C-1 RFQ 1240BK24Q0117.pdf
PDF 2 MB Posted
- Attached to
- Solar PV O&M, Inspection, and Meter Reading
- Solicitation number
- 1240BK24Q0117
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Request for Quotes (RFQ) for Solar PV Operation and Maintenance, Inspection, and Meter Reading services for the United States Forest Service (USFS) Region 6 Oregon National Forests.
The scope of the contract includes providing all necessary staff, supplies, materials, and equipment to perform Solar PV system inspections, production meter reading, module cleaning, and remote sensing equipment/services for multiple Solar PV systems located in Oregon. The contract has a base period from 9/16/2024 to 9/15/2025 with four one-year option periods. Quotes are due by 1300 PT on 9/6/2024 and should be submitted via email to the Contracting Officer, Eric Oldenkamp. Pricing is to be provided on the attached schedule of items spreadsheet. The Government intends to award this requirement on a competitive basis under simplified acquisition procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-2 Project Locations.xlsx | XLSX spreadsheet | |
| C-2 Schedule of Items.xlsx | XLSX spreadsheet | |
| C-2 Attachment - Evaluation Factors and Provisions.docx | DOCX document | |
| C-3 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Forest Service
Procurement & Property Services
Solar PV Inspection, Production Meter Reading, and Remote Sensing
U.S. Depart of Agriculture, United States Forest Service, Region 6 Oregon National Forests
Solicitation Number: 1240BK24Q0117
Quotes Due: 6 September 2024
Contracting Officer: Eric Oldenkamp (eric.oldenkamp@usda.gov)
Interested companies that wish to submit a quote must follow the instructions in the addendum of Federal Acquisition Regulation (FAR) provision 52.212-1, which is included in this solicitation.
mailto:eric.oldenkamp@usda.gov
Table of Contents
Standard Form 1449/ Schedule of Items
Contract Clauses
Statement of Work
Solicitation Provisions
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
40BK
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 1
04H1 CODE 16. ADMINISTERED BYCODE
X
X
X
238210
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR40BK
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
09/06/2024 1300 PT
08/09/2024
ERIC OLDENKAMP
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
1240BK24Q0117
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
3 50 1130584OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
PORTLAND OR 97201
1220 SW 3RD AVE
REGIONAL FORESTER R6
USDA FOREST SERVICE
15. DELIVER TO
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$19
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
USDA-FS CSA NORTHWEST 1
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 09/16/2024 to 09/15/2029
0001 Solar PV inspection including travel - R6 1 EA Deschutes Scott Warehouse
Delivery: 09/15/2025 Period of Performance: 09/16/2024 to 09/15/2025
0002 Solar PV inspection including travel - R6 1 EA Deschutes Scott Auto Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0003 Solar PV inspection including travel - R6 1 EA
Deschutes HQ Equip
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0004 Solar PV inspection including travel - R6 1 EA
Deschutes HQ Admin
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0005 Solar PV inspection including travel - R6 1 EA
Deschutes HQ Seed (Combined)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0006 Solar PV inspection including travel - R6 Umpqua 1 EA
- Toketee - Tree Cooler
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0007 Solar PV inspection including travel - R6 Umpqua 1 EA
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
26 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
- Toketee - Fire Station
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0008 Solar PV inspection including travel - R6 Ukiah 1 EA
NFJD Bunkhouse
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0009 Solar PV inspection including travel - R6 Ukiah 1 EA
NFJD Tree Cooler
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0010 Solar PV inspection including travel - R6 Central 1 EA
Point - JHSN
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0011 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0012 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0013 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0014 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes HQ Admin
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
4 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0015 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0016 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0017 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0018 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0019 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0020 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0021 OPTIONAL ITEM: Solar PV install remote sensing 1 EA
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
5 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
equipment including travel - R6 Deschutes Scott
Warehouse
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0022 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes Scott
Auto
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0023 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0024 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0025 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes HQ Seed
(Combined)
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0026 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Umpqua - Toketee
- Tree Cooler
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0027 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Umpqua - Toketee
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
6 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
- Fire Station
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0028 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Ukiah NFJD
Bunkhouse
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0029 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Ukiah NFJD Tree
Cooler
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
0030 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Central Point -
JHSN
(Option Line Item)
Delivery: 09/15/2025
Period of Performance: 09/16/2024 to 09/15/2025
1001 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1002 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1003 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
7 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1004 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1005 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1006 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1007 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1008 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1009 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1010 OPTION YEAR 1: Solar PV inspection including 1 EA
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
8 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
travel - R6 Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1011 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Warehouse
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1012 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Auto
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1013 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1014 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1015 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed
(Combined)
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1016 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
9 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1017 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Fire Station
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1018 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1019 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree
Cooler
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1020 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -
JHSN
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1021 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1022 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
10 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1023 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1024 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1025 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1026 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1027 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1028 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
11 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
remote sensing equipment including travel - R6
Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1029 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
1030 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2026
Period of Performance: 09/16/2025 to 09/15/2026
2001 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2002 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2003 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2004 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
12 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2005 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2006 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2007 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2008 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2009 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2010 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2011 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
13 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
cleaning including travel - R6 Deschutes Scott
Warehouse
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2012 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Auto
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2013 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2014 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2015 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed
(Combined)
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2016 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2017 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
14 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Fire Station
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2018 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2019 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree
Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2020 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -
JHSN
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2021 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2022 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2023 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
15 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
remote sensing equipment including travel - R6
Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2024 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2025 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2026 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2027 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2028 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
16 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
2029 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
2030 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2027
Period of Performance: 09/16/2026 to 09/15/2027
3001 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3002 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3003 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3004 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3005 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
17 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3006 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3007 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3008 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3009 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3010 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3011 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Warehouse
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
18 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
3012 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Auto
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3013 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3014 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3015 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed
(Combined)
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3016 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3017 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Fire Station
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3018 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
19 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3019 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree
Cooler
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3020 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -
JHSN
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3021 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3022 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3023 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
20 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
3024 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3025 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3026 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3027 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3028 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
3029 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
21 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
3030 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2028
Period of Performance: 09/16/2027 to 09/15/2028
4001 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4002 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4003 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4004 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4005 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4006 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
22 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4007 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4008 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4009 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4010 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4011 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Warehouse
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4012 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott
Auto
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
23 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
4013 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4014 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4015 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed
(Combined)
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4016 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4017 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Fire Station
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4018 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -
Tree Cooler
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
24 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
4019 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree
Cooler
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4020 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -
JHSN
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4021 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Warehouse
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4022 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes Scott Auto
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4023 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Equip
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4024 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Admin
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
25 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
4025 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Deschutes HQ Seed (Combined)
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4026 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Tree Cooler
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4027 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Umpqua - Toketee - Fire Station
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4028 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Bunkhouse
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4029 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Ukiah NFJD Tree Cooler
(Option Line Item)
Delivery: 09/15/2029
Period of Performance: 09/16/2028 to 09/15/2029
4030 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6
Central Point - JHSN
(Option Line Item)
Delivery: 09/15/2029
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
26 26
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BK24Q0117
Period of Performance: 09/16/2028 to 09/15/2029
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
CONTRACT CLAUSES
Full text clauses and provisions for the Federal Acquisition Regulation (FAR) and Agriculture Acquisition Regulation (AGAR) may be accessed electronically at www.aquisition.gov.
THE FOLLOWING CLAUSE IS INCORPORATED BY REFERENCE:
FAR 52.212-4 -- Contract Terms and Conditions – Commercial Products and Commercial Services (Nov 2023)
THE FOLLOWING CLAUSES ARE ADDED AS AN ADDENDUM TO FAR CLAUSE
52.212-4, AND INCORPORATED BY REFERENCE:
FAR 52.203-3 -- Gratuities (Apr 1984)
FAR 52.203-12 -- Limitation on Payments to Influence Certain Federal Transactions (Jun 2020)
FAR 52.203-17 -- Contractor Employee Whistleblower Rights (Jun 2020)
FAR 52.204-9 -- Personal Identity Verification of Contractor Personnel (Jan 2011)
FAR 52.204-13 -- System for Award Management Maintenance (Oct 2018)
FAR 52.204-18 -- Commercial and Government Entity Code Maintenance (Aug 2020)
FAR 52.232-40 -- Providing Accelerated Payments to Small Business Subcontractors (Nov 2021)
FAR 52.237-2 -- Protection of Government Buildings, Equipment, and Vegetation (Apr 1984)
THE FOLLOWING CLAUSES ARE INCORPORATED IN FULL TEXT:
FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services (May 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) FAR 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) FAR 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(3) FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115- 232).
(4) FAR 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV
2015).
(5) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) FAR 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) FAR 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
☒ (1) FAR 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
☐ (2) FAR 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509)).
☐ (3) FAR 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
☒ (4) FAR 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C.
4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
☒ (5) FAR 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
☐ (6) [Reserved].
☒ (7) FAR 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-
117, section 743 of Div. C).
☐ (8) FAR 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
☐ (9) FAR 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section
102 of Division R of Pub. L. 117-328).
☐ (10) FAR 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal
Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts.
(Dec 2023) (Pub. L. 115–390, title II)
☐ (11)(i) FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders— Prohibition (Dec 2023) (Pub. L. 115–390, title II)
☐ (ii) Alternate I (Dec 2023) of FAR 52.204-30.
☒ (12) FAR 52.209-6, Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C.
6101 note).
☐ (13) FAR 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
☐ (14) [Reserved].
☐ (15) FAR 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15
U.S.C. 657a).
☐ (16) FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
☐ (17) [Reserved] ☒ (18) (i) FAR 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C.
644).
