CC_Mckinney_-_Switchboard_Replacement_-_Elec_IFC_Drawing.pdf
PDF 13 MB Posted
- Attached to
- McKinney Main Building Switchboard Replacement
- Solicitation number
- FY2027-CSP-069
- Issued by
- Collin County, Texas
About this file
Switchboard Replacement Project - Electrical IFC Drawing Summary
This is an Electrical Issue for Construction (IFC) drawing package for Collin College's McKinney Campus Main Building Switchboard Replacement Project, located at 2200 W. University Drive, McKinney, Texas 75071. The project scope encompasses the removal of the existing main service entrance switchboard and switchboard MSA, replacement with a new 4,000-amp main service entrance switchboard (SB-MAIN) rated at 480Y/277V three-phase, and installation of new electrical distribution equipment throughout the facility. Work includes removal and replacement of multiple panelboards and transformers, installation of new generator docking stations, modifications to electrical feeders and branch circuits, door replacement to the electrical room with panic hardware and card reader access control, and comprehensive circuit tracing and identification across the building. The project mandates that the Campus Network Operations Center (NOC) and associated cooling equipment remain energized and operational throughout the entire construction period, including during the main service entrance switchboard replacement. The anticipated major utility shutdown is scheduled during the Collin College McKinney Campus 2027 summer break, with all work requiring completion within pre-approved service windows when campus classes are not in session.
The work is organized into six construction phases: pre-construction alternate work, NOC power securing and redundancy, pre-shutdown work, utility shutdown and critical path activities, post-shutdown and facility integration work, and finishing work. Key technical requirements include installation of a digital power meter (DPM) compatible with BACnet for integration with the campus building management system, provision of surge protection devices rated at 300kA per phase minimum, system commissioning by both the contractor and the electrical distribution manufacturer, and complete tracing and identification of all existing circuits with typewritten panel schedules in Excel format. Copper conductors (#10 and smaller must be solid) and compliance with the 2026 National Electrical Code and 2024 International Energy Conservation Code are required. The contractor must coordinate all work with Collin College, the serving utility (ONCOR, contact: Brian Guest, 817-980-8920), and provide detailed methods of procedure (MOP) for review at least one month before proposed shutdown windows, with owner approval required at least two weeks in advance of any shutdown.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLLIN COLLEGE
MCKINNEY
2200 W UNIVERSITY DR
MCKINNEY, TX, 75071
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222 Project
SWITCHBOARD REPLACEMENT
ISSUE FOR CONSTRUCTION
2026-10-06
2200 W. UNIVERSITY DRIVE, MCKINNEY, TEXAS 75071
COLLIN COLLEGE MCKINNEY
MAIN BUILDING
26126-00
ISSUE FOR CONSTRUCTION 2026-10-06
PROJECT ISSUANCES:
DESCRIPTION DATE
NO SCALE
MAP - COLLIN COLLEGE MCKINNEY↑
PROJECT SHEET LIST
SHEET NO. SHEET NAME SHEET ISSUE DATE
ARCHITECTURAL
A101 ARCHITECTURAL FLOOR PLANS 2026.10.06
ELECTRICAL
E0.01 GENERAL NOTES & LEGENDS - ELECTRICAL 2026.10.06
E1.01 SITE PLAN - ELECTRICAL 2026.10.06
E2.01 OVERALL FLOOR PLAN - LEVELS 1 & 2 - ELECTRICAL 2026.10.06
E2.02 OVERALL FLOOR PLAN - LEVELS 3 & ROOF - ELECTRICAL 2026.10.06
E4.01 ENLARGED PLANS - ELECTRICAL 2026.10.06
E5.01 DETAILS - ELECTRICAL 2026.10.06
E6.01 ONE-LINE DIAGRAMS - ELECTRICAL 2026.10.06
E7.01 PANEL SCHEDULES - ELECTRICAL 2026.10.06
Grand total: 9
G
M
A P V
SPD
PNL
'A1'
A
DPM
1. THE INFORMATION ON THE EXISTING DRAWINGS ARE NOT FROM "AS BUILT" DRAWINGS
OR FIELD SURVEY, BUT FROM ORIGINAL DRAWINGS AND SITE INVESTIGATIONS. THIS
INFORMATION IS INCLUDED FOR REFERENCE ONLY. CONTRACTOR WILL BE
RESPONSIBLE FOR VISITING THE SITE PRIOR TO SUBMITTING A BID TO DETERMINE THE
AMOUNT OF WORK THAT WILL BE REQUIRED. CONTRACTOR SHALL EXAMINE THE
EXISTING BUILDING AND GENERALLY VERIFY THE LOCATION OF ALL EXISTING WORK
AND BECOME INFORMED AS TO THE RELATION TO AND EFFECT ON THE WORK
REQUIRED BEFORE SUBMITTING A BID. SUBMISSION OF A BID WILL CONSTITUTE
EVIDENCE THAT THE CONTRACTOR HAS INSPECTED THE SITE OF THE PROPOSED
WORK.
2. EXISTING MEP ITEMS TO BE REMOVED SHALL BE RETURNED TO THE OWNER OR
DISPOSED OF AS DIRECTED BY THE DESIGNATED OWNER'S REPRESENTATIVE.
3. COORDINATE DEMOLITION WORK WITH THE BUILDING MAINTENANCE PERSONNEL AND
OTHER TRADES PERFORMING WORK IN THE BUILDING PRIOR TO THE REMOVAL OF
ANY ITEMS OF EQUIPMENT OR SYSTEMS THAT WILL AFFECT OTHER SYSTEMS WITHIN
THE LIMIT OF NEW CONSTRUCTION OR OTHER AREAS OF THE BUILDING. CONTRACTOR
SHALL VERIFY WITH THE OWNER IF THE BUILDING WILL BE OCCUPIED DURING
CONSTRUCTION. ANY REQUIRED OUTAGES MUST BE COORDINATED WITH THE
OWNER.
4. PRIOR TO THE REMOVAL OF ANY MEP ITEMS OF EQUIPMENT, CONTRACTOR MUST
VERIFY THE ORIGIN AND TERMINATION OF THOSE SYSTEMS AND CONFIRM THAT THE
ITEMS BEING REMOVED DO NOT SERVE ANY ITEMS THAT ARE TO REMAIN (INCLUDING
THOSE IN AREAS OUTSIDE THE CONTRACT LIMITS).
5. DO NOT ABANDON ANY ITEMS IN PLACE. REMOVE ALL COMPONENTS ASSOCIATED
WITH EACH ITEM CALLED OUT TO BE REMOVED.
GENERAL DEMOLITION NOTES:
1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND LOCAL CODES,
RULES, REGULATIONS, AND REQUIREMENTS OF THE SERVICE UTILITY COMPANY.
2. ALL WORK SHALL COMPLY WITH THE BUILDING OWNER’S CONSTRUCTION
GUIDELINES.
3. ALL CONDUCTORS SHALL BE COPPER (#10 AND SMALLER SHALL BE SOLID).
4. WHERE CONDUCTOR SIZES ARE NOTED ON DRAWINGS AND/OR SCHEDULES, THAT
CONDUCTOR SIZE SHALL BE THROUGHOUT THE ENTIRE RUN, UNLESS NOTED
OTHERWISE.
5. PANELBOARD DIRECTORIES SHALL BE COMPLETELY FILLED OUT TO ACCURATELY
IDENTIFY EACH CIRCUIT (EXISTING AND NEW CIRCUITS) IN ALL PANELS WITHIN SCOPE
OF WORK. DIRECTORIES SHALL BE TYPEWRITTEN.
6. ELECTRIC CONNECTIONS TO ELECTRICAL DISTRIBUTION EQUIPMENT SHALL BE MADE
ONLY WHEN SUCH EQUIPMENT HAS BEEN DE-ENERGIZED.
7. ALL ELECTRICAL EQUIPMENT, SUCH AS PANELS, SWITCHBOARDS, TRANSFORMERS,
DISCONNECTS, ETC, SHALL HAVE PERMANENT ENGRAVED LABELS AS SHOWN ON
EQUIPMENT IDENTIFICATION DETAIL.
8. THE CONTRACTOR SHALL UPDATE ROOM NAMES AND ROOM NUMBERS ON FINAL
PANEL SCHEDULES TO REFLECT FINAL BUILDING CONDITIONS.
GENERAL POWER NOTES:
CEILING MOUNTED RECTANGULAR LIGHT FIXTURE
(HATCHING INDICATES EMERGENCY FIXTURE)
LIGHT SWITCH - SINGLE / THREE WAY / FOUR WAY
MANUAL MOTOR STARTER
LOW VOLTAGE SCENE SWITCH
MOTION OCCUPANCY / VACANCY SENSOR -
WALL / CEILING MOUNTED
M
L
SWITCH WITH OCCUPANCY SENSORO
OC
SWITCH WITH SWITCH LEG DESIGNATIONa
WALL MOUNTED RECTANGULAR LIGHT FIXTURE
(HATCHING INDICATES EMERGENCY FIXTURE)
PENDANT/SUSPENDED RECTANGULAR LIGHT FIXTURE
(HATCHING INDICATES EMERGENCY FIXTURE)
OC
c
LIGHTING LEGEND
NOT ALL SYMBOLS USED
EXISTING WORK TO REMAIN
EXISTING WORK TO BE REMOVED
NEW WORK
J
RACEWAY IN WALL OR ABOVE CEILING
RACEWAY IN OR BELOW FLOOR
DISCONNECT SWITCH
JUNCTION BOX - WALL / FLOOR / CEILING MOUNTED
DUPLEX RECEPTACLE -
WALL / FLOOR / CEILING MOUNTED
QUADRAPLEX RECEPTACLE -
WALL / FLOOR / CEILING MOUNTED
MOTOR CONNECTION
SPECIAL RECEPTACLE
(NUMBER DENOTES AMPERAGE RATING)
480V PANELBOARD
208V PANELBOARD
DISTRIBUTION PANELBOARD
DRY-TYPE TRANSFORMER
NOT ALL SYMBOLS USED
J
FUSED DISCONNECT SWITCH
VARIABLE FREQUENCY DRIVE (VFD)
POWER LEGEND
EXISTING WORK TO REMAIN
EXISTING WORK TO BE REMOVED
NEW WORK
J
NOT-IN-SCOPE AREA
NOT-IN-SCOPE AREA
SAMPLE TAG: 60/2/50AF
60 = 60A; 2 = 2 POLES;
50AF = 50A FUSE
(NF = NON-FUSED DISC)
1. ALL WORK SHALL BE PERFORMED DURING PRE-APPROVED SERVICE WINDOWS WHEN
CAMPUS CLASSES ARE NOT IN SESSION. COORDINATE WORK WINDOW DATES WITH
BOTH COLLIN COLLEGE AND MCKINNEY CAMPUS FACILITIES GROUPS PRIOR TO
STARTING WORK.
2. ALL WORK SHALL BE COMPLETED AND FULLY COMMISSIONED PRIOR TO THE END OF
THE SERVICE WINDOW.
WORK DURING APPROVED WORK WINDOW:
1. THE SYSTEM SHALL BE FULLY COMMISSIONED BY THE CONTRACTOR AND THE
ELECTRICAL DISTRIBUTION MANUFACTURER AT THE END OF THE PROJECT TO
ENSURE THAT THE NEW SWITCHBOARDS, PANELBOARDS, AND POWER MONITORING
SYSTEM ARE IN FULL WORKING ORDER.
2. ALL TESTING AND METHODS OF PROCEDURE (MOPS) SHALL BE CREATED BY THE
CONTRACTOR AND SHALL BE APPROVED BY THE COLLIN COLLEGE AND THE
ENGINEER.
SYSTEM COMMISSIONING:
AVAILABLE FAULT CURRENT TAG (AMPERES)
FEEDER KEY TAG (REFER TO SCHEDULE)
PANELBOARD | DISTRIBUTION PANEL
ELECTRICAL EQUIPMENT ENCLOSURE
CIRCUIT BREAKER
ENCLOSED CIRCUIT BREAKER
AUTOMATIC TRANSFER SWITCH (ATS)
GENERATOR
GROUND
FUSE
SWITCH / DISCONNECT
FUSED SWITCH / DISCONNECT
MOTOR SWITCH / STARTER
VARIABLE FREQUENCY DRIVE SWITCH
TRANSFORMER
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
TRANSFORMER DELTA
TRANSFORMER WYE
EQUIPMENT LOAD
EQUIPMENT LOAD: RESISTIVE ONLY
EQUIPMENT MOTOR
GENERIC METER AND SUBCATEGORY
AMPERAGE / POWER / VOLTAGE METER
SURGE PROTECTION DEVICE
UTILITY SERVICE
WIRE CONTINUATION
TERMINAL
12,345
100.4C
X
NOT ALL SYMBOLS USED
ONE-LINE DIAGRAM LEGEND
ELEVATOR DISCONNECT
WIRE CONTINUATION CONNECTION GUIDE
DIGITAL POWER METER, BACNET COMPATIBLE
1. ELECTRICAL CONTRACTOR SHALL IDENTIFY ALL CIRCUITS, SPACES, AND SPARES
SERVED FROM ALL DISTRIBUTION EQUIPMENT WITHIN THE SCOPE OF THE PROJECT.
TRACE EXISTING FEEDERS AND BRANCH CIRCUITS. PROVIDE PANELBOARDS WITH A
TYPEWRITTEN CIRCUIT DIRECTORY DESCRIBING THE NAME OF THE LOAD AND THE
ROOM NUMBER WHERE THE LOAD IS LOCATED. PROVIDE DIGITAL COPIES OF CIRCUIT
DIRECTORIES IN EXCEL (.XLSX) FORMAT. PROVIDE DISTRIBUTION PANELBOARDS WITH
PLACARDS ADJACENT TO EACH BRANCH CIRCUIT BREAKER DESCRIBING THE LOAD
AND ITS LOCATION. REFER TO OTHER GENERAL NOTES ON THIS SHEET FOR
ADDITIONAL INFORMATION.
2. DISTRIBUTION EQUIPMENT WITHIN BASE PROJECT SCOPE: 'LS', 'L1E', 'L1EA', 'HS', AND
'H1E', AND SWITCHBOARD 'MSA'.
3. DISTRIBUTION EQUIPMENT WITHIN ALTERNATE 1 PROJECT SCOPE: '1H', '1L', '2H', '2L', '2LC', '2LN', '2LN2', '2PN', '3LN', '3PN', 'CP', 'DPHE', 'DPHW', 'DPLA', 'DW3', 'H1W', 'H2E', 'H2W', 'H3E', 'H3W', 'H4E', 'H4W', 'HE', 'H-LAB', 'HSA', 'HSB1', 'HSB2', 'K', 'K1', 'K2' (AKA 'PN'), 'KH', 'KL', 'L1A', 'L1A2', 'L1W', 'L1WA', 'L1WB', 'L2E', 'L2EA', 'L2W', 'L2WA', 'L2WB', 'L2WC', 'L2WD', 'L2WE', 'L3E', 'L3EA', 'L3W', 'L3W1', 'L3W2', 'L3WA', 'L3WB', 'L3WC', 'L3WD', 'LB2', 'LB3', 'LCR', 'LCRA', 'LIDA', 'LIDB', 'LK', 'LKS', 'LN', 'LN2', 'LN3', 'LN4', 'LSA', 'LSB1', 'LSB2', 'MCC-2N', 'MCC-PN', 'MDPS', 'MSB', 'PLN', AND 'UNNAMED' (ROOM C225).
4. REFER TO ELECTRICAL DISTRIBUTION SCHEDULE ON THIS SHEET FOR ADDITIONAL
INFORMATION ON EACH PANEL LISTED ABOVE.
TRACING OF EXISTING FEEDERS AND
BRANCH CIRCUITS:
THE FOLLOWING CODES HAVE BEEN ADOPTED BY THE CITY OF MCKINNEY:
• 2026 NATIONAL ELECTRICAL CODE
• 2024 INTERNATIONAL ENERGY CONSERVATION CODE
RELEVANT ADOPTED CODES:
RECORDED MAXIMUM EXISTING DEMAND LOAD
ADJUSTMENT FACTOR PER NEC 220.87 (x125%)
TOTAL REMOVED LOAD
TOTAL ADDED LOAD
NET TOTAL
KVA AMP
991.88
991.88
1,193
1,193
VOLTAGE: 480 V PHASE: 3-PH
793.50
0.00
0.00
LOAD CALCULATION SUMMARY: 'MSB'
RATING: 4000 A
B-4
HOMERUN : PANEL NAME-CIRCUIT NUMBER(S).
THE WORD "ON" IS ADDED WHEN THE CIRCUIT FEEDING
CONTENTS FROM THIS HOMERUN ALSO FEEDS CONTENT
ELSEWHERE
REFER TO THE FOLLOWING AND ENSURE THE CAMPUS NETWORK OPERATIONS CENTER
(NOC) AND ASSOCIATED COOLING EQUIPMENT REMAIN OPERATIONAL THROUGHOUT THE
DURATION OF THE PROJECT, INCLUDING DURING THE REPLACEMENT OF THE MAIN
SERVICE ENTRANCE SWITCHBOARD:
PLANNING & COORDINATION:
1. DRAFT A DETAILED METHOD OF PROCEDURE (MOP) EXPLAINING HOW THE NOC WILL
REMAIN POWERED.
2. REVIEW THE MOP AND SCHEDULE ALL SERVICE SHUTDOWNS WITH THE COLLEGE FOR
APPROVAL.
3. CONFIRM WHETHER THE EXISTING GENERATOR OR A TEMPORARY FEEDER FROM
PANEL H1B (AT WELCOME CENTER) WILL BE USED.
A. REFER TO SITE PLAN ON SHEET E1.01 FOR INFORMATION ON THE LOCATION OF
THE EQUIPMENT NOTED ABOVE.
IMPLEMENTATION & TRANSITION:
1. ROUTE AND CONNECT TEMPORARY CABLES FROM THE SELECTED SOURCE TO THE
NOC AND COOLING EQUIPMENT AS NEEDED. NOTE THAT THE GENERATOR IS ALREADY
CONNECTED TO PANEL 'LCR' IN THE NOC SPACE. REFER TO ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
2. SAFELY SWITCH THE NOC AND ITS COOLING SYSTEMS OVER TO THE TEMPORARY
POWER SOURCE.
3. CONFIRM THE COOLING UNITS AND NOC ARE RUNNING STABLY BEFORE PROCEEDING.
SWITCHBOARD REPLACEMENT & RESTORATION:
1. SHUT DOWN, REMOVE, AND REPLACE THE MAIN SERVICE ENTRANCE SWITCHBOARD.
2. POWER UP THE NEW SWITCHBOARD AND TEST IT UNDER LOAD.
3. SWITCH THE NOC AND COOLING EQUIPMENT BACK TO THE PERMANENT MAIN SYSTEM
AND REMOVE ALL TEMPORARY GEAR.
NETWORK OPERATIONS CENTER POWER:
GENERAL
1. CONTRACTOR SHALL COORDINATE ALL WORK WITH OWNER, ENGINEER, AND SERVING
UTILITY. PERFORM WORK DURING APPROVED SERVICE WINDOWS AND MAINTAIN
NETWORK OPERATIONS CENTER (NOC) OPERATION THROUGHOUT THE UTILITY
SHUTDOWN. CONTRACTOR SHALL SEQUENCE THE WORK IN SUCH A WAY AS TO
MINIMIZE THE UTILITY SERVICE INTERRUPTION.
2. FOR EACH SCOPE OF WORK, CONTRACTOR SHALL PROVIDE A METHOD OF
PROCEDURE (MOP) FOR REVIEW AT LEAST ONE MONTH BEFORE THE PROPOSED
SHUTDOWN WINDOWS. THE OWNER MUST APPROVE ALL SHUTDOWNS AT LEAST TWO
WEEKS IN ADVANCE OF THE PROPOSED SHUTDOWN WINDOW.
PHASE 1: PRE-CONSTRUCTION ALTERNATE WORK
1. IF ALTERNATE #1 BID IS AWARDED, COMPLETE THIS WORK BEFORE THE MAIN
ELECTRICAL ROOM SHUTDOWN SEQUENCE.
PHASE 2: NOC POWER SECURING AND REDUNDANCY
1. ENSURE THAT ALL CRITICAL NOC EQUIPMENT IS CIRCUITED TO ELECTRICAL PANELS
PROVIDED WITH STANDBY GENERATOR POWER. THIS SHOULD INCLUDE ALL
TECHNICAL POWER AND HVAC EQUIPMENT REQUIRED TO OPERATE THE NOC.
2. PROVIDE, TEST, AND COMMISSION NEW GENERATOR DOCKING STATIONS AT EXISTING
GENERATOR. ENSURE LEAD TIME FOR GENERATOR DOCKING STATIONS DO NOT
CONFLICT WITH MAIN ELECTRICAL ROOM SHUTDOWN SEQUENCE.
3. COORDINATE WITH FACILITY’S NOC PERSONNEL TO TRANSFER NOC LOADS TO
EXISTING GENERATOR.
4. PROVIDE TEMPORARY SOURCE OF EMERGENCY POWER DURING TIME WHEN
EXISTING GENERATOR IS DISCONNECTED AND OFFLINE.
