Bid Opening Summary.doc

DOC document 39 KB Posted

Attached to
CA ERFO FS PLMAS 2021-02(1) North Fork Feather River Bridge Federal contract opportunity
Solicitation number
6982AF23B000012
Issued by
Department of Transportation Federal Highway Administration

About this file

This bid opening summary document outlines the bids received for the CA ERFO FS PLMAS 2021-02(1) North Fork Feather River Bridge project. Four contractors submitted bids by the September 28, 2023 deadline to complete bridge construction work. STG Pacific, LLC provided the lowest total bid at $4,643,024.46, while SEB Engineering, Inc. dba Stewart Engineering, Inc. submitted the second lowest bid of $3,741,486.00. The engineer's estimate for the project was $4,478,000.00. All bids remain subject to verification by the contracting agency, the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Other files attached to CA ERFO FS PLMAS 2021-02(1) North Fork Feather River Bridge, newest first.
File Type Posted
Bid Tabs.pdf PDF
Amendment A003 CA ERFO FS PLMAS 2021-02(1).pdf PDF
Amendment A002 CA ERFO FS PLMAS 2021-02(1).pdf PDF
6982AF23B000012 Q and A 9-13-23.pdf PDF
Amendment A001 CA ERFO FS PLMAS 2021-02(1).pdf PDF
6982AF23B000012 Q and A 9-6-23.pdf PDF
6982AF23B000012 Q and A 8-31-23.pdf PDF
CA ERFO FS2021-2 Final Plans.pdf PDF
CA.ERFO.FS PLMAS.2021-02.North Fork Feather River Bridge.Geotech Rpt FINAL.rev.pdf PDF
6982AF23B000012.pdf PDF
FP-14_Eng.pdf PDF
CA ERFO FS 2021 N. Fork Feather River Bridge Final Hydraulics Report_rev.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: North Fork Feather River Bridge Project Number: CA ERFO FS PLMAS 2021-02(1) Bid Opening Date: 09/28/2023 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Eric Grosskreuz Amendments: (1)___09/07/2023 ___ (2) ___09/13/2023_____(3) 09/25/2023 (4)

Bidder’s Name
Schedule A
Option X
BID TOTAL

1. STG Pacific, LLC

Anchorage, AK

$4,189,854.46
$453,170.00
$4,643,024.46

2. SEB Engineering, Inc.

dba Stewart Engineering, Inc.

Redding, CA

$3,270,486.00
$471,000.00
$3,741,486.00

3. Steelhead Constructors, Inc.

Redding, CA

$3,792,051.00
$431,000.00
$4,223,051.00

4.

5.

6.

7.

Engineer’s Estimate

$3,980,000.00
$498,000.00
$4,478,000.00

*All bids are subject to verification.

File details come from the government source that posted it. Updated .