RFIs.pdf
PDF 75 KB Posted
- Attached to
- Replace Main Distribution Panel and Associated Electrical Feeders Federal contract opportunity
- Solicitation number
- 1232SA25R0033
About this file
This document is a Requests for Information (RFI) for Solicitation 1232SA25R0033, containing three technical questions and answers related to an electrical construction project. The questions address conduit reuse, backup power requirements, and spare breakers for a new main distribution panel. Specific answers reference Project Drawing Sheets #2 and #5, indicating that existing conduits passing a mandrel may be reused, backup power details are on Drawing Sheet #2, and spare breakers are shown on Drawing Sheet #5.
The RFI is part of a larger solicitation by the USDA Agricultural Research Service for replacing the main distribution panel and associated electrical feeders at the North Central Soil Conservation Research Laboratory in Morris, Minnesota. The project is a Service Disabled Veteran Owned Small Business set-aside with a construction magnitude between $250,000 and $500,000, a 210-day performance period, and requiring bid, payment, and performance bonds. Potential contractors must be registered in SAM, attend optional site visits by July 16, 2025, and submit questions by July 30, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In 07162025.pdf | ||
| Site Visit Sign-In 07152025.pdf | ||
| SF30 - Amendment 01.pdf | ||
| SF-1442.pdf | ||
| Wage Determination.pdf | ||
| Calculation of Self-Performed Work.pdf | ||
| ARS-371.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Contractor Certification Regarding EMR.pdf | ||
| Statement of Work and Specifications.pdf | ||
| Drawings.pdf | ||
| ARS-372.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information Solicitation 1232SA25R0033
Question 1: Can we use the existing conduits?
Answer 1: Where not called out for new, conduits that pass a mandrel may be reused.
Question 2: Will you require backup/temporary power?
Answer 2: Refer to notes on Project Drawing Sheet #2.
Question 3: Will you require/want any spare breakers for the new main?
Answer 3: Yes, as shown on Project Drawing Sheet #5.