C-1 RFQ 1240BK24Q0117.pdf

PDF 2 MB Posted

Attached to
Solar PV O&M, Inspection, and Meter Reading
Solicitation number
1240BK24Q0117
Issued by

About this file

This document is a Request for Quotes (RFQ) for Solar PV Operation and Maintenance, Inspection, and Meter Reading services for the United States Forest Service (USFS) Region 6 Oregon National Forests.

The scope of the contract includes providing all necessary staff, supplies, materials, and equipment to perform Solar PV system inspections, production meter reading, module cleaning, and remote sensing equipment/services for multiple Solar PV systems located in Oregon. The contract has a base period from 9/16/2024 to 9/15/2025 with four one-year option periods. Quotes are due by 1300 PT on 9/6/2024 and should be submitted via email to the Contracting Officer, Eric Oldenkamp. Pricing is to be provided on the attached schedule of items spreadsheet. The Government intends to award this requirement on a competitive basis under simplified acquisition procedures.

View the file

Other files

File Type Posted
C-2 Project Locations.xlsx XLSX spreadsheet
C-2 Schedule of Items.xlsx XLSX spreadsheet
C-2 Attachment - Evaluation Factors and Provisions.docx DOCX document
C-3 Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Forest Service

Procurement & Property Services

Solar PV Inspection, Production Meter Reading, and Remote Sensing

U.S. Depart of Agriculture, United States Forest Service, Region 6 Oregon National Forests

Solicitation Number: 1240BK24Q0117

Quotes Due: 6 September 2024

Contracting Officer: Eric Oldenkamp (eric.oldenkamp@usda.gov)

Interested companies that wish to submit a quote must follow the instructions in the addendum of Federal Acquisition Regulation (FAR) provision 52.212-1, which is included in this solicitation.

mailto:eric.oldenkamp@usda.gov

Table of Contents

Standard Form 1449/ Schedule of Items

Contract Clauses

Statement of Work

Solicitation Provisions

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

40BK

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 1

04H1 CODE 16. ADMINISTERED BYCODE

X

X

X

238210

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR40BK

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

09/06/2024 1300 PT

08/09/2024

ERIC OLDENKAMP

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1240BK24Q0117

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

3 50 1130584OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

PORTLAND OR 97201

1220 SW 3RD AVE

REGIONAL FORESTER R6

USDA FOREST SERVICE

15. DELIVER TO

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$19

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS CSA NORTHWEST 1

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Period of Performance: 09/16/2024 to 09/15/2029

0001 Solar PV inspection including travel - R6 1 EA Deschutes Scott Warehouse

Delivery: 09/15/2025 Period of Performance: 09/16/2024 to 09/15/2025

0002 Solar PV inspection including travel - R6 1 EA Deschutes Scott Auto Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0003 Solar PV inspection including travel - R6 1 EA

Deschutes HQ Equip

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0004 Solar PV inspection including travel - R6 1 EA

Deschutes HQ Admin

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0005 Solar PV inspection including travel - R6 1 EA

Deschutes HQ Seed (Combined)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0006 Solar PV inspection including travel - R6 Umpqua 1 EA

- Toketee - Tree Cooler

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0007 Solar PV inspection including travel - R6 Umpqua 1 EA

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

26 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

- Toketee - Fire Station

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0008 Solar PV inspection including travel - R6 Ukiah 1 EA

NFJD Bunkhouse

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0009 Solar PV inspection including travel - R6 Ukiah 1 EA

NFJD Tree Cooler

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0010 Solar PV inspection including travel - R6 Central 1 EA

Point - JHSN

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0011 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0012 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0013 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0014 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes HQ Admin

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

4 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0015 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0016 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0017 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0018 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0019 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0020 OPTIONAL ITEM: Solar PV module cleaning including 1 EA travel - R6 Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0021 OPTIONAL ITEM: Solar PV install remote sensing 1 EA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

5 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

equipment including travel - R6 Deschutes Scott

Warehouse

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0022 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes Scott

Auto

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0023 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0024 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0025 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Deschutes HQ Seed

(Combined)

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0026 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Umpqua - Toketee

- Tree Cooler

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0027 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Umpqua - Toketee

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

6 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

- Fire Station

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0028 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Ukiah NFJD

Bunkhouse

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0029 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Ukiah NFJD Tree

Cooler

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

0030 OPTIONAL ITEM: Solar PV install remote sensing 1 EA equipment including travel - R6 Central Point -

JHSN

(Option Line Item)

Delivery: 09/15/2025

Period of Performance: 09/16/2024 to 09/15/2025

1001 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1002 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1003 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

7 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1004 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1005 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1006 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1007 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1008 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1009 OPTION YEAR 1: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1010 OPTION YEAR 1: Solar PV inspection including 1 EA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

8 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

travel - R6 Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1011 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Warehouse

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1012 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Auto

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1013 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1014 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1015 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed

(Combined)

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1016 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

9 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1017 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Fire Station

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1018 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1019 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree

Cooler

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1020 OPTION YEAR 1 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -

JHSN

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1021 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1022 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

10 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1023 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1024 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1025 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1026 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1027 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1028 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

11 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

remote sensing equipment including travel - R6

Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1029 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

1030 OPTION YEAR 1 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2026

Period of Performance: 09/16/2025 to 09/15/2026

2001 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2002 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2003 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2004 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

12 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2005 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2006 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2007 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2008 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2009 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2010 OPTION YEAR 2: Solar PV inspection including 1 EA travel - R6 Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2011 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

13 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

cleaning including travel - R6 Deschutes Scott

Warehouse

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2012 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Auto

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2013 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2014 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2015 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed

(Combined)

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2016 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2017 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

14 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Fire Station

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2018 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2019 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree

Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2020 OPTION YEAR 2 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -

JHSN

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2021 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2022 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2023 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

15 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

remote sensing equipment including travel - R6

Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2024 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2025 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2026 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2027 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2028 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

16 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

2029 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

2030 OPTION YEAR 2 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2027

Period of Performance: 09/16/2026 to 09/15/2027

3001 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3002 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3003 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3004 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3005 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

17 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3006 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3007 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3008 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3009 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3010 OPTION YEAR 3: Solar PV inspection including 1 EA travel - R6 Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3011 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Warehouse

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

18 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

3012 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Auto

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3013 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3014 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3015 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed

(Combined)

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3016 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3017 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Fire Station

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3018 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

19 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3019 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree

Cooler

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3020 OPTION YEAR 3 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -

JHSN

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3021 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3022 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3023 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

20 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

3024 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3025 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3026 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3027 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3028 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

3029 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

21 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

3030 OPTION YEAR 3 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2028

Period of Performance: 09/16/2027 to 09/15/2028

4001 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4002 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4003 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4004 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4005 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4006 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Tree Cooler

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

22 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4007 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4008 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4009 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4010 OPTION YEAR 4: Solar PV inspection including 1 EA travel - R6 Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4011 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Warehouse

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4012 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes Scott

Auto

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

23 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

4013 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4014 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4015 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Deschutes HQ Seed

(Combined)

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4016 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4017 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Fire Station

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4018 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Umpqua - Toketee -

Tree Cooler

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

24 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

4019 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Ukiah NFJD Tree

Cooler

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4020 OPTION YEAR 4 OPTIONAL ITEM: Solar PV module 1 EA cleaning including travel - R6 Central Point -

JHSN

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4021 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Warehouse

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4022 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes Scott Auto

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4023 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Equip

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4024 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Admin

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

25 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

4025 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Deschutes HQ Seed (Combined)

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4026 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Tree Cooler

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4027 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Umpqua - Toketee - Fire Station

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4028 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Bunkhouse

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4029 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Ukiah NFJD Tree Cooler

(Option Line Item)

Delivery: 09/15/2029

Period of Performance: 09/16/2028 to 09/15/2029

4030 OPTION YEAR 4 OPTIONAL ITEM: Solar PV install 1 EA remote sensing equipment including travel - R6

Central Point - JHSN

(Option Line Item)

Delivery: 09/15/2029

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

26 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BK24Q0117

Period of Performance: 09/16/2028 to 09/15/2029

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

CONTRACT CLAUSES

Full text clauses and provisions for the Federal Acquisition Regulation (FAR) and Agriculture Acquisition Regulation (AGAR) may be accessed electronically at www.aquisition.gov.

THE FOLLOWING CLAUSE IS INCORPORATED BY REFERENCE:

FAR 52.212-4 -- Contract Terms and Conditions – Commercial Products and Commercial Services (Nov 2023)

THE FOLLOWING CLAUSES ARE ADDED AS AN ADDENDUM TO FAR CLAUSE

52.212-4, AND INCORPORATED BY REFERENCE:

FAR 52.203-3 -- Gratuities (Apr 1984)

FAR 52.203-12 -- Limitation on Payments to Influence Certain Federal Transactions (Jun 2020)

FAR 52.203-17 -- Contractor Employee Whistleblower Rights (Jun 2020)

FAR 52.204-9 -- Personal Identity Verification of Contractor Personnel (Jan 2011)

FAR 52.204-13 -- System for Award Management Maintenance (Oct 2018)

FAR 52.204-18 -- Commercial and Government Entity Code Maintenance (Aug 2020)

FAR 52.232-40 -- Providing Accelerated Payments to Small Business Subcontractors (Nov 2021)

FAR 52.237-2 -- Protection of Government Buildings, Equipment, and Vegetation (Apr 1984)

THE FOLLOWING CLAUSES ARE INCORPORATED IN FULL TEXT:

FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services (May 2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) FAR 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) FAR 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).

(3) FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115- 232).

(4) FAR 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV

2015).

(5) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) FAR 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) FAR 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

☒ (1) FAR 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

☐ (2) FAR 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509)).

☐ (3) FAR 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

☒ (4) FAR 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C.

4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

☒ (5) FAR 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

☐ (6) [Reserved].

☒ (7) FAR 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-

117, section 743 of Div. C).

☐ (8) FAR 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

☐ (9) FAR 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section

102 of Division R of Pub. L. 117-328).

☐ (10) FAR 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal

Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts.

(Dec 2023) (Pub. L. 115–390, title II)

☐ (11)(i) FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders— Prohibition (Dec 2023) (Pub. L. 115–390, title II)

☐ (ii) Alternate I (Dec 2023) of FAR 52.204-30.

☒ (12) FAR 52.209-6, Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C.

6101 note).

☐ (13) FAR 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

☐ (14) [Reserved].

☐ (15) FAR 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15

U.S.C. 657a).

☐ (16) FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business

Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

☐ (17) [Reserved] ☒ (18) (i) FAR 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C.

644).

☐ (ii) Alternate I (Mar 2020) of FAR 52.219-6.

☐ (19) (i) FAR 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C.

644).

☐ (ii) Alternate I (Mar 2020) of FAR 52.219-7.

☒ (20) FAR 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C.

637(d)(2) and (3)).

☐ (21) (i) FAR 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).

☐ (ii) Alternate I (Nov 2016) of FAR 52.219-9.

☐ (iii) Alternate II (Nov 2016) of FAR 52.219-9.

☐ (iv) Alternate III (Jun 2020) of FAR 52.219-9.

☐ (v) Alternate IV (Sep 2023) of FAR 52.219-9.

☐ (22) (i) FAR 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

☐ (ii) Alternate I (MAR 2020) of FAR 52.219-13.

☒ (23) FAR 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637s).

[Contracting Officer check as appropriate.] ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or

☐ By the end of the performance period for each order issued under the contract.

☐ (24) FAR 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C.

637(d)(4)(F)(i)).

☐ (25) FAR 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).

☒ (26) (i) FAR 52.219-28, Post Award Small Business Program Rerepresentation (FEB 2024) (15 U.S.C. 632(a)(2)).

☐ (ii) Alternate I (MAR 2020) of FAR 52.219-28.

☐ (27) FAR 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

☐ (28) FAR 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m).

☐ (29) FAR 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

☐ (30) FAR 52.219-33, Nonmanufacturer Rule (SEP 2021) (15U.S.C. 637(a)(17)).

☒ (31) FAR 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

☐ (32) FAR 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB

2024).[ ☐ (33) FAR 52.222-21, Prohibition of Segregated Facilities (APR 2015).

☒ (34) (i) FAR 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

☐ (ii) Alternate I (FEB 1999) of FAR 52.222-26.

☒ (35) (i) FAR 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

☐ (ii) Alternate I (JUL 2014) of FAR 52.222-35.

☒ (36) (i) FAR 52.222-36, Equal Opportunity for Workers with Disabilities (JUN

2020) (29 U.S.C. 793).

☐ (ii) Alternate I (Jul 2014) of FAR 52.222-36.

☒ (37) FAR 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

☒ (38) FAR 52.222-40, Notification of Employee Rights Under the National Labor Relations

Act (Dec 2010) (E.O. 13496).

☒ (39) (i) FAR 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter

78 and E.O. 13627).

☐ (ii) Alternate I (Mar 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).

☒ (40) FAR 52.222-54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

☐ (41) (i) FAR 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

☐ (ii) Alternate I (MAY 2008) of FAR 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

☐ (42) FAR 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) (42 U.S.C. 7671, et seq.).

☐ (43) FAR 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) (42 U.S.C. 7671, et seq.).

☐ (44) FAR 52.223-20, Aerosols (MAY 2024) (42 U.S.C. 7671, et seq.).

☐ (45) FAR 52.223-21, Foams (MAY 2024) (42 U.S.C. 7671, et seq.).

☐ (46) FAR 52.223-23, Sustainable Products and Services (MAY 2024) (E.O. 14057, 7

U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

☐ (47) (i) FAR 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).

☐ (ii) Alternate I (Jan 2017) of FAR 52.224-3.

☐ (48) (i) FAR 52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 83).

☐ (ii) Alternate I (Oct 2022) of 52.225-1 ☐ (49) (i) FAR 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV

2023) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

☐(ii) Alternate I [Reserved] ☐(iii) Alternate II (DEC 2022) of FAR 52.225-3.

☐(iv) Alternate III (FEB 2024) of FAR 52.225-3.

☐(v) Alternate IV (OCT 2022) of FAR 52.225-3.

☐ (50) FAR 52.225-5, Trade Agreements (NOV 2023) (19 U.S.C. 2501, et seq., 19 U.S.C.

3301 note).

☐ (51) FAR 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

☐ (52) FAR 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

☐ (53) FAR 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

☐ (54) FAR 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(NOV 2007) (42 U.S.C. 5150).

☒ (55) FAR 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513).

☐ (56) FAR 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

☐ (57) FAR 52.232-29, Terms for Financing of Purchases of Commercial Products and

Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

☐ (58) FAR 52.232-30, Installment Payments for Commercial Products and Commercial

Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

☒ (59) FAR 52.232-33, Payment by Electronic Funds Transfer-System for Award

Management (OCT2018) (31 U.S.C. 3332).

☐ (60) FAR 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award

Management (Jul 2013) (31 U.S.C. 3332).

☐ (61) FAR 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

☐ (62) FAR 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

☐ (63) FAR 52.242-5, Payments to Small Business Subcontractors (JAN

2017) (15 U.S.C. 637(d)(13)).

☐ (64) (i) FAR 52.247-64, Preference for Privately Owned U.S.-Flag Commercial

Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).

☐ (ii) Alternate I (Apr 2003) of FAR 52.247-64.

☐ (iii) Alternate II (Nov 2021) of FAR 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .