About this file

This document is a Requests for Information (RFI) for Solicitation 1232SA25R0033, containing three technical questions and answers related to an electrical construction project. The questions address conduit reuse, backup power requirements, and spare breakers for a new main distribution panel. Specific answers reference Project Drawing Sheets #2 and #5, indicating that existing conduits passing a mandrel may be reused, backup power details are on Drawing Sheet #2, and spare breakers are shown on Drawing Sheet #5.

The RFI is part of a larger solicitation by the USDA Agricultural Research Service for replacing the main distribution panel and associated electrical feeders at the North Central Soil Conservation Research Laboratory in Morris, Minnesota. The project is a Service Disabled Veteran Owned Small Business set-aside with a construction magnitude between $250,000 and $500,000, a 210-day performance period, and requiring bid, payment, and performance bonds. Potential contractors must be registered in SAM, attend optional site visits by July 16, 2025, and submit questions by July 30, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Main Distribution Panel and Associated Electrical Feeders, newest first.
File Type Posted
Site Visit Sign-In 07162025.pdf PDF
Site Visit Sign-In 07152025.pdf PDF
SF30 - Amendment 01.pdf PDF
SF-1442.pdf PDF
Wage Determination.pdf PDF
Calculation of Self-Performed Work.pdf PDF
ARS-371.pdf PDF
Past Performance Questionnaire.pdf PDF
Contractor Certification Regarding EMR.pdf PDF
Statement of Work and Specifications.pdf PDF
Drawings.pdf PDF
ARS-372.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information Solicitation 1232SA25R0033

Question 1: Can we use the existing conduits?

Answer 1: Where not called out for new, conduits that pass a mandrel may be reused.

Question 2: Will you require backup/temporary power?

Answer 2: Refer to notes on Project Drawing Sheet #2.

Question 3: Will you require/want any spare breakers for the new main?

Answer 3: Yes, as shown on Project Drawing Sheet #5.

File details come from the government source that posted it. Updated .