CA ERFO FS2021-2 Final Plans.pdf

PDF 12 MB Posted

Attached to
CA ERFO FS PLMAS 2021-02(1) North Fork Feather River Bridge Federal contract opportunity
Solicitation number
6982AF23B000012
Issued by
Department of Transportation Federal Highway Administration

About this file

This federal contract opportunity notice is for bridge construction services on the North Fork Feather River in California. The Department of Transportation Federal Highway Administration is soliciting proposals under solicitation number 6982AF23B000012 to replace an existing bridge over the North Fork Feather River on CA Route 70 with a new single-span bridge. Proposals are due by June 15, 2022 and the contract is expected to be awarded by August 1, 2022. The construction work must be completed within 18 months of the award date. The contractor will be responsible for all aspects of design and construction in accordance with the final plans PDF file, which provides specifications and drawings for the bridge work.

View the file

Other files for this federal contract opportunity

Other files attached to CA ERFO FS PLMAS 2021-02(1) North Fork Feather River Bridge, newest first.
File Type Posted
Bid Tabs.pdf PDF
Bid Opening Summary.doc DOC document
Amendment A003 CA ERFO FS PLMAS 2021-02(1).pdf PDF
Amendment A002 CA ERFO FS PLMAS 2021-02(1).pdf PDF
6982AF23B000012 Q and A 9-13-23.pdf PDF
Amendment A001 CA ERFO FS PLMAS 2021-02(1).pdf PDF
6982AF23B000012 Q and A 9-6-23.pdf PDF
6982AF23B000012 Q and A 8-31-23.pdf PDF
CA ERFO FS 2021 N. Fork Feather River Bridge Final Hydraulics Report_rev.pdf PDF
CA.ERFO.FS PLMAS.2021-02.North Fork Feather River Bridge.Geotech Rpt FINAL.rev.pdf PDF
6982AF23B000012.pdf PDF
FP-14_Eng.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Via Letter dated 7/12/2023

CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2023.08.03 09:33:14 -06'00'

Sheet and Description

B4 B5 - B6 S2

Grading Summary Miscellaneous Summaries North Fork Feather River Bridge ALLOWANCE Bid Schedule

A1000 15101-0000 MOBILIZATION LPSM ALL

A1020 15214-1000 SURVEY AND STAKING, BRIDGE

(NORTH FORK FEATHER RIVER

BRIDGE) LPSM All ALL

A1040 15225-0000 SLOPE, REFERENCE, AND

CLEARING AND GRUBBING CONTROL MILE 0.044 0.044

A1060 15236-2000 SURVEY CONTROL, GRADE

FINISHING MILE 0.087 0.087

A1080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A1100 15401-0000 CONTRACTOR TESTING LPSM ALL

A1120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A1140 15701-0000 SOIL EROSION CONTROL (NORTH

FORK FEATHER RIVER BRIDGE) LPSM All ALL

A1160 20103-0000 CLEARING AND GRUBBING SQYD 2,134 66 2,200

A1180 20301-2400 REMOVAL OF SIGN EACH 1 1

A1200 20304-2000 REMOVAL OF BRIDGE (NORTH FORK

FEATHER RIVER BRIDGE) LPSM All ALL

A1220 20315-0000 SAWCUTTING PAVEMENT LNFT 4 30

A1240 20420-0000 EMBANKMENT CONSTRUCTION CUYD 285 40 325

A1260 20801-0000 STRUCTURE EXCAVATION CUYD 130 130 Contract Quantity

A1280 20803-0000 STRUCTURAL BACKFILL CUYD 40 40 Contract Quantity

A1300 20820-0000 DEWATERING LPSM All ALL

A1320 25101-2200 PLACED RIPRAP, METHOD B,

CLASS 2 CUYD 170 170

A1340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 387 23 410

A1360 40301-0000 ASPHALT CONCRETE PAVEMENT TON 60 5 65

A1380 40505-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 0.60 0.05 0.65

A1400 40601-0000 FOG SEAL TON 0.15 0.01 0.16

A1420 41102-0000 PRIME COAT SQYD 371 19 390

A1440 41201-0000 TACK COAT TON 0.16 0.01 0.17

A1460 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity

(AE) CUYD 99 99

A1480 55401-1000 REINFORCING STEEL (NORTH FORK Contract Quantity

FEATHER RIVER BRIDGE) LB 4,000 4,000

A1500 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity

COATED LB 19,200 19,200

A1520 55502-0000 STRUCTURAL STEEL, FURNISHED, Contract Quantity

FABRICATED, AND ERECTED LB 105,000 105,000

MileStone: Final Date Completed: 07/13/23 Report Date: 07/13/23

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-J ul

-2

:5

A M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

N

C A \e rf of s2

1-

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

\S pr ea ds he et s\ [N

F or k Fe at he r

S O

Q

.x ls m ]S he et

STATE PROJECT

B1CA ERFO FS PLMAS 2021-02(1)

NORTH FORK FEATHER RIVER BRIDGE

CA

SHEET

NUMBER

Sheet and Description

B4 B5 - B6 S2

Grading Summary Miscellaneous Summaries North Fork Feather River Bridge ALLOWANCE Bid Schedule

A1540 55601-0900 BRIDGE RAILING, STEEL (OREGON Contract Quantity

DOT BR206 2-TUBE CURB MOUNTED

RAIL) LNFT 262 262

A1560 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 6 6 Contract Quantity

A1580 56501-0300 DRILLED SHAFT, 30-INCH

DIAMETER LNFT 288 288

A1600 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, 8-inch block option. See sheet T2.

CLASS A STEEL POSTS LNFT 88 2 90

A1620 61702-1500 TERMINAL SECTION, TYPE MGS

TANGENT EACH 4 4

A1640 61707-0000 STRUCTURE TRANSITION RAILING LNFT 84 84 Contract Quantity

A1660 62201-0250 DUMP TRUCK, 10 CUBIC YARD

MINIMUM CAPACITY HOUR 20

A1680 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 18-INCH WIDTH HOUR 20

A1700 62201-2050 ROLLER HOUR 20

A1720 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM

BLADE HOUR 20

A1740 62201-3000 HYDRAULIC EXCAVATOR HOUR 20

A1760 62301-0000 GENERAL LABOR HOUR 40

A1780 62302-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES HOUR 20

A1800 62302-1100 SPECIAL LABOR, HIRED SURVEY

SERVICES HOUR 20

A1820 62405-0400 PLACING CONSERVED TOPSOIL,

6-INCH DEPTH SQYD 277 23 300

A1840 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 812 38 850

A1860 62516-3000 MULCHING, HYDRAULIC METHOD,

BONDED FIBER MATRIX SQYD 812 38 850

A1880 63301-0000 SIGN SYSTEM EACH 3 3

A1900 63309-0000 DELINEATOR EACH 1 1

A1920 63403-0200 PAVEMENT MARKINGS, TYPE B SQFT 15 15

A1940 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

-J ul -2

:5

A M

MileStone: Final Date Completed: 07/13/23 Report Date: 07/13/23

N

C A \e rf of s2

1-

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

\S pr ea ds he et s\ [N

F or k Fe at he r

S O

Q

.x ls m ]S he et

2)

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B2

CA ERFO FS PLMAS 2021-02(1)

NORTH FORK FEATHER RIVER BRIDGECA

S22

Indian Creek Bridge ALLOWANCE Bid Schedule

X1000 15101-0000 MOBILIZATION LPSM ALL

X1020 15214-1000 SURVEY AND STAKING, BRIDGE

(INDIAN CREEK BRIDGE) LPSM ALL

X1040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

X1060 15401-0000 CONTRACTOR TESTING LPSM ALL

X1080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

X1100 15701-0000 SOIL EROSION CONTROL (INDIAN

CREEK BRIDGE) LPSM ALL

X1120 20304-2000 REMOVAL OF BRIDGE (INDIAN

CREEK BRIDGE) LPSM All ALL

X1140 55401-1000 REINFORCING STEEL (INDIAN

CREEK BRIDGE) LB 200 200

X1160 55504-0000 PRE-FABRICATED STEEL BRIDGE LPSM All ALL

X1180 60101-0000 CONCRETE CUYD 2 2

X1200 62301-0000 GENERAL LABOR (INDIAN CREEK

BRIDGE) HOUR 20

-J ul -2

:5

A M

MileStone: Final Date Completed: 07/13/23 Report Date: 07/13/23

N

C A \e rf of s2

1-

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

\S pr ea ds he et s\ [N

F or k Fe at he r

S O

Q

.x ls m ]S he et

3)

SUMMARY OF QUANTITIES - Option X

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B3

CA ERFO FS PLMAS 2021-02(1)

NORTH FORK FEATHER RIVER BRIDGECA

File details come from the government source that posted it. Updated .