PHASE 3: PRE-SHUTDOWN WORK
1. VERIFY GENERATOR DOCKING STATION COMPATIBILITY WITH TEMPORARY
GENERATOR CONNECTION.
2. VERIFY NOC EMERGENCY POWER OPERATION. FUEL AND MAINTAIN EXISTING
GENERATOR FOR THE ENTIRE ANTICIPATED SHUTDOWN. ESTABLISH PROCEDURES
FOR IMMEDIATE CONNECTION OF TEMPORARY GENERATOR THROUGH DOCKING
STATION IF EXISTING GENERATOR BECOMES UNAVAILABLE. REFER TO “NETWORK
OPERATIONS CENTER POWER” NOTES ABOVE FOR ADDITIONAL INFORMATION.
3. COORDINATE UTILITY SHUTDOWN AND OBTAIN REQUIRED OWNER, UTILITY, AND
OTHER APPLICABLE APPROVALS. ANTICIPATED MAJOR UTILITY SHUTDOWN IS
EXPECTED AT A POINT DURING THE COLLIN COLLEGE MCKINNEY CAMPUS 2027
SUMMER BREAK.
4. DURING PRE-APPROVED AFTER HOURS AND/OR WEEKEND SHUTDOWNS, COMPLETE
ALL WORK THAT CAN BE PERFORMED WITHOUT UTILITY SERVICE INTERRUPTION,
INCLUDING:
A. ISOLATE AND LOCK-OUT/TAG-OUT DISCONNECTS ON SWITCHBOARD ‘MSA’
FEEDING EXISTING EQUIPMENT TO BE REMOVED.
B. REMOVE EXISTING PANELBOARDS, TRANSFORMERS, WALL-MOUNTED EQUIPMENT,
AND WIREWAYS.
C. IDENTIFY, LABEL, AND PROTECT EXISTING FEEDERS AND BRANCH-CIRCUIT
CONDUCTORS TO BE REUSED.
D. COMPLETE ACCESSIBLE CRAWLSPACE FEEDER MODIFICATIONS AND REMOVE
FEEDER DESIGNATED FOR COMPLETE REMOVAL.
E. REMOVE EXISTING DOOR AND DOOR FRAME.
F. EXPAND MASONRY OPENING AND INSTALL NEW DOUBLE-DOOR FRAME AND DOOR
LEAVES, INCLUDING NEW CARD READER AND ACCESS-CONTROL WIRING.
G. ACCESS CRAWLSPACE TO PRE-INSTALL NEW PULL BOXES, ROUTE CONDUIT
ADDITIONS, AND PREP UNDERGROUND FEEDERS FOR SHIFTING.
H. PREPARE FEEDER ROUTES, JUNCTION BOXES, WIREWAYS, AND OTHER
INFRASTRUCTURE INSIDE ROOM B102 THAT CAN BE COMPLETED BEFORE
SHUTDOWN.
I. PREPARE ACTIVE NEGATIVE-PRESSURE HEPA FILTRATION AND EXHAUST
VENTILATION OUT OF BUILDING FOR UPCOMING CONCRETE POUR AND CURING
TIMEFRAME.
PHASE 4: UTILITY SHUTDOWN — CRITICAL PATH
1. DO NOT BEGIN UTILITY SHUTDOWN UNTIL:
A. NEW SWITCHBOARD AND ALL COMPONENTS REQUIRED FOR RESTORATION ARE
ON SITE, COMPLETE, AND VERIFIED READY FOR INSTALLATION.
B. REQUIRED MATERIALS AND MANPOWER ARE AVAILABLE.
C. NOC GENERATOR/DOCKING STATION ARE OPERATIONAL.
D. DOOR REPLACEMENT IS COMPLETE.
E. CONTRACTOR HAS DEMONSTRATED READINESS TO PROCEED CONTINUOUSLY
THROUGH RESTORATION OF UTILITY SERVICE.
2. TRANSFER NOC LOADS TO GENERATOR. VERIFY NOC EQUIPMENT AND COOLING
SYSTEM ARE OPERATIONAL.
3. EXECUTE UTILITY SOURCE LOCK-OUT/TAG-OUT TO COMPLETELY DE-ENERGIZE AND
ISOLATE THE INCOMING SERVICE. VERIFY ABSENCE OF VOLTAGE.
4. DISCONNECT, LABEL, AND PROTECT EXISTING SERVICE FEEDERS, GROUNDING
ELECTRODE CONDUCTORS, AND FEEDERS SERVING EQUIPMENT TO REMAIN.
5. SECTIONALIZE, RIG OUT, AND REMOVE THE EXISTING SERVICE ENTRANCE
SWITCHBOARD AND ‘MSA’ SWITCHBOARD.
6. REMOVE EXISTING CONCRETE EQUIPMENT PADS AND PROTECT EXISTING
CONDUIT/STUB-UPS TO REMAIN.
7. COMPLETE REQUIRED FLOOR/DECK CORE DRILLING, BOTTOM-ENTRY FEEDER STUB-
UPS, AND RELATED MODIFICATIONS.
8. DEPLOY ACTIVE NEGATIVE-PRESSURE HEPA FILTRATION AND EXHAUST VENTILATION
OUT OF BUILDING.
9. INSTALL NEW EQUIPMENT CONCRETE PAD. PROVIDE RAPID-STRENGTH CONCRETE OR
OTHER APPROVED METHOD CAPABLE OF ACHIEVING REQUIRED INSTALLATION
STRENGTH WITHIN THE APPROVED SHUTDOWN SCHEDULE. DO NOT INSTALL
SWITCHBOARD UNTIL REQUIRED CONCRETE STRENGTH HAS BEEN ACHIEVED.
10. INSTALL AND ANCHOR NEW MAIN SERVICE ENTRANCE SWITCHBOARD ‘SB-MAIN’.
ENSURE EACH ENCLOSURE SECTION APPROPRIATELY ALIGNS WITH BOTTOM-ENTRY
FEEDER STUB-UPS.
11. INSPECT EXISTING CONDUCTORS FOR SERVICE FEEDER AND ‘MSB’ FEEDER AND
EXTEND CONDUCTORS VIA COMPRESSION BARRELS AND HEAT-SHRINK IF REQUIRED.
12. CONNECT EXISTING SERVICE FEEDER CONDUCTORS AND ‘MSB’ FEEDER
CONDUCTORS.
13. CONNECT GROUNDING ELECTRODE CONDUCTORS AND REMAINING
FEEDER/RACEWAY CONNECTIONS.
14. COMPLETE REQUIRED TESTING, INSPECTIONS, AND UTILITY APPROVAL.
15. REMOVE UTILITY SOURCE LOCK-OUT/TAG-OUT AND RESTORE UTILITY SERVICE AS
SOON AS NEW SERVICE EQUIPMENT IS READY FOR ENERGIZATION.
16. VERIFY VOLTAGE, PHASE ROTATION, GROUNDING, AND NORMAL SWITCHBOARD
OPERATION.
PHASE 5: POST-SHUTDOWN AND FACILITY INTEGRATION WORK
1. INSTALL NEW TRANSFORMER RACKS AND TRANSFORMERS.
2. INSTALL NEW PANELBOARDS AND RECONNECT/EXTEND EXISTING BRANCH CIRCUITS
AND FEEDERS. MATCH CIRCUIT NUMBERS AND BREAKER SIZES/TYPES AS REQUIRED.
REFER TO ALTERNATE 1 WORK, IF AWARDED.
3. INSTALL NEW WIREWAYS, JUNCTION BOXES, FEEDER CONNECTIONS, WALL-MOUNTED
EQUIPMENT, LIGHTING FIXTURES, DPM/BMS CONNECTION, AND OTHER DEVICES.
4. COMPLETE ELECTRICAL TESTING AND COMMISSIONING.
5. VERIFY NOC NORMAL/EMERGENCY POWER OPERATION AND GENERATOR DOCKING
STATION OPERATION.
6. TRANSFER NOC LOADS TO NORMAL SOURCE. VERIFY NOC EQUIPMENT AND COOLING
SYSTEM ARE OPERATIONAL.
PHASE 6: FINISHING WORK
1. COMPLETE WALL PATCHING, FLOOR REPAIRS, PAINTING, DOOR/ACCESS-CONTROL
FINISH WORK, CLEANING, AND OTHER RESTORATION.
CRITICAL REQUIREMENTS
1. UTILITY SHUTDOWN SHALL BE LIMITED TO THE MINIMUM DURATION NECESSARY TO
REMOVE EXISTING SERVICE EQUIPMENT, REPLACE THE EQUIPMENT PADS, INSTALL
AND CONNECT THE NEW SERVICE ENTRANCE SWITCHBOARD ‘SB-MAIN’, COMPLETE
REQUIRED TESTING/INSPECTION, AND RESTORE UTILITY SERVICE.
2. DO NOT EXTEND THE UTILITY SHUTDOWN SOLELY TO COMPLETE DOWNSTREAM
PANEL, TRANSFORMER, BRANCH-CIRCUIT, DEVICE, OR FINISH WORK THAT CAN
SAFELY PROCEED AFTER UTILITY SERVICE IS RESTORED.
3. MAINTAIN NOC ENERGIZED CONTINUOUSLY THROUGHOUT THE SHUTDOWN. MAINTAIN
GENERATOR FUEL AND PERSONNEL/EQUIPMENT NECESSARY TO RESPOND TO
GENERATOR FAILURE.
4. ANY CONDITION THAT MAY DELAY UTILITY RESTORATION SHALL BE IMMEDIATELY
REPORTED TO OWNER AND ENGINEER.
PROPOSED SEQUENCE OF CONSTRUCTION:
ALTERNATE #1:
UNDER ALTERNATE #1, PROVIDE THE FOLLOWING THROUGHOUT THE FULL BUILDING, UP
TO BUT NOT INCLUDING THE PARKING GARAGE BUILDING, ON ALL EXISTING PANELS AND
SWITCHBOARDS:
A. TRACE AND IDENTIFY ALL BUILDING BRANCH CIRCUITS AND FEEDERS.
B. PROVIDE UPDATED PANEL SCHEDULES.
C. CHECK AND RE-TORQUE ALL CIRCUIT AND FEEDER TERMINATIONS IN ACCORDANCE
WITH MANUFACTURER-RECOMMENDED VALUES.
ALTERNATES:
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E0.01
GENERAL NOTES &
LEGENDS -
ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
ES
26126-00
2026.10.06
ELECTRICAL DISTRIBUTION SCHEDULE
EQUIPMENT
TYPE PANEL NAME SECTIONS # OF SPACES LOCATION
I-Line Panelboard DPHW 1 PENTHOUSE AREA A
I-Line Panelboard DPHE 1 PENTHOUSE AREA B
Panelboard CP 1 24 A102
Panelboard H1W 2 84 A102
Panelboard L1W 1 24 A102
Panelboard L1WA 1 36 A102
Panelboard LCR 1 24 A111
Panelboard LCRA 1 24 A111
Panelboard LIDA 1 42 A116H
Panelboard LIDB 1 42 A116H
Panelboard L1A 1 84 A116M
Panelboard L1A2 1 30 A116M
Panelboard L2WE 1 26 A203B
Panelboard L2WC 1 26 A208A
Panelboard DW3 2 84 A306A
Panelboard L3WD 1 42 A306A
Panelboard L3WB 1 42 A311
Panelboard L3WC 1 42 A311D
Panelboard ECB 1 84 B102
Panelboard H1E 2 18 B102
Panelboard HS 1 42 B102
Panelboard L1E 1 42 B102
Panelboard L1EA 1 18 B102
Panelboard LS 1 42 B102
Panelboard HE 1 42 B103A
Panelboard H2E 2 60 B202
Panelboard H2W 2 60 B202
Panelboard L2E 1 24 B202
Panelboard L2EA 1 36 B202
Panelboard L2W 1 24 B202
Panelboard L2WA 1 36 B202
Panelboard LB2 2 84 B213
Panelboard H3E 2 84 B303
Panelboard H3W 2 56 B303
Panelboard L3E 1 24 B303
Panelboard L3EA 1 30 B303
Panelboard L3W 1 42 B303
Panelboard L3WA 1 42 B303
Panelboard L3W2 2 42 B303B
Panelboard LB3 2 42 B303B
Panelboard K 1 42 C112E
Panelboard K1 1 24 C112E
Panelboard K2 (PN) 1 36 C112E
Panelboard KH 1 18 C112E
Panelboard KL 1 30 C112E
Panelboard LN 1 42 C113
Panelboard LN2 1 42 C113
Panelboard LN3 1 24 C113
Panelboard LN4 1 30 C113
Panelboard LK 1 84 C117G
Panelboard LKS 1 42 C117G
Panelboard HSA 2 84 C117I
Panelboard LSA 2 84 C117I
Panelboard HSB1 1 42 C122G
Panelboard HSB2 1 42 C122G
Panelboard LSB1 2 84 C122G
Panelboard LSB2 1 42 C122G
Panelboard 1H 1 42 C128
Panelboard 1L 2 84 C128
Panelboard 2LN 1 42 C213
Panelboard 2LN2 1 18 C213
Panelboard 2PN 1 24 C213
Panelboard UNNAMED 1 20 C225
Panelboard 2H-old 1 42 C238
Panelboard 2L 2 84 C238
Panelboard 2LC 1 42 C238
Panelboard 3LN 1 42 C315
Panelboard 3PN 1 24 C315
Panelboard CONTROL PANEL 1 42 C315
Panelboard L3W1 3 126 C315
Panelboard H-LAB 1 42 C316
Panelboard H4W 1 24 PENTHOUSE AREA A
Panelboard H4E 1 24 PENTHOUSE AREA B
Panelboard PLN 1 18 PENTHOUSE AREA D
Switchboard DPLA 1 A102
Switchboard MAIN-A 1 B102
Switchboard MAIN-B 1 B102
Switchboard MSA 1 B102
Switchboard SERVICE ENTRANCE 1 B102
Switchboard SWBD 2000A 1 B102
Switchboard MSB 1 C112E
Switchboard MDPS 1 C117I
Switchboard MCC-2N 1 C220
Switchboard MCC-PN 1 PENTHOUSE AREA D
SCHEDULE REMARKS
1. REFER TO SHEETS E2.01 AND E2.02 FOR ROOM LOCATIONS ON FLOOR PLANS.
2026 / 10 / 06
NOPARKING
NOPARKING
(E ) 'G
E N -C
EXISTING ELECTRICAL
UTILITY TRANSFORMER
EXISTING
GENERATOR
(E) 'UTIL
XFMR'
APPROXIMATE LOCATION OF EXISTING
PANEL 'H1B' LOCATED IN THE FIRST
FLOOR SOUTH ELECTRICAL ROOM IN
THE WELCOME CENTER BUILDING.
CAMPUS NOC IN
SERVER ROOM A111
REFER TO SHEET (VIEW 1)
EXISTING DISTRIBUTION EQUIPMENT
SERVING CAMPUS NOC
IN ELECTRICAL ROOM B103A
REFER TO SHEET (VIEW 1)
EXISTING MAIN SERVICE ENTRANCE
SWITCHBOARD IN ELECTRICAL ROOM B102
REFER TO SHEET (VIEW 1)
E2.01
E2.01
E2.01
E1.01
1. REFER TO SHEET FOR ELECTRICAL LEGEND AND GENERAL PROJECT
ELECTRICAL NOTES.
2. ALL UNDERGROUND AND ABOVE GRADE ELECTRICAL INSTALLATIONS SHOWN
ON THE SITE SHALL BE WEATHERPROOF.
3. ALL EXISTING SITE UTILITIES SHALL BE FLAGGED AND MARKED PRIOR TO
CONSTRUCTION. THESE FLAGS SHALL BE MAINTAINED THROUGHOUT
CONSTRUCTION. ALL UTILITIES ARE TO REMAIN ACTIVE UNLESS NOTED
OTHERWISE IN THE CONSTRUCTION DOCUMENTS.
4. REFER TO PROPOSED SEQUENCE OF WORK ON SHEET .
GENERAL SHEET NOTES:
E0.01
E0.01
COLLIN COLLEGE ACCOUNT MANAGER:
BRIAN GUEST
BRIAN.GUEST@ONCOR.COM
817-980-8920
ONCOR CONTACT:
'GDS400'
'GDS100'
(E) 'GEN-C'
EXISTING
GENERATOR
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E1.01
SITE PLAN -
ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
2026-10-06
ES
26126-00
TRUE
NORTH
PLAN
NORTH
SCALE: 1" = 30'-0"
SITE PLAN - ELECTRICAL1
◯ NOTES BY SYMBOL ' ':
1 THE CAMPUS NETWORK OPERATIONS CENTER (NOC) AND ASSOCIATED
COOLING EQUIPMENT SHALL BE OPERATIONAL THROUGHOUT THE DURATION
OF THE PROJECT, INCLUDING DURING THE REPLACEMENT OF THE MAIN
SERVICE ENTRANCE SWITCHBOARD. REFER TO NOTES ON THE NOC POWER
ON SHEET E0.01 FOR ADDITIONAL INFORMATION.
2 PROVIDE NEW GENERATOR DOCKING STATION. COORDINATE FINAL
INSTALLATION LOCATION ON THE FIELD WITH THE OWNER, TO ENSURE
PROPER EXISTING FEEDER INTERCEPTION. MAINTAIN ALL REQUIRED WORKING
SPACE CLEARANCES, PER NEC. REFER TO ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
TRUE
NORTH
PLAN
NORTH
SCALE: 1/8" = 1'-0"
ENLARGED SITE PLAN - GENERATOR2
C.J.
C.J.
C.J.
C.J.
C.J.
E4.01
A
B103A
A102
C128
C122G
C
2E
C
C
7I
C
7G
A
6H
A
6M
(E) UTILITY
TRANSFORMER
(E) GENERATOR
CAMPUS NETWORK
OPERATIONS CENTER (NOC)
E4.01
E4.01
E4.01
A103
(E) 'L1WA'
(E) 'LCR'
A
8A A
3B
B213
A201
B202
C238
C
C
C
1. REFER TO SHEET FOR ELECTRICAL LEGEND, AND GENERAL PROJECT
POWER NOTES.
2. REFER TO SHEET FOR ELECTRICAL ONE-LINE DIAGRAMS.
3. REFER TO SHEET FOR ELECTRICAL PANEL SCHEDULES.
4. REFER TO ELECTRICAL DISTRIBUTION SCHEDULE ON SHEET FOR A LIST
OF PANELS AND SWITCHBOARDS IN EACH ROOM.
GENERAL SHEET NOTES:
E0.01
E6.01
E7.01
E0.01
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E2.01
OVERALL FLOOR
PLAN - LEVELS 1 & 2 -
ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
2026-10-06
ES
26126-00
TRUE
NORTH
PLAN
NORTH
SCALE: 1" = 30'-0"
OVERALL FLOOR PLAN - LEVEL 1 - ELECTRICAL1
TRUE
NORTH
PLAN
NORTH
SCALE: 1" = 30'-0"
OVERALL FLOOR PLAN - LEVEL 2 - ELECTRICAL2
NO SCOPE OF WORK ON THIS VIEW.
VIEW PROVIDED TO DEPICT LOCATIONS OF EXISTING ELECTRICAL EQUIPMENT.
HW
ROO
F P
EN
TH
OU
SE
C
A
1D
A
6A
B303 B
B303
A301
C
C
P
EN
TH
O U S E
AR
E A D
P E N
TH
O
U S E
A R
E A A
PENTH
O
USE
AREA B
1. REFER TO SHEET FOR ELECTRICAL LEGEND, AND GENERAL PROJECT
POWER NOTES.
2. REFER TO SHEET FOR ELECTRICAL ONE-LINE DIAGRAMS.
3. REFER TO SHEET FOR ELECTRICAL PANEL SCHEDULES.
4. REFER TO ELECTRICAL DISTRIBUTION SCHEDULE ON SHEET FOR A LIST
OF PANELS AND SWITCHBOARDS IN EACH ROOM.
GENERAL SHEET NOTES:
E0.01
E6.01
E7.01
E0.01
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E2.02
OVERALL FLOOR
PLAN - LEVELS 3 &
ROOF - ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
2026-10-06
ES
26126-00
TRUE
NORTH
PLAN
NORTH
SCALE: 1" = 30'-0"
OVERALL FLOOR PLAN - LEVEL 3 - ELECTRICAL1
TRUE
NORTH
PLAN
NORTH
SCALE: 1" = 30'-0"
OVERALL FLOOR PLAN - ROOF LEVEL - ELECTRICAL2
NO SCOPE OF WORK ON THIS VIEW.
VIEW PROVIDED TO DEPICT LOCATIONS OF EXISTING ELECTRICAL EQUIPMENT.
NO SCOPE OF WORK ON THIS VIEW.
VIEW PROVIDED TO DEPICT LOCATIONS OF EXISTING ELECTRICAL EQUIPMENT.
S P
D
S
J
S
S P
D
J
GENERAL SHEET NOTES:
1. REFER TO SHEET FOR ELECTRICAL LEGEND, GENERAL PROJECT POWER
NOTES, NOC POWER NOTES, AND PROPOSED SEQUENCE OF WORK NOTES.
2. REFER TO SHEET FOR ELECTRICAL DETAILS AND OTHER VIEWS AND
DIAGRAMS.
3. REFER TO SHEET FOR ELECTRICAL ONE-LINE DIAGRAMS.
4. REFER TO SHEET FOR ELECTRICAL PANEL SCHEDULES.
5. INSTALL ALL ELECTRICAL EQUIPMENT WITH CODE-COMPLIANT WORKING
CLEARANCE SPACES. REFER TO "WORKING SPACES" TABLE 110.26(A)(1) ON
2026 NFPA 70 (NEC).
6. INVESTIGATIVE PHASE, PRIOR TO START OF CONSTRUCTION:
A. COORDINATE WITH COLLEGE FOR A SHORT WEEKEND SHUTDOWN TO
OPEN THE FRONT COVERS OF THE SWITCHBOARDS AND PANELBOARDS
TO INVESTIGATE AND DOCUMENT EXISTING CONDITIONS, SUCH AS
FEEDER SIZES AND SPARE CIRCUIT BREAKERS.
B. INVESTIGATE AND DOCUMENT CURRENT USAGE FOR EACH CONTROLLER
BOX, TIME-CLOCK, AND DISCONNECT CURRENTLY MOUNTED UNDER
PANELS 'LS', 'HS', AND 'L1E'. MARK ANY UNUSED OR DISCONNECTED ITEMS
FOR REMOVAL.
E0.01
E6.01
E7.01
E5.01
'L1E'
'H 1E
'H S'
'L S'
'TLS'
'TL1E'
WIREWAY
'S B
-M A
IN
MGB
3 4
HS-1
L1WA-37
G
FI
'MSA'
'TL1E
'TLS
'L S'
'H S'
'L 1E
'H 1E
'L
1EA'
'S E
R V
IC
E
E N
T R
A N
C E
'M
A
IN
-B
'M A
IN
-A
WIREWAY
WIREWAY
ECB
'M A
IN
-B
'S
E R
V
IC
E E
N T
R A
N C
E
'M A
IN
-A
'MSA'
'L S'
'H S'
'L 1E
'H 1E
'L
1EA'
BURIED (5) 4" C
TO 'MSB' (C112E)
(2 ) 3
" C
TO
'2
H' ( C
8)
BURIED (10) 4" C
FROM UTILITY
TRANSFORMER (1) 1.5" C (PVC)
(1) 1" C (PVC)
(1) 2" C
(1) 1.5" C - TO ELEVATORS (A103)
(1) 2.5" C - TO 'H1W' (A102)
(1) 1" C
(1) MC CABLE
(1) 1.5" C
(1) 3/4" C
'L1E'
'H 1E
'H
S'
'L S'
'TLS'
'TL1E'
'S B
-M A
IN
BURIED (5) 4" C
TO 'MSB' (C112E)
BURIED (10) 4" C
FROM UTILITY
TRANSFORMER
(1) 1.5" C (PVC)
(1) 1" C (PVC)
(1) 1" C
(1) MC CABLE
(1) 2" C
(1) 1.5" C - TO ELEVATORS (A103)
(1) 2.5" C - TO 'H1W' (A102)
(2 ) 3
" C
TO
'2
H' ( C
8)
WIREWAY
9 (1) 1.5" C
(1) 3/4" C
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E4.01
ENLARGED PLANS -
ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
ES
26126-00
2026.10.06
◯ NOTES BY SYMBOL ' ':
1 PROVIDE NEW SERVICE ENTRANCE SWITCHBOARD PER MAXIMUM DIMENSIONS
SHOWN ON PLANS. ENSURE 4000A SERVICE FEEDER SECTION FITS OVER
EXISTING SERVICE FEEDERS. EXTEND AS NECESSARY AND CONNECT
EXISTING SERVICE FEEDERS. EXTEND AS NECESSARY AND RECONNECT
EXISTING GROUNDING ELECTRODE CONDUCTORS TO NEW GROUND BUS IN
THE ROOM, WITH MINIMUM EXTENSION WIRE SIZE OF #3/0.
2 PROVIDE NEW ELECTRICAL PANEL. EXTEND EXISTING BRANCH CIRCUITS AS
NECESSARY AND RE-TERMINATE TO NEW PANEL. MATCH CIRCUIT NUMBERS
AND CIRCUIT BREAKER SIZES AND TYPES FROM PREVIOUSLY REMOVED
PANEL. REWORK EXISTING WALL TO ACCOMMODATE NEW PANEL.
3 PROVIDE NEW WIREWAY TO ROUTE FEEDERS TO EXISTING FLOOR STUB-UPS
AS NEEDED.
4 CONNECT ALL CIRCUITS FROM PREVIOUSLY REMOVED PANEL 'L1EA' TO NEW
PANEL 'L1E'. EXTEND EXISTING BRANCH CIRCUITS AS NECESSARY. MATCH ALL
CIRCUIT BREAKER SIZES AND TYPES AS RECORDED PRIOR TO REMOVING
PANEL 'L1EA'.
5 CONNECT BOTH CIRCUITS FROM PREVIOUSLY REMOVED ENCLOSED CIRCUIT
BREAKER (ECB) TO PANEL 'LS'. EXTEND EXISTING BRANCH CIRCUITS AS
NECESSARY. MATCH ALL CIRCUIT BREAKER SIZES AND TYPES AS RECORDED
PRIOR TO REMOVING ECB.
6 PROVIDE NEW 6-FOOT DOUBLE DOOR. ENSURE DOOR SWINGS OUTWARDS TO
COMPLY WITH NEC WORKING SPACE AND LIFE SAFETY REQUIREMENTS.
PROVIDE PANIC DOOR HARDWARE. REFER TO ARCHITECTURAL DRAWINGS
FOR ADDITIONAL DOOR INFORMATION.
7 PROVIDE NEW EQUIPMENT CONCRETE PAD WITH CHAMFERED EDGE.
COORDINATE WITH SHOP DRAWINGS TO ENSURE CONCRETE PAD EXTENDS 6
INCHES BEYOND THE FRONT FACE OF EQUIPMENT ENCLOSURES.
8 INSTALL PREVIOUSLY REMOVED WALL-MOUNTED EQUIPMENT, PROVIDE NEW
WIREWAY AS NEEDED, AND CONNECT TO CIRCUITS MAINTAINED TO BE
REUSED, AFTER NEW DOOR HAS BEEN INSTALLED. DO NOT INSTALL CONTENT
PREVIOUSLY MARKED FOR REMOVAL DURING INVESTIGATIVE PHASE (SEE
GENERAL SHEET NOTE ABOVE). COORDINATE FINAL LOCATION WITH NEW
DOOR WIDTH.
9 PROVIDE JUNCTION BOX TO RECONNECT EXISTING FEEDERS. SIZE JUNTION
BOX PER NEC 314.28 REQUIREMENTS. SPLICE AND EXTEND EXISTING FEEDERS
AS NECCESARY AND CONNECT TO NEW CIRCUIT BREAKERS. MOUNT BOX TO
UNDERSIDE OF FIRST FLOOR DECK.
10 CORE THROUGH EXISTING DECK AND PROVIDE NEW STUB-UPS FOR EXISTING
CRAWLSPACE FEEDERS.
11 PROVIDE DATA OUTLET TO ALLOW DIGITAL POWER METER (DPM) DEVICE TO
COMMUNICATE AND INTERFACE WITH CAMPUS’ BUILDING MANAGEMENT
SYSTEM (BMS). REFER TO ONE-LINE FOR ADDITIONAL INFORMATION.
12 PROVIDE MAIN GROUND BAR WITH APPROPRIATE LENGTH TO CONNECT TO
ALL GROUNDING TERMINATIONS REQUIRED IN THIS SPACE, INCLUDING 10%
SPARE TERMINATION POINTS.
13 PATCH, REPAIR, AND PAINT ALL NEWLY EXPOSED WALL SPACES PRIOR TO
INSTALLATION OF NEW EQUIPMENT AND DEVICES TO MATCH SURROUNDING
WALLS.
14 REFER TO DEMOLITION NOTE ON THIS FEEDER. PROVIDE NEW FEEDER IF
REQUIRED.
15 PROVIDE NEW LINEAR SUSPENDED EMERGENCY LIGHT FIXTURE.
BASIS-OF-DESIGN: LITHONIA, CLX L48 4000LM SEF L/LENS MVOLT GZ10 40K
80CRI E10W WH. MOUNT BELOW ALL OVERHEAD CONDUITS, BUT NO LOWER
THAN 8 FEET ABOVE FINISHED FLOOR. CONNECT NEW LIGHT FIXTURES TO
EXISTING LIGHT SWITCH IN THE ROOM.
16 COORDINATE WITH SWITCHBOARD MANUFACTURER TO ENSURE ENCLOSURE
STUB-UPS FIT INTO SECTION'S BOTTOM OPENING.
17 EXISTING FIRE ALARM DEVICE. DEVICE SHALL REMAIN OPERATIONAL AND
PROTECTED FROM PHYSICAL DAMAGE THROUGHOUT CONSTRUCTION.
18 PROVIDE (1) FLUSH MOUNT DOUBLE GANG BOX WITH SINGLE GANG PLASTER
RING AND COVER PLATE FOR FUTURE CARD READER PROVIDED BY OTHERS.
MOUNT AT +36” AFF. PROVIDE 1" EMPTY CONDUIT WITH PULL STRING STUBBED
TO ACCESSIBLE LOCATION IN SECURE SIDE ABOVE CEILING.
DEMOLITION NOTES BY SYMBOL ' ':
1 REMOVE EXISTING SERVICE ENTRANCE SWITCHBOARD. DISCONNECT AND
PROTECT EXISTING MAIN SERVICE FEEDERS, FEEDERS FOR SWITCHBOARD
'MSB', AND EXISTING GROUNDING ELECTRODE CONDUCUTORS.
2 REMOVE EXISTING SWITCHBOARD 'MSA'. DISCONNECT, LABEL, AND PROTECT
EXISTING DOWNSTREAM BRANCH FEEDERS AND PREPARE THEM TO BE
MODIFIED FOR CONNECTION TO NEW EQUIPMENT.
3 REMOVE EXISTING ELECTRICAL PANEL. DISCONNECT AND PROTECT EXISTING
FEEDERS AND BRANCH CIRCUITS TO BE REUSED. PREPARE EXISTING
FEEDERS TO BE MODIFIED FOR CONNECTION TO NEW EQUIPMENT. LABEL
EXISTING BRANCH CIRCUIT CONDUCTORS WITH ASSOCIATED CIRCUIT
NUMBERS AND CIRCUIT BREAKER SIZES AND TYPES IN ORDER TO FACILITATE
THE MATCHING OF CIRCUIT NUMBERS INTO THE NEW PANEL.
4 NOTE THAT A NEW PANEL WILL NOT BE PROVIDED IN THE PLACE OF THIS
EQUIPMENT BEING REMOVED. REFER TO NEW PANEL SCHEDULES FOR
INFORMATION ON DESTINATION OF EXISTING BRANCH CIRCUITS TO BE
DISCONNECTED FROM THIS EQUIPMENT.
5 REMOVE EXISTING TRANSFORMER AND ABOVE-CEILING STRUCTURAL
SUPPORT.
6 REMOVE EXISTING CONCRETE EQUIPMENT PAD AND PROTECT EXISTING
CONDUIT FEEDER STUB UPS THAT ARE TO REMAIN.
7 REMOVE DOOR AND DOOR FRAME TO ALLOW ACCESS FOR EXISTING AND NEW
SWITCHBOARD IN AND OUT OF THE ROOM. PROVIDE TEMPORARY BARRIERS
AS NEEDED DURING CONSTRUCTION TO PREVENT THE PUBLIC FROM
ACCESSING THE ELECTRICAL ROOM. COORDINATE WITH DOOR INSTALLER TO
ENSURE EXISTING PANELBOARDS AND WALL-MOUNTED ELECTRICAL
EQUIPMENT NEAR EXISTING DOOR FRAME ARE REMOVED PRIOR TO WORK ON
NEW DOOR.
8 DISCONNECT, REMOVE, AND PROTECT EXISTING WALL-MOUNTED EQUIPMENT
TO MAKE SPACE FOR NEW DOOR AND PREPARE FOR RE-INSTALLATION.
MAINTAIN BRANCH CIRCUIT WIRES TO BE REUSED. DISCONNECT AND REMOVE
CONTENT MARKED FOR REMOVAL DURING INVESTIGATIVE PHASE (SEE
GENERAL SHEET NOTE ABOVE).
9 DISCONNECT AND PROTECT CRAWLSPACE FEEDER. FILL AND SEAL DECK
STUB-UP HOLE AND REPAIR FLOOR TO MATCH SURROUNDING CONDITIONS IN
ROOM B102.
10 DISCONNECT AND REMOVE CRAWLSPACE FEEDER. FILL AND SEAL DECK
STUB-UP HOLE AND REPAIR FLOOR TO MATCH SURROUNDING CONDITIONS IN
ROOM B102.
11 REMOVE EXISTING LIGHTING FIXTURES. REMOVE BRANCH CIRCUIT CONDUIT
AND CONDUCTORS BACK TO SOURCE.
12 FIELD-INVESTIGATE EXISTING FEEDER DESTINATION THEN COORDINATE WITH
COLLIN COLLEGE ELECTRICAL TEAM TO DETERMINE WHETHER FEEDER NEEDS
TO BE REPLACED OR SIMPLY REMOVED.
13 EXISTING CEILING-MOUNTED FIRE ALARM DEVICE TO REMAIN. PRIOR TO
CEILING REMOVAL, PROVIDE INDEPENDENT SUPPORT FOR DEVICE AND
ASSOCIATED CABLING FROM STRUCTURE ABOVE, MAINTAINING EXISTING
LOCATION AND HEIGHT. DEVICE SHALL REMAIN OPERATIONAL AND
PROTECTED FROM PHYSICAL DAMAGE THROUGHOUT CONSTRUCTION.
TRUE
NORTH
PLAN
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED NEW PLAN
RM B102 - ELECTRICAL3
TRUE
NORTH
PLAN
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED DEMO PLAN
RM B102 - ELECTRICAL1
TRUE
NORTH
PLAN
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED DEMO PLAN
RM B102 CRAWLSPACE - ELECTRICAL2
TRUE
NORTH
PLAN
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED NEW PLAN
RM B102 CRAWLSPACE - ELECTRICAL4
SWBD
'MSB-NAME'
TYP.
480Y/277V
PANEL
TYP.
208Y/120V
PANEL
PANEL 'L1A'
480Y/277V, 3PH
FROM H1A-1,3,5
EQUIPMENT NAME
EQUIPMENT TYPE
EQUIPMENT VOLTAGE
AND PHASE
EQUIPMENT SOURCE AND
SOURCE LOCATION
PHENOLIC NAMEPLATE
WITH 1/4" LETTERS
INSCRIBED AS INDICATED.
PROVIDE WHITE LABELS
WITH BLACK LETTERS
(PANELBOARD SAMPLE)
DETAIL NOTES:
1. PROVIDE EQUIPMENT LABEL AS DETAILED ABOVE FOR ALL
PANELBOARDS, SWITCHBOARDS, TRANSFORMERS, DISCONNECT
SWITCHES, VARIABLE FREQUENCY DRIVERS (VFD), ETC.
2. SERVICE ENTRANCE EQUIPMENT SHALL HAVE AVAILABLE FAULT
CURRENT VALUE LABELED, IN ADDITION TO THE THE
INFORMATION DETAILED ABOVE. ACQUIRE AVAILABLE FAULT
INFORMATION FROM ELECTRICAL UTILITY TO PERFORM
CALCULATIONS.
3. REFER TO SPECIFICATION SECTION 26 05 53 FOR ADDITIONAL
INFORMATION.
LOCKWASHER
(NEWTON P.N. 3015-8)
4"
NEWTON P.N. A-6056
2"
4"
9/16" DIA.
3/4"
1"
2-3/4" INSULATOR
(NEWTON P.N.
3061-4)
3/8" DIAMETER
5/8 - 11 x 1" H.H.C.S.
(NEWTON P.N. 3012-1)
AS R
EQUIR
ED
1/4'`NOTE: VERIFY ALL HEIGHTS WITH ARCHITECT
FINISHED FLOOR
DATA TERMINAL OUTLET
TELEPHONE OUTLET
RECEPTACLE
WALL SWITCH
DIMMER SWITCH
THERMOSTAT OR FIRE
ALARM PULL STATION
FIRE ALARM HORN/LIGHT
LOWEST OF 8" BELOW
FINISHED CEILING OR 80"
AFF
FINISHED CEILING
CLOCK HANGER OUTLET
A F
F
A
F F
1'-0'' BELOW FINISHED
CEILING (MOUNT 8'-0"
AFF FOR NO CEILING
OR SLOPED CEILING
CONDITION)
G
N
G
N
G G
N
20" CONCRETE ENCASED ELECTRODE
TRIAD GROUND RING.
10' GROUND RODS SHALL BE PLACED 30' APART
BOND TO BUILDING STRUCTURAL STEEL
BOND TO COLD WATER PIPE
LOCATE IN EACH IDF ROOM
'TGB''MGB'
DETAIL NOTES BY SYMBOL:
1. PROVIDE #3/0, BARE, TINNED COPPER.
2. PROVIDE #3/0 IN 3/4" PVC CONDUIT.
3. PROVIDE CONDUCTOR PER ONE-LINE DIAGRAM.
4. SIZE PER NEC TABLE 250.66. ROUTE TO NEAREST GROUND
BAR OR TO EFFECTIVELY GROUNDED STEEL STRUCTURE.
TYP ∆-Y
TRANSFORMER
LOCATE IN EACH ELEC ROOM
'GB'
DETAIL NOTES:
1. PROVIDE MINIMUM OF 12 INCHES CLEARANCE ABOVE LOWER TRANSFORMER.
2. PROVIDE MINIMUM OF 6 INCHES CLEARANCE BEHIND TRANSFORMER.
3. HEIGHT AS REQUIRED FOR VERTICAL CLEARANCES.
4. WIDTH AS REQUIRED TO SUPPORT UPPER TRANSFORMER. REFER TO UPPER
TRANSFORMER DIMENSIONS FOR ADDITIONAL INFORMATION.
5. PROVIDE HORIZONTAL CLEARANCE TO ALLOW MAINTENANCE ACCESS TO LOWER
TRANSFORMER. REFER TO LOWER TRANSFORMER DIMENSIONS FOR ADDITIONAL
INFORMATION.
6. PROCURE STRUCTURAL ENGINEER TO REVIEW EQUIPMENT RACK DIMENSIONS AND
TOTAL COMBINED WEIGHT.
DRY-TYPE UPPER
TRANSFORMER
AS SCHEDULE, ANCHORED
TO SUPPORT FRAME
DRY-TYPE LOWER
TRANSFORMER
AS SCHEDULE
3"X3"X1/4" STEEL SUPPORT
ANGLE FRAME PRIMED
AND PAINTED TO MATCH
TRANSFORMER
4" CONCRETE
EQUIPMENT PAD
PROVIDE ISOLATION
PAD ON EACH CORNER
FOR EACH TRANSFORMER
(TYPICAL OF 8)
SPD SUB-SECTION
(SPD MOUNTED EXTERNALLY)
4,000 A
MAIN CIRCUIT BREAKER
SUB-SECTION
BRANCH
CIRCUIT BREAKERS
SUB-SECTION
SECTION 2SECTION 1 SECTION 3
CONCRETE PAD
W A
L L
CONCRETE DECK
(10) 4"C
FROM UTILITY
TRANSFORMER
(5) 4"C
TO 'MSB' (C112E)
CRAWLSPACE
3' - 0" TO 4' - 0" 3' - 6" 3' - 0" MAX
10' - 4" MAX
1,600 A
CIRCUIT BREAKER
SUB-SECTION
DETAIL NOTES:
A. DIMENSIONS PROVIDED ARE APPROXIMATE. COORDINATE ENCLOSURE'S BOTTOM OPENING WITH LOCATION OF EXISTING UTILITY TRANSFORMER AND SWITCHBOARD 'MSB' FEEDERS. FIELD VERIFY ALL MEASUREMENTS AND
SPACE REQUIREMENTS PRIOR TO ORDERING SWITCHBOARD.
B. TO SIMPLIFY WIRING, PLACE ALL CIRCUIT BREAKERS TO BE CONNECTED TO CRAWLSPACE FEEDERS NEAR THE BOTTOM OF SECTION 1. COORDINATE ALL LAYOUT REQUIREMENTS WITH MANUFACTURER AND FIELD
CONDITIONS.
DETAIL NOTE:
ALL CONNECTIONS TO BE DOUBLE COMPRESSION (CRIMP) TYPE.
NO MECHANICAL CONNECTIONS, MINIMUM 4 CRIMPS FOR DOUBLE
COMPRESSION FITTING.
STAINLESS
STEEL NUT
STAINLESS STEEL
BELLEVILLE WASHER
STAINLESS STEEL
FLAT WASHER
DOUBLE HOLE LONG BARREL
LUG W/ INSPECTION HOLE
PROVIDE ENGRAVED 145C TAG.
DESCRIPTION SHALL IDENTIFY
CABLE DESTINATION.
FEEDER CONDUIT
LOCKNUT
(NOT SHOWN)
PANELBOARD
ENCLOSURE
PANELBOARD EQUIPMENT
GROUND BUS BONDED
TO CABINET
EQUIPMENT GROUNDING
CONDUCTOR INSTALLED
WITH FEEDER
BONDING JUMPER.
SAME SIZE AS EQUIPMENT
GROUNDING CONDUCTOR
INSULATED THROAT
GROUNDING BUSHING
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A s i n d ic a te d
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E5.01
DETAILS -
ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
ES
26126-00
2026.10.06
NO SCALE
EQUIPMENT IDENTIFICATION2
NO SCALE
BUS BAR3NO SCALE
WIRING DEVICE TYPICAL MOUNTING HEIGHTS6
NO SCALE
GROUND RISER DIAGRAM5
NO SCALE
TRANSFORMER STACKING RACK7
NO SCALE
SWITCHBOARD ELEVATION VIEW8
NO SCALE
GROUND BUS BAR CONNECTION4 NO SCALE
PANELBOARD BONDING1
SWBD 'MSA'
1600A, 480Y/277V, 3PH, 4W, MCB
'H2W' 'H3W''H2E' 'H3E''2H'
'HE'
'H1E' 'H1W'
'ELEV-1' 'ELEV-2'
'LCR'
'L1W'
'CP'
'L1WA'
'HS'
'L1E'
'L1EA'
'LS'
SWBD 'MAIN-B'
2000A, 480Y/277V, 3PH, 4W, 50KAIC
SWBD 'MAIN-A'
2000A, 480Y/277V, 3PH, 4W, 50KAIC
'L2W'
'L2WA'
'LB2''L2E'
'L2EA'
'L3E'
'L3EA'
'L3W2' 'L3W'
'L3WA'
'LB3'
'1H'
'2L'
'1L' '2LC'
P
P
SPD
SPD
'L1A'
'L1A2'
SWBD
'MSB'
DIST PANEL
'DPHE'
DIST PANEL
'DPHW'
DIST PANEL
'DPLA'
P
'KH'
'KL'
'HE'
'H1E'
'ELEV-1' 'ELEV-2'
'LCR'
'HS'
'L1E' 'LS''L1A'
'L1A2'
SPD
DPM
SWBD 'SB-MAIN'
4000A, 480Y/277V, 3PH, 4W, MCB
SWBD
'MSB'
DIST PANEL
'DPHE'
DIST PANEL
'DPHW'
DIST PANEL
'DPLA'
'2H' '1H'
'2L'
'1L' '2LC'
SPD
SPD
'H2W' 'H3W''H2E' 'H3E''H1W'
'L1W'
'CP'
'L1WA'
'L2W'
'L2WA'
'LB2''L2E'
'L2EA'
'L3E'
'L3EA'
'L3W2' 'L3W'
'L3WA'
'LB3'
P
K
'KH'
'KL'
KK
K
1. REFER TO SHEET FOR ELECTRICAL ONE-LINE LEGEND, FEEDER KEY
SCHEDULES, AND GENERAL PROJECT POWER NOTES.
2. REFER TO POWER PLANS FOR LOCATIONS OF ELECTRICAL EQUIPMENT ALONG
WITH ADDITIONAL REQUIREMENTS AND INSTRUCTIONS
3. REFER TO SHEET E5.01 FOR GROUNDING RISER DIAGRAM.
GENERAL SHEET NOTES:
E0.01
400 AS600 AS 600 AS 400 AS 400 AS 400 AS 400 AS 400 AS 400 AS 400 AS 400 AS400 AS
'TL1W'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TL1E'
75 KVA
480V:
208Y/120V
3PH, 4W
'TLS'
30 KVA
480V:
208Y/120V
3PH, 4W
'T-COMP-RM'
112.5 KVA
480V:
208Y/120V
3PH, 4W
5%Z
400 AS
A S
A S
SERVICE ENTRANCE
4000A, 480Y/277V
3PH, 4W, 50KAIC
'UTIL XFMR'
2500KVA,
PAD-MOUNTED
480Y/277V
'UTILITY'
UTILITY
METER
'TL2W'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TLB2'
45 KVA
480V:
208Y/120V
3PH, 4W
5.2%Z
'TL2E'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TL3E'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TL3W2'
112.5 KVA
480V:
208Y/120V
3PH, 4W
5.5%Z
'TL3W'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TLB3'
45 KVA
480V:
208Y/120V
3PH, 4W
5.2%Z
'T2L'
150 KVA
480V:
208Y/120V
3PH, 4W
5.36%Z
200 AS 200 AS
'GEN-C'
375 kVA 480Y/277V
3PH, 4W, 0.8PF
DIESEL
'TL1A'
75 KVA
480V:
208Y/120V
3PH, 4W
4.87%Z
'INVERTER'
100 AF
100 AT
400 AF
400 AT
(10) 3"C - (3) 500KCMIL, (1) 350KCMIL
ELEC ROOM
C112E
PENTHOUSE
EAST
PENTHOUSE
WEST
200 AS
'TDPLA'
112.5 KVA
480V:
208Y/120V
3PH, 4W
5.75%Z
ELEC ROOM
C112E
(B103A)
(B103A)
(A103)
(C238) (C238) (B102) (B102) (A102) (B202) (B202) (B303) (B303)`
ROOM NUMBER (TYP)
(A116M) (B102)
(B102)
(B102)
2,6
FROM 'K2'
'TKL'
45 KVA
480V:
208Y/120V
3PH, 4W
3.51%Z
(C112E)
(C112E)
'TL1E'
75 KVA
480V:
208Y/120V
3PH, 4W
'TLS'
30 KVA
480V:
208Y/120V
3PH, 4W
400 AS
'T-COMP-RM'
112.5 KVA
480V:
208Y/120V
3PH, 4W
5%Z
400 AS
'TL1A'
75 KVA
480V:
208Y/120V
3PH, 4W
4.87%Z
225 AF
225 AT
225 AF
225 AT
225 AF
225 AT
225 AF
225 AT
225 AF
225 AT
400 AF
400 AT
400 AF
400 AT
0 AF
0 AT
400 AF
400 AT
175 AF
175 AT
600 AF
600 AT
600 AF
600 AT
125.3C
250.4X 100.4X
50.3C
100.4C
400.4C
100 AS 100 AS
'GEN-C'
375 kVA 480Y/277V
3PH, 4W, 0.8PF
DIESEL
100 AF
100 AT
400 AF
400 AT
1600 AF
1600 AT
LSIG, 100%
SECTION 3 SECTION 2 SECTION 1
'UTIL XFMR'
2500KVA,
PAD-MOUNTED
480Y/277V
'UTILITY'
4000 AF
3800 AT
LSIG, 100%
100 AF
100 AT
ELEC ROOM
C112E
PENTHOUSE
EAST
PENTHOUSE
WEST
200 AS
'TDPLA'
112.5 KVA
480V:
208Y/120V
3PH, 4W
5.75%Z
ELEC ROOM
C112E
'T2L'
150 KVA
480V:
208Y/120V
3PH, 4W
5.36%Z
200 AS 200 AS
'TL1W'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TL2W'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TLB2'
45 KVA
480V:
208Y/120V
3PH, 4W
5.2%Z
'TL2E'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TL3E'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TL3W2'
112.5 KVA
480V:
208Y/120V
3PH, 4W
5.5%Z
'TL3W'
45 KVA
480V:
208Y/120V
3PH, 4W
4.9%Z
'TLB3'
45 KVA
480V:
208Y/120V
3PH, 4W
5.2%Z
'INVERTER'
UTILITY
METER
(10) 3"C - (3) 500KCMIL, (1) 350KCMIL
2,6
CAM-LOCK
INPUT
LOAD
BANK
GENERATOR DOCKING STATION WITH
LOAD BANK, AND KIRK-KEY INTERLOCK
'GDS400'
400A, 480Y/277V, 3PH, 4W, 42KAIC
FROM 'K2'
'TKL'
45 KVA
480V:
208Y/120V
3PH, 4W
3.51%Z
CAM-LOCK
INPUT
LOAD
BANK
GENERATOR DOCKING STATION WITH
LOAD BANK, AND KIRK-KEY INTERLOCK
'GDS100'
100A, 480Y/277V, 3PH, 4W, 42KAIC
400.4C
100.4C
DESCRIPTIONTAG
3#12, #12G, 3/4"C15.3C
3#12, #12G, 3/4"C20.3C
3#10, #10G, 3/4"C25.3C
30.3C
3#8, #10G, 3/4"C35.3C
40.3C
3#6, #10G, 3/4"C45.3C
50.3C
3#4, #10G, 1"C60.3C
70.3C
3#3, #8G, 1"C80.3C
3#2, #8G, 1 1/2"C90.3C
100.3C
110.3C
125.3C
150.3C
175.3C
200.3C
225.3C
250.3C
300.3C
350.3C
400.3C
500.3C
600.3C
DESCRIPTIONTAG
FEEDER SCHEDULE - COPPER - 3 PHASE
700.3C
800.3C
1000.3C
1200.3C
1600.3C
2000.3C
2500.3C
3000.3C
4000.3C
15.4C
20.4C
25.4C
30.4C
35.4C
40.4C
45.4C
50.4C
60.4C
70.4C
80.4C
90.4C
100.4C
110.4C
125.4C
150.4C
175.4C
200.4C
225.4C
250.4C
300.4C
350.4C
400.4C
500.4C
600.4C
700.4C
800.4C
1000.4C
1200.4C
1600.4C
2000.4C
2500.4C
3000.4C
4000.4C
3#10, #10G, 3/4"C
3#8, #10G, 3/4"C
3#6, #10G, 3/4"C
3#4, #8G, 1"C
3#1, #8G, 1 1/2"C
3#2, #6G, 1 1/2"C
3#1, #6G, 1 1/2"C
3#1/0, #6G, 1 1/2"C
3#2/0, #6G, 2"C
3#3/0, #6G, 2"C
3#4/0, #4G, 2"C
3-250, #4G, 3"C
3-350, #4G, 3"C
3-500, #3G, 3"C
3-600, #3G, 3"C
2 SETS OF 3-250, #2G, 3"C
2 SETS OF 3#3/0, #3G, 2"C
450.3C 450.4C2 SETS OF 3#4/0, #2G, 2"C
2 SETS OF 3-350, #1G, 3"C
2 SETS OF 3-500, #1/0G, 3"C
3 SETS OF 3-300, #1/0G, 3"C
4 SETS OF 3-250, #2/0G, 3"C
4 SETS OF 3-350, #3/0G, 3"C
5 SETS OF 3-400, #4/0G, 3"C
6 SETS OF 3-400, 250G, 3"C
7 SETS OF 3-500, 350G, 4"C
8 SETS OF 3-500, 400G, 4"C
12 SETS OF 3-400, 500G, 3"C
4#12, #12G, 3/4"C
4#12, #12G, 3/4"C
4#10, #10G, 3/4"C
4#8, #10G, 1"C
4#6, #10G, 1"C
4#4, #10G, 1 1/2"C
4#3, #8G, 1 1/2"C
4#2, #8G, 1 1/2"C
4#10, #10G, 3/4"C
4#8, #10G, 1"C
4#6, #10G, 1"C
4#4, #8G, 1 1/2"C
4#2, #8G, 1 1/2"C
4#1, #6G, 1 1/2"C
4#1, #6G, 1 1/2"C
4#1/0, #6G, 2"C
4#2/0, #6G, 2"C
4#3/0, #6G, 2"C
4#4/0, #4G, 3"C
4-250, #4G, 3"C
4-350, #4G, 3"C
4-500, #3G, 4"C
4-600, #3G, 4"C
2 SETS OF 4-250, #2G, 3"C
2 SETS OF 4#3/0, #3G, 3"C
2 SETS OF 4#4/0, #2G, 3"C
2 SETS OF 4-350, #1G, 3"C
2 SETS OF 4-500, #1/0G, 4"C
3 SETS OF 4-300, #1/0G, 3"C
4 SETS OF 4-250, #2/0G, 3"C
4 SETS OF 4-350, #3/0G, 3"C
5 SETS OF 4-400, #4/0G, 4"C
6 SETS OF 4-400, 250G, 4"C
7 SETS OF 4-500, 350G, 4"C
8 SETS OF 4-500, 400G, 4"C
12 SETS OF 4-400, 500G, 4"C
DESCRIPTIONTAG
60.4X
100.4X
FEEDER SCHEDULE
TRANSFORMER SECONDARY COPPER
4#4, 1#8G, 1 1/2"C
250.4X
400.4X
4#1, 1#6G, 1 1/2"C
4-250, 1#2G, 3"C
2 SETS OF 4#3/0, 1#1/0G, 2"C
800.4X 3 SETS OF 4-300, 1#3/0G, 3"C
150.4X 4#1/0, 1#6G, 2"C
500.4X 2 SETS OF 4-250, 1#1/0G, 3"C
1000.4X 4 SETS OF 4-250, 1#3/0G, 3"C
1. THE DIGITAL POWER METER (DPM) DEVICE SHALL BE EQUIPPED WITH A
DISPLAY TO PROVIDE LOCAL ACCESS TO METERED DATA. THE FOLLOWING
INSTANTANEOUS READINGS SHALL BE MONITORED, DISPLAYED, AND
COMMUNICATED BY THE DPM:
A. FREQUENCY
B. CURRENT, PER PHASE AND 3-PHASE AVERAGE RMS, PEAK DEMAND
C. VOLTAGE, PHASE-TO-PHASE AND PHASE-TO-NEUTRAL
D. POWER FACTOR, PER PHASE AND 3-PHASE TOTAL
E. REAL POWER (KW), 3-PHASE TOTAL, PEAK DEMAND, CUMULATIVE (KWH)
F. REACTIVE POWER (KVAR), 3-PHASE TOTAL
2. PROVIDE DPM WITH THE CAPABILITY TO COMMUNICATE AND INTERFACE WITH
CAMPUS’ BUILDING MANAGEMENT SYSTEM (BMS) VIA BACNET IP OR BACNET
MSTP TO REMOTELY MONITOR THE SERVICE ENTRANCE EQUIPMENT’S POWER
QUALITY AND USAGE. CONTRACTOR SHALL PROVIDE ALL HARDWARE,
CONDUITS, LOW VOLTAGE CABLING, AND THE NECESSARY PROGRAMMING TO
THE EXISTING BMS.
3. APPROVED MANUFACTURER: SQUARE D POWER LOGIC PM5000.
4. THE POWER MONITORING SYSTEM SHALL INCLUDE AN APPLICATION
DESIGNED TO MONITOR ALL DPM DEVICES IN THE BACKGROUND FOR ALARMS,
EVENTS, AND DATA LOGGING.
A. DISPLAY INFORMATION SHALL INCLUDE REAL TIME DATA AND TREND
DISPLAYS, HISTORICAL REPORTS, GRAPHICAL DISPLAYS WITH REAL-TIME
UPDATES.
B. GRAPHICAL WAVEFORM SHALL DISPLAY VOLTAGES, PHASE CURRENTS,
TOTAL HARMONIC DISTORTION (THD), AND PEAK VALUES.
5. THE SYSTEM SHALL MAINTAIN MAXIMUM AND MINIMUM VALUES FOR EACH OF
THE INSTANTANEOUS VALUES REPORTED, AS WELL AS THE TIME AND DATE OF
THE HIGHEST PEAK FOR ALL PEAK DEMAND READINGS.
6. STARTUP AND TRAINING:
A. ONSITE STARTUP AND TRAINING OF THE POWER MONITORING SYSTEM
SHALL BE INCLUDED IN THE PROJECT BID. STARTUP SHALL INCLUDE A
COMPLETE WORKING DEMONSTRATION.
B. TRAINING SHALL INCLUDE ANY DOCUMENTATION AND HANDS-ON
EXERCISES NECESSARY TO ENABLE ELECTRICAL OPERATIONS
PERSONNEL TO ASSUME FULL OPERATING RESPONSIBILITY AFTER
COMPLETION OF THE TRAINING PERIOD.
POWER MONITORING SYSTEM NOTES:
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E6.01
ONE-LINE DIAGRAMS
- ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
ES
26126-00
2026.10.06
◯ NOTES BY SYMBOL ' ':
1 OVERCURRENT PROTECTION RATING IS UNKNOWN. RECORD THE
OVERCURRENT PROTECTION RATING OF EACH BRANCH CIRCUIT DURING
SWITCHBOARD REMOVAL PHASE TO FACILITATE MATCHING RATINGS TO NEW
CIRCUIT BREAKERS IN NEW EQUIPMENT.
2 ELECTRICAL CIRCUIT BRANCH FEEDING EQUIPMENT AT NETWORK
OPERATIONS CENTER (NOC). ENSURE THIS BRANCH, FROM PANEL 'HE'
THROUGH 'LCR', REMAINS ENERGIZED THROUGHOUT ENTIRE CONSTRUCTION
PERIOD.
3 DISCONNECT EXISTING FEEDER FROM EXISTING GENERATOR AND PREPARE
TO CONNECT TO NEW GENERATOR DOCKING STATION.
4 REFER TO POWER MONITORING SYSTEM NOTES IN THIS SHEET FOR
INFORMATION ON DIGITAL POWER METER REQUIREMENTS. REFER TO
SPECIFICATION SECTIONS 26 24 13 AND 26 09 00 FOR ADDITIONAL
INFORMATION.
5 PROVIDE CIRCUIT BREAKER THAT MATCHES RECORDED OVERCURRENT
PROTECTION RATING OF EXISTING BRANCH CIRCUIT.
6 PROVIDE MAIN CIRCUIT BREAKER WITH LONG-TIME PICK-UP SETTING
REACHING ABSOLUTELY NO HIGHER THAN 3800 A. PROVIDE RED PLACARD
STATING “MAXIMUM LONG-TIME PICK-UP SETTING: 3,800 AMPS” IN WHITE FONT
AND ATTACH IT ON SAME ENCLOSURE SECTION AS MAIN CIRCUIT BREAKER.
7 PROVIDE EXTERIOR SURFACE-MOUNTED TYPE 2 SURGE PROTECTION DEVICE
(SPD), RATED AT 300KA/PHASE MINIMUM. CONNECT SPD TO LOAD BUS VIA
DEDICATED CIRCUIT BREAKER MOUNTED IMMEDIATELY DOWNSTREAM OF
MAIN CIRCUIT BREAKER. TIGHTLY TWIST FEEDER CONDUCTORS AND MAINTAIN
A MAXIMUM LENGTH OF 12 INCHES. COORDINATE CIRCUIT BREAKER RATING
AND ADDITIONAL FEEDER REQUIREMENTS WITH SPD MANUFACTURER.
8 PROVIDE EXISTING CIRCUIT BREAKER IN GENERATOR WITH KIRK-KEY
INTERLOCK DEVICE.
9 CONNECT EXISTING FEEDER TO NEW GENERATOR DOCKING STATION. EXTEND
EXISTING FEEDER AS NECESSARY
NO SCALE
ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION1
NO SCALE
ELECTRICAL ONE-LINE DIAGRAM - NEW2
NOTE:
THESE DOCUMENTS ARE
INTENDED FOR INTERIM
REVIEW AND NOT
INTENDED FOR BIDDING,
PERMIT, OR
CONSTRUCTION PURPOSES
ELECTRICAL ENGINEER
DRAWN BY:
CHECKED BY:
SHEET NO.
REVISIONS
F
IL
E P
A T
H
D A
T E
/T
IM
E
P L O
T S
C A
L E
APPROVED BY:
EDGAR B. SOARES
P.E. # 155472
12222 Merit Dr
Suite 400
Dallas, TX 75251
TX Firm #F-2176
(972) 788-4222
Project
A u to d e s k D o c s /C
C M c K in n e y M a in
B ld g S w it c h b o a rd
R e p la c e m e n t/
-C
C M c K in n e y M a in
B u ild in g S w it c h b o a rd
R e p la c e m e n t-
R W
B -r
.r v t
/6
/2
:0 :2
P
M
JD
DB
E7.01
PANEL SCHEDULES -
ELECTRICAL
S W
IT
C
H B
O A
R D
R E
P L A
C E
M E
N T
C O
L L
IN
C O
L L E
G E
M
C K
IN
N
E Y
C A
M P
U S
M
A
IN
B U
IL
D
IN
G
W
U
N
IV
E R
S
IT
Y D
R
IV
E M
C K
IN
N
E Y
T
E X
A S
ES
26126-00
2026.10.06
[1] PROVIDE NEW CIRCUIT BREAKER THAT MATCHES EXISTING OVERCURRENT PROTECTION RATING OF EXISTING BRANCH CIRCUIT.
NOTES:
THIS SWITCHBOARD REPLACES THE EXISTING SWITCHBOARD. ASSOCIATED EXISTING LOADS ARE TO BE RE-CONNECTED. NO NEW LOADS ARE ADDED.
14 (E) ELEVATORS 3 400.0 A 0.0 A 0 VA SEE ONE-LINE SEE NOTE 1
13 PANEL 'H3W' - RM B303 3 225.0 A 225.0 A 0 VA SEE ONE-LINE
12 PANEL 'H3E' - RM B303 3 225.0 A 225.0 A 0 VA SEE ONE-LINE
11 PANEL '2H' - RM C238 3 400.0 A 400.0 A 0 VA SEE ONE-LINE
10 PANEL 'H2W' - RM B202 3 225.0 A 225.0 A 0 VA SEE ONE-LINE
9 PANEL 'H2E' - RM B202 3 225.0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .