FMD-Roofing Repair 77 N, Front St. Gutter Lining
Solicitation number
RFQ033213
Issued by
Franklin County, Columbus City, Ohio

About this file

This is a Request for Quotation (RFQ) issued by the City of Columbus Division of Facilities Management for gutter lining services at 77 North Front Street in Columbus, Ohio. The project involves complete gutter surface preparation to manufacturer specifications, full adhesion of white Thermoplastic Polyolefin (TPO) material into the internal gutter and over the edge of the gutter system, and installation of flashing and termination bars to seal all edges. The scope covers approximately 625 linear feet of gutter work. A mandatory walkthrough is scheduled for 8:00 AM on Tuesday, July 14 at the project site. Contractors must submit bids online through the designated submission portal.

Contractors are responsible for providing all necessary labor, materials, tools, and equipment to complete the work, obtaining any required permits prior to work commencement, and adhering to all City of Columbus Construction and Materials Specifications safety requirements. All measurements and quantities must be verified by the contractor, and daily debris removal is mandatory with disposal off-site (City dumpsters prohibited). Contractor employees must pass local, state, and federal background checks covering a ten-year period or from age nineteen onward, with the City providing the background check to be submitted after contract execution. Contractors must provide a one-year workmanship guarantee on all completed work and are liable for any damage caused by employee negligence. Questions regarding the RFQ should be directed to Brad Bayliff at babavliff@columbus.gov.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Columbus

Division of Facilities Management

Request for Quotation (RFQ)

77 N. Front St. Gutter Lining with Thermoplastic Polyolefin

1. Completely prep. gutter surface (to manufacture’s spec.)

2. Fully adhere TPO material into internal and over edge of gutter system (white TPO)

3. Fully flash in TPO and install Termination bars sealing all edges

Walk through will be 8am Tuesday 07/14 at 77 N. Front St.

Miscellaneous

1. Contractor shall provide all necessary labor, material, tools, and equipment to complete the scope of work for this bid.

2. Contractor shall be held responsible for any damage or abuse caused by the negligence of his/her employees.. Contractor is responsible for proper use of the building and equipment.

3. All measurements and quantities are the responsibility of the contractor. Any/all permits if necessary are to be obtained by contractor prior to starting any work.

4. The contractor is responsible for following all safety requirements of the City of

Columbus Construction and Materials Specifications.

5. Contractor will give a one year workmanship Guarantee on all work.

6. Contractor is responsible to keep area(s) clean of debris and are responsible for removal of all debris and excess materials on a daily basis. The use of City of Columbus dumpsters will not be permitted.

7. Contractor's employees must clear a local/state/federal background check covering 10 year period or beginning at 19 years of age . Background check provided by the City of

Columbus - to be turned over to CA after contract has been signed at contract start

Questions should be sent to Brad Bayliff at babavliff@columbus.gov.

Approximately 625 ft.