☐ (ii) Alternate I (Mar 2020) of FAR 52.219-6.
☐ (19) (i) FAR 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C.
644).
☐ (ii) Alternate I (Mar 2020) of FAR 52.219-7.
☒ (20) FAR 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C.
637(d)(2) and (3)).
☐ (21) (i) FAR 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).
☐ (ii) Alternate I (Nov 2016) of FAR 52.219-9.
☐ (iii) Alternate II (Nov 2016) of FAR 52.219-9.
☐ (iv) Alternate III (Jun 2020) of FAR 52.219-9.
☐ (v) Alternate IV (Sep 2023) of FAR 52.219-9.
☐ (22) (i) FAR 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
☐ (ii) Alternate I (MAR 2020) of FAR 52.219-13.
☒ (23) FAR 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637s).
[Contracting Officer check as appropriate.] ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or
☐ By the end of the performance period for each order issued under the contract.
☐ (24) FAR 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C.
637(d)(4)(F)(i)).
☐ (25) FAR 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).
☒ (26) (i) FAR 52.219-28, Post Award Small Business Program Rerepresentation (FEB 2024) (15 U.S.C. 632(a)(2)).
☐ (ii) Alternate I (MAR 2020) of FAR 52.219-28.
☐ (27) FAR 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).
☐ (28) FAR 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m).
☐ (29) FAR 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
☐ (30) FAR 52.219-33, Nonmanufacturer Rule (SEP 2021) (15U.S.C. 637(a)(17)).
☒ (31) FAR 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
☐ (32) FAR 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB
2024).[ ☐ (33) FAR 52.222-21, Prohibition of Segregated Facilities (APR 2015).
☒ (34) (i) FAR 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).
☐ (ii) Alternate I (FEB 1999) of FAR 52.222-26.
☒ (35) (i) FAR 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
☐ (ii) Alternate I (JUL 2014) of FAR 52.222-35.
☒ (36) (i) FAR 52.222-36, Equal Opportunity for Workers with Disabilities (JUN
2020) (29 U.S.C. 793).
☐ (ii) Alternate I (Jul 2014) of FAR 52.222-36.
☒ (37) FAR 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
☒ (38) FAR 52.222-40, Notification of Employee Rights Under the National Labor Relations
Act (Dec 2010) (E.O. 13496).
☒ (39) (i) FAR 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter
78 and E.O. 13627).
☐ (ii) Alternate I (Mar 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).
☒ (40) FAR 52.222-54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
☐ (41) (i) FAR 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (ii) Alternate I (MAY 2008) of FAR 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (42) FAR 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) (42 U.S.C. 7671, et seq.).
☐ (43) FAR 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) (42 U.S.C. 7671, et seq.).
☐ (44) FAR 52.223-20, Aerosols (MAY 2024) (42 U.S.C. 7671, et seq.).
☐ (45) FAR 52.223-21, Foams (MAY 2024) (42 U.S.C. 7671, et seq.).
☐ (46) FAR 52.223-23, Sustainable Products and Services (MAY 2024) (E.O. 14057, 7
U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).
☐ (47) (i) FAR 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).
☐ (ii) Alternate I (Jan 2017) of FAR 52.224-3.
☐ (48) (i) FAR 52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 83).
☐ (ii) Alternate I (Oct 2022) of 52.225-1 ☐ (49) (i) FAR 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV
2023) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
☐(ii) Alternate I [Reserved] ☐(iii) Alternate II (DEC 2022) of FAR 52.225-3.
☐(iv) Alternate III (FEB 2024) of FAR 52.225-3.
☐(v) Alternate IV (OCT 2022) of FAR 52.225-3.
☐ (50) FAR 52.225-5, Trade Agreements (NOV 2023) (19 U.S.C. 2501, et seq., 19 U.S.C.
3301 note).
☐ (51) FAR 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
☐ (52) FAR 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
☐ (53) FAR 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
☐ (54) FAR 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area
(NOV 2007) (42 U.S.C. 5150).
☒ (55) FAR 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513).
☐ (56) FAR 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
☐ (57) FAR 52.232-29, Terms for Financing of Purchases of Commercial Products and
Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
☐ (58) FAR 52.232-30, Installment Payments for Commercial Products and Commercial
Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
☒ (59) FAR 52.232-33, Payment by Electronic Funds Transfer-System for Award
Management (OCT2018) (31 U.S.C. 3332).
☐ (60) FAR 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (Jul 2013) (31 U.S.C. 3332).
☐ (61) FAR 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
☐ (62) FAR 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
☐ (63) FAR 52.242-5, Payments to Small Business Subcontractors (JAN
2017) (15 U.S.C. 637(d)(13)).
☐ (64) (i) FAR 52.247-64, Preference for Privately Owned U.S.-Flag Commercial
Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).
☐ (ii) Alternate I (Apr 2003) of FAR 52.247-64.
☐ (iii) Alternate II (Nov 2021) of FAR 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .