: Subsequent submissions shall be 25 calendar days after end of the reporting period.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A003
2. TITLE OF DATA ITEM............:
Scientific and Technical Reports
3. SUBTITLE..................................:
Final Report
4. AUTHORITY.............................:
DI-MISC-80711A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0

6. REQUIRING OFFICE..............: AFRL/RVBN

7. DD250 REQ................................: DD

8. APP CODE.................................:A
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
FINAL
CRC
AFRL/RVBN
1
1
AFRL/RVKB
0
L
15. TOTAL:
1
1

16. REMARKS

THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit any version of the scientific and technical report to DTIC.

Blk. 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current AFRL ANSI/NISO Standard Z39.18-2005, or other most current report preparation guidance. The contractor shall complete the most current SF 298 Report Documentation Page, and submit it with the report. The contractor shall complete the following blocks of the SF 298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), and 14-16c. Incomplete reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor. NOTE: The report preparation guidance and SF 298 are available at: https://www.kirtland.af.mil/Units/AFRL-Space-Vehicles-Directorate/

The contractor shall deliver two editable electronic copies of the report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A CD-ROM (CD-R) is the acceptable media for submittal (CD-RWs are not acceptable). Electronic media shall be marked I.A.W. the AFRL ANSI/NISO Standard Z39.18-2005 guidelines, or other most current report preparation guidance. Submission via unencrypted or unsecure email is not permitted.

Blk 7: UPON NOTIFICATION OF ACCEPTANCE OF THE SCIENTIFIC AND TECHNICAL REPORT FROM THE PROGRAM OFFICE, the contractor shall submit the final Receiving Report (DD Form 250) in WAWF. In preparing the final DD Form 250, code the shipment number with a “Z.” Do not upload the Scientific and Technical Report into WAWF or DTIC. NOTE: SUBMITTAL OF THE DD FORM 250Z PRIOR TO ACCEPTANCE NOTIFICATION WILL RESULT IN REJECTION OF THE DD FORM 250Z FINAL RECEIVING REPORT.

Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement C, and other required markings, shown indented below:

“Distribution authorized to US Government Agencies and their contractors; Critical Technology, Export Controlled [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)

“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PG OF THE REPORT EXCEPT THE SF 298.)

“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blks 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Schedule, CLIN 0002. The USAF will review and, if necessary, return the report with comments no later than the date specified in the Schedule, CLIN 0002. If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than the date specified in the Schedule, CLIN 0002.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A004
2. TITLE OF DATA ITEM............:
Status Report
3. SUBTITLE..................................:
Quarterly Status Report
4. AUTHORITY.............................:
DI-MGMT-80368A/T (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0

6. REQUIRING OFFICE..............: AFRL/RVBN

7. DD250 REQ................................: LT

8. APP CODE.................................:N
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:MTHLY
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
0
1
AFRL/RVKB
0
LT
15. TOTAL:
0
1

16. REMARKS

Blk 4: Tailor DID as follows: Delete paragraph 3.2.3.

An electronic copy shall be delivered as both a .pdf file and the most current version of Microsoft Word. A CD-ROM is acceptable media for submittal. Unclassified reports may also be submitted by e-mail to the program manager only if the contractor has an IECA/ECA PKI program that allows for secure communications with the DoD. E-mail encryption capability based on PGP platform is not acceptable.

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 11: Prepared as of the end of each reporting month.

Blk 12: Submit within 60 calendar days following authorization to proceed (ATP).

Blk 13: Subsequent submissions shall be 10 calendar days after end of the reporting period.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A005
2. TITLE OF DATA ITEM............:
Test Inspection Report

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-NDTI-80809B (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0

6. REQUIRING OFFICE..............: AFRL/RVBN

7. DD250 REQ................................: LT

8. APP CODE.................................:N
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
0
1
AFRL/RVKB
0
LT
15. TOTAL:
0
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 10: After each major test event specified in the integrated master schedule Blk 11: The first business day following completion of the test event Blk 12: 25 calendar days following completion of the test event Blk 13: 25 calendar days following completion of subsequent test events

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A015
2. TITLE OF DATA ITEM............:
Systems Engineering Management Plan

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-SESS-81785A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:A
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
0
LT
15. TOTAL:
1
1

16. REMARKS

Blk 4: The contractor shall provide a Systems Engineering Management Plan (SEMP) as described in DI-SESS-81785A but tailored to the mission assurance/risk class and level of complexity of the specific development effort.

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 10: Once with annual updates.

Blk 8, 11-12: The draft SEMP shall be delivered within 60 calendar days following Authorization to Proceed (ATP). The government will review and provide comments to the draft plan within 30 calendar days after receipt of the draft. Upon receipt of the comments, the contractor shall take no more than 15 calendar days to incorporate all required changes and deliver the final version of the plan.

Blk 13: Updates, as required, shall be delivered 30 calendar days after the last business day of each contract year.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A016
2. TITLE OF DATA ITEM............:
Contractor’s Risk Management Plan

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-MGMT-81808 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0

6. REQUIRING OFFICE..............: AFRL/RVBN

7. DD250 REQ................................: LT

8. APP CODE.................................:A
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
0
LT
15. TOTAL:
1
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 10: Once with annual updates.

Blk 8, 11-12: The draft RMP shall be delivered within 60 calendar days following Authorization to Proceed (ATP). The government will review and provide comments to the draft plan within 30 calendar days after receipt of the draft. Upon receipt of the comments, the contractor shall take no more than 15 calendar days to incorporate all required changes and deliver the final version of the plan.

Blk 13: Updates, as required, shall be delivered 30 calendar days after the last business day of each contract year.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A018
2. TITLE OF DATA ITEM............:
Management Plan

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-MGMT-80004A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:A
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
0
LT
15. TOTAL:
1
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 10: Once with annual updates.

Blk 8, 11-12: The draft Management Plan shall be delivered within 60 calendar days following Authorization to Proceed (ATP). The government will review and provide comments to the draft plan within 30 calendar days after receipt of the draft. Upon receipt of the comments, the contractor shall take no more than 15 calendar days to incorporate all required changes and deliver the final version of the plan.

Blk 13: Updates, as required, shall be delivered 30 calendar days after the last business day of each contract year.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A019
2. TITLE OF DATA ITEM............:
Conference Minutes

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-ADMN-81250B (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:N
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
0
1
AFRL/RVKB
0
LT
15. TOTAL:
0
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blks 10, 11, 12 & 13: Delivered within 10 business days after contract kick-off meetings and major programmatic reviews (i.e., SRR, PDR, CDR, etc.) or technical interchange meetings directed by the Government program manager.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A020
2. TITLE OF DATA ITEM............:
Presentation Material

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-ADMN-81373 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:N
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
0
LT
15. TOTAL:
1
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blks 10, 11, 12 & 13: Draft presentation material shall be delivered 5 business days before the scheduled review. Final presentation material will be delivered 5 business days after the review unless otherwise indicated.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A021
2. TITLE OF DATA ITEM............:
Scientific and Technical Reports Summary
3. SUBTITLE..................................:
Research, Analysis and Finding Report
4. AUTHORITY.............................:
DI-MISC-80048 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:N
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
0
1
AFRL/RVKB
0
LT
15. TOTAL:
0
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blks 10, 11, 12 & 13: As requested by the Government Program Manager

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A022
2. TITLE OF DATA ITEM............:
Interface Control Document

3. SUBTITLE..................................:

4. AUTHORITY.............................:
DI-SESS-81248B (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:A
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
0
LT
15. TOTAL:
1
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 10: Once with updates.

Blk 8, 11-12: The draft ICD shall be delivered within 60 calendar days after interface requirements development is complete and the initial requirements baseline is established. The government will review and provide comments to the draft ICD within 30 calendar days after receipt of the draft. Upon receipt of the comments, the contractor shall take no more than 15 calendar days to incorporate all required changes and deliver the final version of the ICD.

Blk 13: Updates shall be delivered within 30 calendar days after any substantive (non-administrative) changes are made to the interface.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 11 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A023
2. TITLE OF DATA ITEM............:
Government Property Inventory Report
3. SUBTITLE..................................:
Government Furnished Property (GFP) and Contractor Acquired Property (CAP) Inventory Report
4. AUTHORITY.............................:
DI-MGMT-80441C (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
FAR 52.245-1, PGI 245.402-71 , and PGI 245.103

6. REQUIRING OFFICE..............: AFRL/RVBN

7. DD250 REQ................................: LT

8. APP CODE.................................:A
9. DIST. STATEMENT REQUIRED......:
10. FREQUENCY......................................:SEMIA
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES

SEMIA = Every Six Months

DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
1
1
15. TOTAL:
2
2

16. REMARKS

Blk. 4: GFP/CAP Inventory Reports shall be in accordance with DFARS 245.402-71. If government furnished property or equipment is provided, the list shall be in accordance with DFARS PGI 245.103-72. Abbreviations are not allowed. Deliver an electronic copy as a Microsoft Excel document. A CD-ROM is acceptable media for submittal. Unclassified documents may be submitted by encrypted or password protected e-mail, or other secure file transfer method. E-mail encryption based on PGP platform is not acceptable.

Blk. 8: Ninety (90) days prior to the contract expiration date, the contractor shall deliver a “Draft” GFP/CAP Inventory Report in the format required by DFARS PGI 245.103-72, suitable for contract close-out purposes. Include the use/disposition recommendations for review and approval by the Government Program Manager, Contracting Officer, and/or the DCMA Property Administrator. The Government Program Manager will review and if necessary, return the list with comments within 30 calendar days.

Blk. 11 & 12: The contractor shall deliver an initial Baseline GFP/CAP Inventory Report within 30 days of the first inclusion of GFE/CAP in the contract. After the baseline is established, the property inventory shall be submitted semi-annually. Additional distributions may be requested by the Government Program Manager or the Contracting Officer.

Blk. 13: Thirty (30) days prior to the contract expiration date, the contractor shall deliver the “Final” GFP/CAP Inventory Report, representing all property delivered under CLIN 0002.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:

I. APPROVED BY:

H. DATE:
DDMonthYYYY

J. DATE: DDMonthYYYY

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 12 of 13 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:0002
B. EXHIBIT....................................:A
C. CATEGORY..............................:OTHER
D. SYSTEM/ITEM........:TBD
E. CONTRACT/PR NO.:FA0000-22-R-0000
F. CONTRACTOR.........:TBD
1. DATA ITEM NO........................:
A024
2. TITLE OF DATA ITEM............:
Developmental Design Drawings/Models and Associated Lists
3. SUBTITLE..................................:
End Item Data Package
4. AUTHORITY.............................:
DI-SESS-81002F (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......:
SOW Section 2.0
6. REQUIRING OFFICE..............:AFRL/RVBN
7. DD250 REQ................................:LT
8. APP CODE.................................:N
9. DIST. STATEMENT REQUIRED......:See blk 16
10. FREQUENCY......................................:See blk 16
11. AS OF DATE........................................:See blk 16
12. DATE OF FIRST SUBMISSION:See blk 16
13. DATE OF SUBSEQUENT SUBM.:See blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBN
1
1
AFRL/RVKB
0
LT
15. TOTAL:
1
1

16. REMARKS

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement C: Distribution authorized to US Government Agencies and their contractors; Critical Technology, [author fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBN, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

Export control warning: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .