This document is a tabulation of bids report for solicitation number 6982AF23B000012 to replace the North Fork Feather River Bridge. The bids were opened on September 28, 2023 by the Department of Transportation Federal Highway Administration.
The report provides pricing from four contractors for the base schedule and a single option. For the base schedule, SEB Engineering Inc. dba Stewart Engineering Inc. provided the lowest bid at $3,270,486, followed by Steelhead Constructors JV at $3,792,051, STPG Malcom JV LLC at $4,211,274.46, and the engineer's estimate was $3,980,000. For the single option, pricing ranged from $431,000 by Steelhead Constructors JV to $471,000 by SEB Engineering Inc. dba Stewart Engineering Inc., with an engineer's estimate of $498,000. The award date is to be determined. The report includes line item details for all pricing provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.doc | DOC document | |
| Amendment A003 CA ERFO FS PLMAS 2021-02(1).pdf | ||
| Amendment A002 CA ERFO FS PLMAS 2021-02(1).pdf | ||
| 6982AF23B000012 Q and A 9-13-23.pdf | ||
| Amendment A001 CA ERFO FS PLMAS 2021-02(1).pdf | ||
| 6982AF23B000012 Q and A 9-6-23.pdf | ||
| 6982AF23B000012 Q and A 8-31-23.pdf | ||
| CA ERFO FS2021-2 Final Plans.pdf | ||
| CA.ERFO.FS PLMAS.2021-02.North Fork Feather River Bridge.Geotech Rpt FINAL.rev.pdf | ||
| 6982AF23B000012.pdf | ||
| FP-14_Eng.pdf | ||
| CA ERFO FS 2021 N. Fork Feather River Bridge Final Hydraulics Report_rev.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 10/03/23
1 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Contractor Responsive?
Engineer's Estimate
SEB Engineering Inc. dba Stewart Engineering Inc.
Steelhead Constructors JV
STPG Malcom JV LLC
Base Schedule A
$3,980,000.00
$3,270,486.00
$3,792,051.00
$4,211,274.46
Option: X
$498,000.00
$471,000.00
$431,000.00
$453,170.00
Contractor Responsive?
Engineer's Estimate
SEB Engineering Inc. dba Stewart Engineering Inc.
Steelhead Constructors JV
STPG Malcom JV LLC
Total Base Schedule A and Option(s): X
$4,478,000.00
$3,741,486.00
$4,223,051.00
$4,664,444.46
2 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF23B000012
Division: Central Federal Lands
State: CA County: Plumas
Federal Land: Plumas National Forest Opened at: Lakewood, CO
Opened by: Eric Grosskreuz
Date: 09/28/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
SEB Engineering Inc. dba Stewart Engineering Inc. $3,270,486.00 P.O. Box 990010 Redding, CA 96099
Steelhead Constructors JV $3,792,051.00 PO Box 536 Palo Cedro, CA 96073
STPG Malcom JV LLC $4,211,274.46 3700 Centerpoint Drive, Suite 8155 Anchorage, AK 99503
Engineer's Estimate $3,980,000.00
3 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1000 15101-0000 MOBILIZATION
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $330,000.00 Steelhead Constructors JV Lump Sum $650,000.00 STPG Malcom JV LLC Lump Sum $420,000.00 Engineer's Estimate ALL LPSM Lump Sum $429,792.50
A1020 15214-1000 SURVEY AND STAKING, BRIDGE (NORTH FORK FEATHER RIVER BRIDGE)
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $16,200.00 Steelhead Constructors JV Lump Sum $8,000.00 STPG Malcom JV LLC Lump Sum $9,125.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A1040 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
SEB Engineering Inc. dba Stewart Engineering Inc. $174,000.00 $7,656.00 Steelhead Constructors JV $204,545.45 $9,000.00 STPG Malcom JV LLC $311,120.00 $13,689.28 Engineer's Estimate 0.044 MILE $75,000.00 $3,300.00
A1060 15236-2000 SURVEY CONTROL, GRADE FINISHING
SEB Engineering Inc. dba Stewart Engineering Inc. $139,000.00 $12,093.00 Steelhead Constructors JV $103,448.28 $9,000.00 STPG Malcom JV LLC $104,890.00 $9,125.43 Engineer's Estimate 0.087 MILE $65,000.00 $5,655.00
