Calculation of Self-Performed Work.pdf
PDF 118 KB Posted
- Attached to
- Replace Main Distribution Panel and Associated Electrical Feeders Federal contract opportunity
- Solicitation number
- 1232SA25R0033
About this file
The document is a Calculation of Self-Performed/Subcontracted Work template for federal contract opportunities related to construction work. It requires offerors in specific NAICS codes (236xxx, 237xxx, and 238xxx) to demonstrate that 15-25% of contract performance personnel costs will be spent on their own employees or other small business employees. The template provides a structured format for breaking down personnel and material/equipment costs by specification division, with sections to calculate self-performed work percentage, including total personnel costs, subcontractor costs, and a final self-performed work calculation. The form requires an authorized representative's signature certifying the accuracy of the information, with personnel costs defined to include laborers, mechanics, tradesmen, and office personnel directly charged to the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In 07162025.pdf | ||
| SF30 - Amendment 01.pdf | ||
| Site Visit Sign-In 07152025.pdf | ||
| RFIs.pdf | ||
| SF-1442.pdf | ||
| Wage Determination.pdf | ||
| ARS-371.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Statement of Work and Specifications.pdf | ||
| Drawings.pdf | ||
| ARS-372.pdf | ||
| Contractor Certification Regarding EMR.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF‐PERFORMED/SUBCONTRACTED WORK
Offerors for NAICS 236xxx must provide 15%, NAICS 237xxx and 238xxx 25% of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible small business concerns. Below is a suggested format.
Specification Division SB Vendor (Y or N) Personnel Cost Material/Equipment Costs
Division 01 $ $
Division 02 $ $
Division 03 $ $
(Add additional lines as necessary for each Division applicable to this project)
Sub Total (Personnel Costs, Material/Equipment Costs)
Profit $
Home Office Overhead $
Bond $
Grand Total $
Calculation of self‐performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self‐performed under the Contract’: $
4. Self‐performed work = Line 3/Line 1 x 100 = %
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)