A1080 15301-0000 CONTRACTOR QUALITY CONTROL
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $346,000.00 Steelhead Constructors JV Lump Sum $75,000.00 STPG Malcom JV LLC Lump Sum $267,785.00 Engineer's Estimate ALL LPSM Lump Sum $121,300.00
A1100 15401-0000 CONTRACTOR TESTING
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $6,500.00 Steelhead Constructors JV Lump Sum $75,000.00 STPG Malcom JV LLC Lump Sum $45,625.00 Engineer's Estimate ALL LPSM Lump Sum $103,125.00
4 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1120 15501-0000 CONSTRUCTION SCHEDULE
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $14,600.00 Steelhead Constructors JV Lump Sum $15,000.00 STPG Malcom JV LLC Lump Sum $12,720.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A1140 15701-0000 SOIL EROSION CONTROL (NORTH FORK FEATHER RIVER BRIDGE)
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $55,000.00 Steelhead Constructors JV Lump Sum $25,000.00 STPG Malcom JV LLC Lump Sum $36,920.00 Engineer's Estimate ALL LPSM Lump Sum $33,650.00
A1160 20103-0000 CLEARING AND GRUBBING
SEB Engineering Inc. dba Stewart Engineering Inc. $15.00 $33,000.00 Steelhead Constructors JV $5.00 $11,000.00 STPG Malcom JV LLC $37.00 $81,400.00 Engineer's Estimate 2,200 SQYD $33.00 $72,600.00
A1180 20301-2400 REMOVAL OF SIGN
SEB Engineering Inc. dba Stewart Engineering Inc. $165.00 $165.00 Steelhead Constructors JV $250.00 $250.00 STPG Malcom JV LLC $2,375.00 $2,375.00 Engineer's Estimate 1 EACH $350.00 $350.00
A1200 20304-2000 REMOVAL OF BRIDGE (NORTH FORK FEATHER RIVER BRIDGE)
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $35,000.00 Steelhead Constructors JV Lump Sum $25,000.00 STPG Malcom JV LLC Lump Sum $76,100.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00
A1220 20315-0000 SAWCUTTING PAVEMENT
SEB Engineering Inc. dba Stewart Engineering Inc. $21.00 $630.00 Steelhead Constructors JV $40.00 $1,200.00 STPG Malcom JV LLC $40.00 $1,200.00 Engineer's Estimate 30 LNFT $14.00 $420.00
5 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1240 20420-0000 EMBANKMENT CONSTRUCTION
SEB Engineering Inc. dba Stewart Engineering Inc. $151.00 $49,075.00 Steelhead Constructors JV $200.00 $65,000.00 STPG Malcom JV LLC $286.00 $92,950.00 Engineer's Estimate 325 CUYD $212.00 $68,900.00
A1260 20801-0000 STRUCTURE EXCAVATION
SEB Engineering Inc. dba Stewart Engineering Inc. $157.00 $20,410.00 Steelhead Constructors JV $220.00 $28,600.00 STPG Malcom JV LLC $357.00 $46,410.00 Engineer's Estimate 130 CUYD $300.00 $39,000.00
A1280 20803-0000 STRUCTURAL BACKFILL
SEB Engineering Inc. dba Stewart Engineering Inc. $760.00 $30,400.00 Steelhead Constructors JV $1,400.00 $56,000.00 STPG Malcom JV LLC $1,600.00 $64,000.00 Engineer's Estimate 40 CUYD $400.00 $16,000.00
A1300 20820-0000 DEWATERING
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $17,000.00 Steelhead Constructors JV Lump Sum $35,000.00 STPG Malcom JV LLC Lump Sum $106,450.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00
A1320 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
SEB Engineering Inc. dba Stewart Engineering Inc. $220.00 $37,400.00 Steelhead Constructors JV $450.00 $76,500.00 STPG Malcom JV LLC $868.00 $147,560.00 Engineer's Estimate 170 CUYD $325.00 $55,250.00
A1340 30202-2000 ROADWAY AGGREGATE, METHOD 2
SEB Engineering Inc. dba Stewart Engineering Inc. $113.00 $46,330.00 Steelhead Constructors JV $180.00 $73,800.00 STPG Malcom JV LLC $308.00 $126,280.00 Engineer's Estimate 410 TON $132.00 $54,120.00
6 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1360 40301-0000 ASPHALT CONCRETE PAVEMENT
SEB Engineering Inc. dba Stewart Engineering Inc. $1,150.00 $74,750.00 Steelhead Constructors JV $670.00 $43,550.00 STPG Malcom JV LLC $280.00 $18,200.00 Engineer's Estimate 65 TON $1,005.00 $65,325.00
A1380 40505-3000 ANTISTRIP ADDITIVE, TYPE 3
SEB Engineering Inc. dba Stewart Engineering Inc. $5,900.00 $3,835.00 Steelhead Constructors JV $1,538.46 $1,000.00 STPG Malcom JV LLC $375.00 $243.75 Engineer's Estimate 0.65 TON $4,500.00 $2,925.00
A1400 40601-0000 FOG SEAL
SEB Engineering Inc. dba Stewart Engineering Inc. $32,000.00 $5,120.00 Steelhead Constructors JV $6,250.00 $1,000.00 STPG Malcom JV LLC $1,500.00 $240.00 Engineer's Estimate 0.16 TON $3,250.00 $520.00
A1420 41102-0000 PRIME COAT
SEB Engineering Inc. dba Stewart Engineering Inc. $13.00 $5,070.00 Steelhead Constructors JV $4.00 $1,560.00 STPG Malcom JV LLC $3.00 $1,170.00 Engineer's Estimate 390 SQYD $3.00 $1,170.00
A1440 41201-0000 TACK COAT
SEB Engineering Inc. dba Stewart Engineering Inc. $1,100.00 $187.00 Steelhead Constructors JV $1,300.00 $221.00 STPG Malcom JV LLC $1,500.00 $255.00 Engineer's Estimate 0.17 TON $2,250.00 $382.50
A1460 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
SEB Engineering Inc. dba Stewart Engineering Inc. $4,163.00 $412,137.00 Steelhead Constructors JV $5,750.00 $569,250.00 STPG Malcom JV LLC $5,530.00 $547,470.00 Engineer's Estimate 99 CUYD $3,700.00 $366,300.00
7 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1480 55401-1000 REINFORCING STEEL (NORTH FORK FEATHER RIVER BRIDGE)
SEB Engineering Inc. dba Stewart Engineering Inc. $2.30 $9,200.00 Steelhead Constructors JV $2.50 $10,000.00 STPG Malcom JV LLC $2.90 $11,600.00 Engineer's Estimate 4,000 LB $5.00 $20,000.00
A1500 55401-2000 REINFORCING STEEL, EPOXY COATED
SEB Engineering Inc. dba Stewart Engineering Inc. $3.50 $67,200.00 Steelhead Constructors JV $3.50 $67,200.00 STPG Malcom JV LLC $3.10 $59,520.00 Engineer's Estimate 19,200 LB $5.00 $96,000.00
A1520 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED
SEB Engineering Inc. dba Stewart Engineering Inc. $7.20 $756,000.00 Steelhead Constructors JV $10.00 $1,050,000.00 STPG Malcom JV LLC $8.75 $918,750.00 Engineer's Estimate 105,000 LB $9.00 $945,000.00
A1540 55601-0900 BRIDGE RAILING, STEEL (OREGON DOT BR206 2-TUBE CURB MOUNTED RAIL)
SEB Engineering Inc. dba Stewart Engineering Inc. $694.00 $181,828.00 Steelhead Constructors JV $600.00 $157,200.00 STPG Malcom JV LLC $403.00 $105,586.00 Engineer's Estimate 262 LNFT $400.00 $104,800.00
A1560 56401-1000 BEARING DEVICE, ELASTOMERIC
SEB Engineering Inc. dba Stewart Engineering Inc. $4,700.00 $28,200.00 Steelhead Constructors JV $4,200.00 $25,200.00 STPG Malcom JV LLC $5,930.00 $35,580.00 Engineer's Estimate 6 EACH $4,000.00 $24,000.00
A1580 56501-0300 DRILLED SHAFT, 30-INCH DIAMETER
SEB Engineering Inc. dba Stewart Engineering Inc. $1,520.00 $437,760.00 Steelhead Constructors JV $1,500.00 $432,000.00 STPG Malcom JV LLC $2,000.00 $576,000.00 Engineer's Estimate 288 LNFT $2,800.00 $806,400.00
8 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1600 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
SEB Engineering Inc. dba Stewart Engineering Inc. $108.00 $9,720.00 Steelhead Constructors JV $350.00 $31,500.00 STPG Malcom JV LLC $325.00 $29,250.00 Engineer's Estimate 90 LNFT $115.00 $10,350.00
A1620 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
SEB Engineering Inc. dba Stewart Engineering Inc. $6,600.00 $26,400.00 Steelhead Constructors JV $8,600.00 $34,400.00 STPG Malcom JV LLC $8,070.00 $32,280.00 Engineer's Estimate 4 EACH $7,500.00 $30,000.00
A1640 61707-0000 STRUCTURE TRANSITION RAILING
SEB Engineering Inc. dba Stewart Engineering Inc. $670.00 $56,280.00 Steelhead Constructors JV $750.00 $63,000.00 STPG Malcom JV LLC $690.00 $57,960.00 Engineer's Estimate 84 LNFT $375.00 $31,500.00
A1660 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
SEB Engineering Inc. dba Stewart Engineering Inc. $300.00 $6,000.00 Steelhead Constructors JV $250.00 $5,000.00 STPG Malcom JV LLC $205.00 $4,100.00 Engineer's Estimate 20 HOUR $280.00 $5,600.00
A1680 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
SEB Engineering Inc. dba Stewart Engineering Inc. $270.00 $5,400.00 Steelhead Constructors JV $200.00 $4,000.00 STPG Malcom JV LLC $325.00 $6,500.00 Engineer's Estimate 20 HOUR $255.00 $5,100.00
A1700 62201-2050 ROLLER
SEB Engineering Inc. dba Stewart Engineering Inc. $335.00 $6,700.00 Steelhead Constructors JV $240.00 $4,800.00 STPG Malcom JV LLC $290.00 $5,800.00 Engineer's Estimate 20 HOUR $220.00 $4,400.00
9 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1720 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE
SEB Engineering Inc. dba Stewart Engineering Inc. $450.00 $9,000.00 Steelhead Constructors JV $300.00 $6,000.00 STPG Malcom JV LLC $440.00 $8,800.00 Engineer's Estimate 20 HOUR $330.00 $6,600.00
A1740 62201-3000 HYDRAULIC EXCAVATOR
SEB Engineering Inc. dba Stewart Engineering Inc. $120.00 $2,400.00 Steelhead Constructors JV $300.00 $6,000.00 STPG Malcom JV LLC $350.00 $7,000.00 Engineer's Estimate 20 HOUR $295.00 $5,900.00
A1760 62301-0000 GENERAL LABOR
SEB Engineering Inc. dba Stewart Engineering Inc. $57.00 $2,280.00 Steelhead Constructors JV $110.00 $4,400.00 STPG Malcom JV LLC $200.00 $8,000.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00
A1780 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
SEB Engineering Inc. dba Stewart Engineering Inc. $153.00 $3,060.00 Steelhead Constructors JV $270.00 $5,400.00 STPG Malcom JV LLC $380.00 $7,600.00 Engineer's Estimate 20 HOUR $265.00 $5,300.00
A1800 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
SEB Engineering Inc. dba Stewart Engineering Inc. $280.00 $5,600.00 Steelhead Constructors JV $275.00 $5,500.00 STPG Malcom JV LLC $380.00 $7,600.00 Engineer's Estimate 20 HOUR $260.00 $5,200.00
A1820 62405-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
SEB Engineering Inc. dba Stewart Engineering Inc. $13.00 $3,900.00 Steelhead Constructors JV $5.00 $1,500.00 STPG Malcom JV LLC $77.00 $23,100.00 Engineer's Estimate 300 SQYD $9.00 $2,700.00
10 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1840 62511-2000 SEEDING, HYDRAULIC METHOD
SEB Engineering Inc. dba Stewart Engineering Inc. $4.00 $3,400.00 Steelhead Constructors JV $5.00 $4,250.00 STPG Malcom JV LLC $16.00 $13,600.00 Engineer's Estimate 850 SQYD $4.00 $3,400.00
A1860 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
SEB Engineering Inc. dba Stewart Engineering Inc. $2.00 $1,700.00 Steelhead Constructors JV $2.00 $1,700.00 STPG Malcom JV LLC $21.00 $17,850.00 Engineer's Estimate 850 SQYD $5.00 $4,250.00
A1880 63301-0000 SIGN SYSTEM
SEB Engineering Inc. dba Stewart Engineering Inc. $1,500.00 $4,500.00 Steelhead Constructors JV $470.00 $1,410.00 STPG Malcom JV LLC $2,500.00 $7,500.00 Engineer's Estimate 3 EACH $965.00 $2,895.00
A1900 63309-0000 DELINEATOR
SEB Engineering Inc. dba Stewart Engineering Inc. $150.00 $150.00 Steelhead Constructors JV $310.00 $310.00 STPG Malcom JV LLC $1,875.00 $1,875.00 Engineer's Estimate 1 EACH $300.00 $300.00
A1920 63403-0200 PAVEMENT MARKINGS, TYPE B
SEB Engineering Inc. dba Stewart Engineering Inc. $350.00 $5,250.00 Steelhead Constructors JV $90.00 $1,350.00 STPG Malcom JV LLC $62.00 $930.00 Engineer's Estimate 15 SQFT $28.00 $420.00
A1940 63501-0000 TEMPORARY TRAFFIC CONTROL
SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $80,000.00 Steelhead Constructors JV Lump Sum $15,000.00 STPG Malcom JV LLC Lump Sum $137,200.00 Engineer's Estimate ALL LPSM Lump Sum $185,000.00
11 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
SEB Engineering Inc. dba Stewart Engineering Inc. $3,270,486.00 Steelhead Constructors JV $3,792,051.00 STPG Malcom JV LLC $4,211,274.46 Engineer's Estimate $3,980,000.00
12 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF23B000012
Division: Central Federal Lands
State: CA County: Plumas
Federal Land: Plumas National Forest Opened at: Lakewood, CO
Opened by: Eric Grosskreuz
Date: 09/28/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Steelhead Constructors JV $431,000.00 PO Box 536 Palo Cedro, CA 96073
STPG Malcom JV LLC $453,170.00 3700 Centerpoint Drive, Suite 8155 Anchorage, AK 99503
SEB Engineering Inc. dba Stewart Engineering Inc. $471,000.00 P.O. Box 990010 Redding, CA 96099
Engineer's Estimate $498,000.00
13 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1000 15101-0000 MOBILIZATION
Steelhead Constructors JV Lump Sum $187,000.00 STPG Malcom JV LLC Lump Sum $48,375.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $65,600.00
X1020 15214-1000 SURVEY AND STAKING, BRIDGE (INDIAN CREEK BRIDGE)
Steelhead Constructors JV Lump Sum $6,700.00 STPG Malcom JV LLC Lump Sum $3,600.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $7,500.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
X1040 15301-0000 CONTRACTOR QUALITY CONTROL
Steelhead Constructors JV Lump Sum $15,000.00 STPG Malcom JV LLC Lump Sum $41,445.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $65,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
X1060 15401-0000 CONTRACTOR TESTING
Steelhead Constructors JV Lump Sum $3,900.00 STPG Malcom JV LLC Lump Sum $7,200.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $2,000.00 Engineer's Estimate ALL LPSM Lump Sum $11,000.00
X1080 15501-0000 CONSTRUCTION SCHEDULE
Steelhead Constructors JV Lump Sum $2,200.00 STPG Malcom JV LLC Lump Sum $2,100.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
X1100 15701-0000 SOIL EROSION CONTROL (INDIAN CREEK BRIDGE)
Steelhead Constructors JV Lump Sum $1,300.00 STPG Malcom JV LLC Lump Sum $6,500.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $3,200.00 Engineer's Estimate ALL LPSM Lump Sum $22,000.00
14 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: CA ERFO FS PLMAS 2021-02(1)
Project Name: North Fork Feather River Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1120 20304-2000 REMOVAL OF BRIDGE (INDIAN CREEK BRIDGE)
Steelhead Constructors JV Lump Sum $25,000.00 STPG Malcom JV LLC Lump Sum $15,810.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $65,000.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00
X1140 55401-1000 REINFORCING STEEL (INDIAN CREEK BRIDGE)
Steelhead Constructors JV $12.00 $2,400.00 STPG Malcom JV LLC $50.00 $10,000.00 SEB Engineering Inc. dba Stewart Engineering Inc. $26.00 $5,200.00 Engineer's Estimate 200 LB $10.00 $2,000.00
X1160 55504-0000 PRE-FABRICATED STEEL BRIDGE
Steelhead Constructors JV Lump Sum $125,000.00 STPG Malcom JV LLC Lump Sum $295,100.00 SEB Engineering Inc. dba Stewart Engineering Inc. Lump Sum $176,300.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
X1180 60101-0000 CONCRETE
Steelhead Constructors JV $30,000.00 $60,000.00 STPG Malcom JV LLC $9,520.00 $19,040.00 SEB Engineering Inc. dba Stewart Engineering Inc. $32,300.00 $64,600.00 Engineer's Estimate 2 CUYD $10,000.00 $20,000.00
X1200 62301-0000 GENERAL LABOR (INDIAN CREEK BRIDGE)
Steelhead Constructors JV $125.00 $2,500.00 STPG Malcom JV LLC $200.00 $4,000.00 SEB Engineering Inc. dba Stewart Engineering Inc. $110.00 $2,200.00 Engineer's Estimate 20 HOUR $120.00 $2,400.00
Total Schedule - All Items
Steelhead Constructors JV $431,000.00 STPG Malcom JV LLC $453,170.00 SEB Engineering Inc. dba Stewart Engineering Inc. $471,000.00 Engineer's Estimate $498,000.00