BVY ATCT Roof and HVAC Unit Replacement Drawings.pdf

PDF 3 MB Posted

Attached to
BVY ATCT Roof and HVAC Unit Replacement Federal contract opportunity
Solicitation number
2402506
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a pre-solicitation market survey for the replacement of the roof and HVAC unit at the Beverly, Massachusetts Air Traffic Control Tower (BVY ATCT). The Federal Aviation Administration (FAA) is conducting market research to gather information from interested vendors to assist with acquisition planning and determine the appropriate procurement method, which may involve a full and open competition or a set-aside for small businesses, service-disabled veteran-owned small businesses, or 8(a) firms.

The FAA is seeking capability statements from interested vendors, not to exceed 6 pages, that provide details on the types of services offered, previous contract experience, number of years in business, and contact information. Vendors certified as service-disabled veteran-owned small businesses or 8(a) firms should provide a copy of their certification. Responses are due by April 23, 2024. The FAA will not pay for any costs associated with the market survey submission. The FAA has not determined the competition type or whether this will be a small business set-aside. There is no incumbent contractor for this requirement.

View the file

Other files for this federal contract opportunity

Other files attached to BVY ATCT Roof and HVAC Unit Replacement, newest first.
File Type Posted
SOW BVY ATCT Roof and HVAC Unit Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

DATE

REDLINE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DRAWING NO

DESIGNED

REVIEWED BY

/3

/2

:4

:0

P

M lo tt e d b y S

R V

-C

-E

O

APPROVED

v

-2

-g

.d w g

8 234567

T OF TRANSPO

T A T

IO

N

IC

OF

STATES

U

IT

P A

TM

EN

AVIA

LA

TRAT

SI

NI

HVAC AND ROOF REPLACEMENT

AIR TRAFFIC CONTROL TOWER (ATCT)

BEVERLY REGIONAL AIRPORT

BEVERLY, MASSACHUSETTS

ATCT BASE BUILDING

SIDEWALK

DRAWING INDEX

DRAWING NO. DRAWING TITLE

BVY-21005020-GOO1 COVER SHEET & INDEX SHEET

ROOF REPAIRS

ELECTRICAL ONE LINE DIAGRAM

ELECTRICAL PANEL SCHEDULE

MECHANICAL HVAC SCHEDULE

MECHANICAL DUCTWORK DETAILS

MECHANICAL HVAC DETAILS

BVY-21005020-C001

BVY-21005020-E001

BVY-21005020-E002

BVY-21005020-M001

BVY-21005020-M002

BVY-21005020-M003

CIVIL DEMOLITIONBVY-21005020-D001

MECHANICAL DEMOLITIONBVY-21005020-D002

HVAC AND VIBRATION CURBBVY-21005020-S001

BVY-21005020-GOO2 GENERAL NOTES

VIBRATION CURB CUTSHEET

BASE BUILDING AS-BUILTS

BASE BUIDLING ROOFTOP HVAC DETAILS

BVY-21005020-M004

BVY-21005020-M005

BVY-21005020-M006

NOT TO SCALE

SITE PLAN

IS

01/26/2024

MGR: ENGINEERING CENTER

BEVERLY

BVY-21005020-G001

SP

ATCT

HVAC REPLACEMENT AND ROOF REHAB PROJECT

COVER SHEET & INDEX SHEET

OPS INFRASTRUCTURE

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

BEVERLY MUNICIPAL AIRPORT

THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM

PROJECT ENGINEER

21005020

MA

bvy-21005020-g001

2024-01-31T06:14:31-0500

HENRY B NEWCOMB

2024-01-30T13:55:55-0500

SHREY B PATEL

FILLER FOR NOW

:2 lo tt e

SUBTITLE REFERENCE

SCALE

ELEVATION CALLOUT REFERENCE

ELEVATION REFERENCE LETTER

SECTION REFERENCE LETTER

DETAIL REFERENCE NUMBER

DETAIL CALLOUT REFERENCE

SECTION CALLOUT REFERENCE

X

XXXXXXXXXXX

SCALE: X=XXX

XXXX

ELEVATION IS LOCATED

SHEET NUMBER WHERE

DETAIL IS LOCATED

SECTION IS LOCATED

DETAIL, ELEVATION OR SECTION IS/ARE LOCATED

SHEET NUMBER(S) WHERE CALLOUT(S) TO PLAN,

(PLAN, DETAIL, ELEVATION OR SECTION)

REFERENCE NUMBER/LETTER

DRAWING PREFIXES

GXXX - GENERAL

DXXX - DEMOLITION

CXXX - CIVIL

EXXX - ELECTRICAL/ELECTRONIC

MXXX - MECHANICAL

DEMOLITION NOTES

GENERAL CONSTRUCTION NOTES

ELECTRICAL NOTES

SYMBOLS LEGEND

CONTRACTOR MUST PROVIDE TEMPORARY LIGHTING OVERNIGHT AND DURING OUTAGES15.

CONTRACTOR MUST PROVIDE A DUMPSTER ON SITE FOR ALL CONSTRUCTION DEBRIS.14.

MUST BE SERVICED ON A WEEKLY BASIS.

CONTRACTOR MUST PROVIDE A PORT-A-JOHN FOR THE DURATION OF THE CONSTRUCTION PROJECT. FACILITIES 13.

THE ENVIRONMENTAL CONDITIONS. CONTRACTOR MUST PROVIDE SHELTER IF REQUIRED.

CONTRACTOR MUST STORE NEW EQUIPMENT AND MATERIALS ON SITE IN A MANNER THAT IT IS PROTECTED FROM 12.

CONTRACTOR MUST CONTACT THE CO AND COR PRIOR TO PROCEEDING WITH CONSTRUCTION.

IF CONDITION ONSITE ARE DIFFERENT FROM THOSE INDICATED ON THE DRAWINGS OR SPECIFICATIONS, THE 11.

INDICATED. THE CONTRACTOR MUST BE RESPONSIBLE FOR ALL REQUIRED PERMITS.

THE CONTRACTOR MUST PROVIDE ALL LABOR, EQUIPMENT, AND REQUIRED TEMPORARY POWER UNLESS OTHERWISE

ALL FITTINGS, TRANSITIONS, DAMPERS, VALVES, AND OTHER DEVICES REQUIRED FOR A COMPLETE INSTALLATION.

THE CONTRACTOR MUST PROVIDE ALL MATERIAL UNLESS OTHERWISE INDICATED. THE CONTRACTOR MUST PROVIDE 10.

NECESSARY. PROTECT ALL EXISTING FINISHED FLOORING, WALLS, CEILINGS, DURING DEMOLITION AND CONSTRUCTION.

DAMAGE, IMMEDIATELY NOTIFY THE CO AND COR. THE CONTRACTOR MUST MAKE REPAIRS AND REPLACEMENTS AS

THE CONTRACTOR MUST USE ALL MEANS NECESSARY TO PROTECT EXISTING WORK, AND IN THE EVENT OF 9.

RIGHT TO SUSPEND THE PROJECT SHOULD AN UNSAFE CONDITION EXIST.

THE CONTRACTOR MUST STRICTLY COMPLY WITH ALL OSHA REGULATIONS AT ALL TIMES. THE COR RESERVES THE 8.

THE COR TWO WEEKS PRIOR TO OPERATION.

PROTECTED FROM ALL CONSTRUCTION DEBRIS AT ALL TIMES. ALL SHUTDOWNS MUST SCHEDULED IN WRITING WITH

EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT THE PROJECT DURATION. ALL FAA EQUIPMENT MUST BE 7.

MUST BE SUBMITTED FOR THE APPROVED LISTED PURCHASED EQUIPMENT.

WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS OTHERWISE NOTED. ALL NEW EQUIPMENT SUPPORTS, CONTRACTOR MUST INSTALL ALL EQUIPMENT AND ACCESSORIES IN ACCORDANCE WITH THE MANUFACTURER'S 6.

CONSTRUCTION START.

CONTRACTOR MUST COMPLY WITH ACCESS ROUTES, STAGING AREAS, AND PARKING AREAS APPROVED PRIOR TO 5.

TO START OF CONSTRUCTION.

BE SCALED TO DETERMINE THE EXACT LOCATIONS OF WORK. CONTRACTOR MUST VERIFY DIMENSIONS ONSITE PRIOR

THE DRAWINGS ARE DIAGRAMMATIC AND ARE TO CONVEY SCOPE, GENERAL ARRANGEMENT ONLY, AND MUST NOT 4.

THE CONDITIONS.

FACILITY. START OF CONSTRUCTION ACTIVITIES WILL NEED TO BE STAGGERED DURING INSTALLATION TO BEST SUITE

CONTRACTOR MUST COORDINATE ALL WORK TO AVOID ANY AND ALL CONFLICTS WITH PERSONNEL WORKING AT THE 3.

AND SIZES OF ALL DUCTWORK, EQUIPMENT, AND ACCESSORIES THAT IS TO BE DEMOLISHED.

BEFORE THE START OF ALL WORK, CONTRACTORS MUST VERIFY THEIR SCOPE OF WORK, LOCATION, ELEVATION, 2.

MA.

FOR THE AIR TRAFFIC CONTROL TOWER (ATCT) THAT SERVES THE BEVERLY REGIONAL AIRPORT (BVY), BEVERLY, THIS DRAWING PACKAGE INDICATES WORK REQUIRED FOR THE REMOVAL AND INSTALLATION OF A HVAC SYSTEM 1.

COR.

CONTRACTOR MUST RETURN SITE TO ORIGINAL CONDITION PRIOR TO PROJECT COMPLETION WITH ACCEPTANCE OF 6.

REQUIREMENTS FOR PERSONS DISPOSING OF REFRIGERANT. SEE EPA 40 CFR PART 82, SUBPARTS A AND F.

AC EQUIPMENT MUST HAVE REQUIRED CERTIFICATIONS. CONTRACTOR TO MAINTAIN RECORD KEEPING

HVAC SYSTEM. ALL REFRIGERANT RECOVER EQUIPMENT AS WELL AS PERSONNEL DISPOSING OF REFRIGERATION/

INCLUDING, BUT NOT LIMITED TO THE REMOVAL, STORAGE, AND DISPOSAL OF THE REFRIGERANT IN THE EXISTING

CONTRACTOR MUST HANDLE REFRIGERANT ACCORDING TO LOCAL, STATE, AND FEDERAL REQUIREMENTS; 5.

SUBSTANCES.

CONTRACTOR MUST PROVIDE REQUIRED DOCUMENTATION AND MANIFEST FOR THE DISPOSAL OF CONTROLLED 4.

THE FAA.

CONTRACTOR MUST LEGALLY DISPOSE OF ALL MATERIAL AND EQUIPMENT NOT RETURNED TO OR RETAINED BY 3.

POLYTARP), ETC. FAA EQUIPMENT MUST NOT BE DAMAGED DURING DEMOLITION PERIOD.

LIMITED TO, METHODS TO LIMIT DUST PRODUCTION, EXHAUST SYSTEMS, PROTECTIVE COVERS (I.E. 2 MIL

EQUIPMENT DURING CONSTRUCTION AND DEMOLITION ACTIVITIES. DUST MITIGATION PLAN MUST INCLUDE, BUT NOT

CONTRACTOR MUST SUBMIT A DUST MITIGATION PLAN TO COR FOR APPROVAL TO PREVENT DAMAGE TO FAA 2.

CONDITION AT THE END OF EACH WORK SHIFT.

IMPACT SITE OPERATIONS. THE AFFECTED WORK AREAS MUST BE THOROUGHLY CLEANED TO THEIR ORIGINAL

COMPLETION OF THE WORK SHIFT EACH DAY. SITE CONDITIONS THROUGHOUT CONSTRUCTION PERIOD WILL NOT

REMOVE ALL DEBRIS, RUBBISH, SCRAP, DIRT, AND PROTECTIVE COVERINGS FROM THE WORK AREAS UPON 1.

MECHANICAL NOTES

MAINTENANCE, OPERATION, AND SERVICE REQUIREMENTS. COORDINATE TRAINING SCHEDULE WITH COR.

CONTRACTOR MUST PROVIDE A (4) HOUR TRAINING FOR THE FAA PERSONNEL FOR THE NEW HVAC SYSTEM'S 10.

OR TABB QUALIFIED.

COPY OF TEST RESULTS AND REPORT IN CLOSE OUT DOCUMENTS. TAB CONTRACTOR MUST BE EITHER AABC, NEBB, LEVEL OF CAB DURING PACKAGE UNIT OPERATION. PROVIDE COR WITH RESULTS AS WELL AS TAB REPORT. INCLUDE

AIRFLOW, SUPPLY AIR TEMPERATURE, AND RETURN AIR TEMPERATURE AND RECORD RESULTS. MEASURE SOUND

COMPLETED HVAC SYSTEM AND ADJUST AIRFLOW RATES TO THE CFM INDICATED IN DRAWING M002. MEASURE

CONTRACTOR MUST HAVE CERTIFIED PROFESSIONAL PERFORM TESTING, ADJUSTING, AND BALANCING (TAB) OF THE 9.

ENGINEER'S REVIEW AND APPROVAL.

STRUCTURAL COMPONENTS MUST NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT A STRUCTURAL 8.

CONDENSATE DRAINS MUST BE MADE OF PVC SUITABLE (SCHEDULE 80) FOR THIS APPLICATION.7.

PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION.

PERFORMING THE OPERATION. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926.

OPERATIONS; PERSON PERFORMING FIRE PROTECTION DUTIES MUST NOT BE THE SAME INDIVIDUAL THAT IS

DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING BRAZING AND CUTTING 6.

WARRANTY FOR EQUIPMENT SUPPLIED.

COPIES OF SERVICE CONTRACTS, CONTRACTOR'S (ONE YEAR) WARRANTY ON INSTALLATION, AND MANUFACTURER'S

MANUAL, INCLUDING MANUFACTURER'S MANUALS FOR ALL EQUIPMENT FURNISHED, A LIST OF EQUIPMENT SUPPLIERS, PRIOR TO PROJECT CLOSE OUT, THE CONTRACTOR MUST FORWARD AN OWNER'S OPERATING AND MAINTENANCE 5.

CONTRACTOR MUST PROVIDE HVAC MANUFACTURER'S FIVE YEAR WARRANTY ON COMPRESSORS AND COILS 4.

NEW INSULATED WALL SLEEVE FOR NEW AC UNITS MUST BE INSTALLED WATER AND WEATHER TIGHT. 3.

MATERIALS OR WORKMANSHIP.

HIS OWN EXPENSE, PROMPTLY CORRECT AND REPAIR ANY AND ALL BREAKS, FAILURES OR WEAR DUE TO FAULTY

CONTRACTOR FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE. THE CONTRACTOR MUST, AT

EQUIPMENT, MATERIALS AND WORKMANSHIP OF THE MECHANICAL INSTALLATION MUST BE WARRANTIED BY THE 2.

DRAWINGS, SPECIFICATION, AND AS REQUIRED BY THE CODES AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.

MECHANICAL SYSTEMS; AND MUST MAKE SURE THE NEW MECHANICAL SYSTEMS OPERATES AS INDICATED IN THE

CONTRACTOR MUST PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETELY INSTALL THE NEW 1.

THEIR OWN LOCK OUT DEVICES. ONLY FAA PERSONNEL ARE ALLOWED TO ENERGIZE/ DE-ENERGIZE EQUIPMENT.

CONTRACTOR MUST PROVIDE A LOCK OUT TAG PLAN PRIOR TO START DEMOLITION. CONTRACTOR MUST PROVIDE 10.

CABLES.

INSULATION MEGGER TESTS MUST BE PERFORMED IN THE PRESENCE OF THE COR ON ALL NEW CONDUCTORS AND 9.

ALL NEW CONDUITS MUST BE CLEARED OF DEBRIS AND A PULL STRING INSTALLED.8.

ALL EQUIPMENT AND CABLES MUST BE TESTED AS REQUIRED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.7.

6AWG GREEN BONDING CONDUCTOR.

FLEXIBLE LIQUIDTIGHT CONDUIT MUST BE ALL PLASTIC PVC TYPE, WITH FLEXIBLE STEEL CORE AND AN EXTERNAL 6.

IN EACH PULL BOX, AND EVERY 3 FEET WHERE THE CONDUCTOR IS VISIBLE.

ALL INSULATED CONDUCTORS MUST BE PROPERLY AND PERMANENTLY IDENTIFIED AND COLOR CODED AT EACH END, 5.

AND MUST BE IN THE PRESENCE OF THE COR.

VOLTAGE AND PHASE ROTATION TESTS MUST BE PERFORMED BEFORE AND AFTER ANY DISCONNECTION OF POWER 4.

THE CONTRACTOR MUST FURNISH ALL LABOR, MATERIAL AND EQUIPMENT UNLESS OTHERWISE INDICATED.3.

FAA.

COMPLETION OF THE PROJECT. COORDINATE REQUIRED EQUIPMENT SHUTDOWNS WITH THE RESIDENT ENGINEER AND

CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND REROUTE CONDUITS AS NECESSARY TO SUPPORT THE 2.

WORK) AND FAA-STD-019. (DOCUMENTATION AVAILABLE AT CONTRACTOR'S REQUEST)

ALL ELECTRICAL WORK MUST COMPLY WITH LATEST EDITION OF SPECIFICATIONS FAA-C-1217 (INTERIOR ELECTRICAL 1.

CIVIL NOTES

TO THE ATTENTION OF FAA CONTRACTING OFFICER'S REPRESENTATIVE ANY DISCREPANCIES.

DISCREPANCIES: CONTRACTOR MUST VERIFY ALL DIMENSIONS, CONDITIONS AND ELEVATIONS AT JOB SITE AND BRING 6.

THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AFFECTED BY THE PROJECT.5.

THE CONTRACTOR IS REQUIRED TO MEET OSHA'S FALL PROTECTION AND SAFETY RULES AND REGULATIONS.4.

ANY WORK BEING PERFORMED. ANY DELAYS OR RESCHEDULING OF THE WORK MUST BE COORDINATED WITH THE COR.

A DETAILED WORK SCHEDULE MUST BE PRESENTED FOR APPROVAL TO THE COR AT LEAST 24 HOURS IN ADVANCE OF 3.

COORDINATE ACCESS TO THE SITE WITH THE FAA AHEAD OF TIME.

CONSTRUCTION SITE ACCESS: THE CONSTRUCTION SITE IS LOCATED WITHIN A GATED FACILITY. THE CONTRACTOR MUST 2.

DRAWINGS, SPECIFICATION, AND AS REQUIRED BY THE CODES AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.

ROOFING SYSTEMS; AND MUST MAKE SURE THE NEW ROOFING SYSTEM MUST BE INSTALLED AS INDICATED IN THE

CONTRACTOR MUST PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETELY INSTALL THE NEW 1.

ABBREVIATIONS

CO - CONTRACTING OFFICER

COR - CONTRACTING OFFICER'S REPRESENTATIVE

PEL - PROJECT ENGINEER LEAD

SXXX - STRUCTURAL

BVY-21005020-G002

GENERAL NOTES

bvy-21005020-g002

2024-01-31T06:14:47-0500

HENRY B NEWCOMB

2024-01-30T13:56:07-0500

SHREY B PATEL

REFER TO E001 AND E002 FOR ELECTRICAL REQUIREMENTS.8.

CONTRACTOR MUST FIELD LOCATE UNIT HEATER THERMOSTATS WITH COORDINATION OF COR.7.

SUBMIT ALL EQUIPMENT AND ACCESSORIES FOR APPROVAL PRIOR TO INSTALLATION.6.

FOR COMPLETE INSTALLATION.

CONTRACTOR MUST PROVIDE AND INSTALL EQUIPMENT AND ACCESSORIES ACCORDING TO MANUFACTURER'S INSTALLATION INSTRUCTIONS 5.

BRACKETS (DAYTON CATALOG NUMBER 2YV16).

PROVIDE AND INSTALL DAYTON 804T17, OR APPROVED EQUAL (EUH-2). PROVIDE AND INSTALL MANUFACTURER CEILING MOUNTING 4.

BRACKETS (DAYTON CATALOG NUMBER 2YV16).

PROVIDE AND INSTALL DAYTON 804T20, OR APPROVED EQUAL (EUH-1). PROVIDE AND INSTALL MANUFACTURER CEILING MOUNTING 3.

AND PTAC-2).

PROVIDE AND INSTALL FREDRIECH PVH09K, INSULATED WALL SLEEVE, AND CONDENSATE DRAIN; OR PROVIDE APPROVED EQUAL (PTAC-1 2.

PROVIDE AND INSTALL FREDRIECH 12B33A, INSULATED WALL SLEEVE, AND CONDENSATE DRAIN; OR PROVIDE APPROVED EQUAL (WAC-1). 1.

NOTES:

WAC-1

MARK TYPE

UNIT IDENTIFICATION

TOTAL

HEATING

REFRIGERANT

VOLTS PHASE HZ

208/230 1 60

DESCRIPTION/ REMARKS

ELECTRICAL DATACOOLING

FREDRIECH

CEW12B33A

HEATING

AIR CONDITIONER SCHEDULE

MOP

(AMPS)

MCA

FAN MOTOR

MOISTURE

TONNAGE

COOLING

1 10600 BTU

REMOVAL

3.3

PTS./HR

R-410A

MOTOR

H.P.

INDOOR

CFM

NEMA

PLUG

6-20P 16"W X 20"H, FIRST FLOOR EQUIPMENT ROOM, WINDOW AC UNIT

PTAC-1 3600 WATTS 208/230 1 60

FREDRIECH

PVH09K

20 19.9.75 9400 BTU 1.4R-410A 400 6-20P

PTAC-2 208/230 1 60

ELECTRIC HEAT

WINDOW UNIT W/

PTAC UNIT W/ 42"W X 16"H, SECOND FLOOR EQUIPMENT ROOM, PACKAGE TERMINAL AC UNIT

PTAC UNIT W/ 2500 WATTSFREDRIECH

PVH09K

15 13.9.75 9400 BTU 1.4R-410A 400 6-15P 42"W X 16"H, THIRD FLOOR EQUIPMENT ROOM, PACKAGE TERMINAL AC UNIT

AND MODEL

MANUFACTURER

REMARKS:

MANUFACTURE'S CONDENSATE DRAIN KIT4.

MANUFACTURE'S INSULATED WALL SLEEVE3.

WASHABLE FILTER2.

AUTO-RESTART1.

INCLUDE THE FOLLOWING OPTIONS AND ACCESSORIES

1060 WATTS

ELECTRIC UNIT HEATER SCHEDULE

MARK MANUFACTURER MODEL

AIR DELIVERY DATA FAN MOTOR DATA ELECTRICAL DATA

TYPE

EUH-1 DAYTON 804T20 970 7.5

KWCFM FPM RPM

1600 1/30650

SS FIN

TUBULAR

AMPS

20.8

VOLTS PHASE

HZ

3 PHASE208

DELTA T °F

37°

HP

PHYSICAL

EUH-2 DAYTON 804T16 800 3.71600 1/100350

SS FIN

TUBULAR

18.0 60 1 PHASE20845°

DIMENSIONS

H X W X D

COMMENTS

21.75" X 19" X 8.5" ELECTRIC UNIT HEATER, FIRST FLOOR STAIRWELL

ELECTRIC UNIT HEATER, CAB STAIRWELL16" X 14" X 8.5"

CEILING MOUNT (DAYTON 2YV16)2.

WALL MOUNTED LINE VOLTAGE THERMOSTAT1.

OF OUTDOOR AIR.

THE MANUAL OUTSIDE AIR DAMPER MUST BE OPENED ALL FOR APPROXIMATELY 100 CFM (ADJUSTABLE) ··

COORDINATION OF COR BASED ON LOCATION SHOWN IN DETAIL 3 (M002)

ROOFTOP UNIT'S THERMOSTAT MUST BE INSTALLED IN THE CONDITIONED SPACE, FIELD LOCATE WITH ··

NOTES·

WHEN SUPPLY SMOKE DETECTOR DETECTS SMOKE, THE ROOFTOP UNIT MUST SHUTDOWN.7.1.3.

7.1.2.

7.1.1.

SETPOINTS FOR BASE BUILDING MUST MAINTAIN BETWEEN 7.1.

BASEBUILDING7.

WHEN SUPPLY SMOKE DETECTOR DETECTS SMOKE, THE ROOFTOP UNIT MUST SHUTDOWN6.1.4.

6.1.3.

6.1.2.

6.1.1.

6.1.

CAB LEVEL6.

SETPOINTS OF EXISTING WINDOW AC UNIT WILL NOT BE ADJUSTED5.1.

FOURTH FLOOR EQUIPMENT ROOM5.

4.1.2.

4.1.1.

4.1.

THIRD FLOOR EQUIPMENT ROOM4.

3.1.2.

3.1.1.

3.1.

SECOND FLOOR EQUIPMENT ROOM3.

2.1.1.

2.1.

FIRST FLOOR STAIRWELL2.

1.1.3.

1.1.2.

1.1.1.

1.1.

FIRST FLOOR EQUIPMENT ROOM 1.

SEQUENCE OF OPERATIONS

PACKAGE ROOFTOP AIR CONDITIONER SCHEDULE

MARK MANUFACTURER MODEL

EVAPORATOR

RTU-1 TRANE 3

NOMINAL

EXT. S.P.

IN H20

1.17

°F

EDB

°F

EWB

67 3400

MBH

MBH

SENSIBLE

105.6 81.0

CONDENSOR

QTY. STAGES

HP

FAN

0.7

SCROLL

MANIFOLD

TYPE

COMPR.

TEMP

AMBIENT

95 °F (32/68/100)

HEAT

27 KW

KWTYPE

ELECTRIC

DEHUMIDIFIER

REHEAT

HOT GAS

MODULATING

ELECTRICAL DATA

PHASE

HZVOLTS

MOCPMCA

107 110

FAN HP

8.8

FAN FLA

RLA

LRA

20.2 136

FLA

LRA

3.3 12.3**A2C1A2B0A0B410A

THJ102A3S0K

FILTER DATA

- 24 X 16 X 2(3)

- 18 X 24 X 2(2)

QUANTITY

STD

ASHRAE

MERV 8COMPR.

RTU-2 CARRIER

0A5F0

50FC-B05M3Q5-

1.96.6 80 67 160048.4 34.3

1 R-410A 0.25 1100

SCROLL

MANIFOLD

95 °F

13.7 83 1.5COMPR. 16 KWELECTRIC

REHEAT

HOT GAS

MODULATING

360208 57 60

- 16 X 25 X 2(1)

- 20 X 24 X 1(1)

MERV 8

ACCESORIES

E-COAT AL/CU ON CONDENSER AND EVAPORATOR COILS

2 4 5 8 9 10 12 13 14 1716 19 21 23

2 3 5 6 7 9 10 11 12 14 15 17 18 19 20 21 22 23

HIGH STATIC INDOOR MOTOR24.

LOW AMBIENT CONTROLS (DOWN TO 0°F)23.

STAINLESS STEEL CONDENSATE DRAIN PAN22.

CONDENSATE DRAIN PAN OVERFLOW SWITCH21.

CLOGGED FILTER SWITCH20.

SUPPLY AIR SMOKE DETECTOR19.

DEHUMIDIFICATION COIL: MODULATING HOT GAS REHEAT18.

POWERED CONVENIENCE OUTLET17.

NON-FUSED DICSONNECT16.

UNIT MOUNTED CIRCUIT BREAKER15.

THROUGH THE BASE ELECTRIC14.

COIL PROTECTION13.

LOVUERED HAIL GUARD12.

STANDARD COIL11.

INCH MERV 8 FILTERS HINGED ACCESS PANELS/ 2 10.

ADJUSTABLE MANUAL OUTSIDE AIR DAMPER 0-50% 9.

14.4 KW STAGED ELECTRIC HEAT8.

27 KW (2 STAGE) ELECTRIC HEAT7.

UNIT CONTROLS: SYMBIO 7006.

208-230 VOLT/ 60 HZ/ 3 PHASE5.

4 TON, SINGLE COMPRESSOR4.

8.5 TON, DUAL COMPRESSOR3.

R-410A2.

DX COOLING1.

NOTES

APPROVED EQUAL.

PROVIDE AND INSTALL TRANE ROOFTOP UNIT OR

APPROVED EQUAL.

PROVIDE AND INSTALL CARRIER ROOFTOP UNIT OR

CORROSION RESISTANT COIL COAT ON CONDENSER COIL

lo tt e

-m

BVY-21005020-M001

MECHANICAL HVAC SCHEDULE

bvy-21005020-m001

2024-01-31T06:15:57-0500

HENRY B NEWCOMB

2024-01-30T13:58:06-0500

SHREY B PATEL

CONTROL

CAB LEVEL

AIR SUPPLY DROP

RETURN

AIR DUCT

DISTRIBUTION

BOXDISTRIBUTION

BOX

STRIP DIFFUSERS

8" FLEXIBLE

DUCT

M002

ATCT PARTIAL ELEVATION

8" FLEXIBLE

DUCT

SUSPENDED

CEILING

HVAC UNIT

M002 NOT TO SCALE

NEW DUCTWORK LAYOUT1 2

HVAC PLAN

SUPPLY

ROOF

HATCH

IC

L

INSTALL NEW SEISMIC CURB

POWERED CONVENIENCE OUTLET

THROUGH THE BASE ELECTRICAL WITH

UNIT MOUNTED CIRCUIT BREAKER

M003

RETURNING APPROX CFM.

LINEAR SLOT DIFFUSER MUST BE BALANCED TO APPROX 185 CFM AND THE RETURN AIR SHOULD BE

NEW HVAC SYSTEM AND DUCTWORK MUST BE BALANCED BY A CERTIFIED BALANCER. BALANCE EACH 13.

NEW CEILING PANELS MUST BE REPLACED TO MATCH EXISTING PANELS.

CONTRACTOR MUST REPLACE ANY DAMAGED CEILING PANELS THAT GET DAMAGED DURING CONSTRUCTION. 12.

SHOWN FOR CLARITY.

MUST BE INSTALLED INLINE WITH RETURN DUCTWORK. ONLY FLEX CANVAS DUCT CONNECTOR IN RETURN IS

INSTRUCTIONS. (1) CONNECTOR MUST BE INSTALLED INLINE WITH SUPPLY DUCTWORK AND (1) CONNECTOR

DUCT CONNECTOR ACCORDING TO VIBRATION ISOLATION CURB MANUFACTURER'S INSTALLATION

CONTRACTOR MUST PROVIDE AND INSTALL (2) FLEX CANVAS DUCT CONNECTORS. INSTALL FLEX CANVAS 11.

WITH DUCT SUPPORTS. SEE STATEMENT OF WORK FOR CONSTRUCTION DETAILS.

CONTRACTOR MUST PROVIDE AND INSTALL NEW 16 GAUGE GALV. STEEL SUPPLY DUCTWORK (34" X 12") 10.

SEE STATEMENT OF WORK FOR CONSTRUCTION DETAILS.

CONTRACTOR MUST PROVIDE AND INSTALL NEW INSULATED SUPPLY FLEX DUCT (8") WITH DUCT SUPPORTS. 9.

INSTALL PLASTIC COVER TO PROTECT THERMOSTAT FROM DIRECT SUNLIGHT

CONTRACT MUST PROVIDE AND INSTALL NEW ROOFTOP UNIT THERMOSTAT ON WALL IN CAB. PROVIDE AND 8.

CERTIFICATION PRIOR TO BALANCING, AND PROVIDE BALANCING REPORT AFTER COMPLETION

INSTALLED IN NEW DUCTWORK. BALANCING MUST BE DONE BY CERTIFIED PERSONNEL, PROVIDE

BALANCE ALL (18) LINEAR DIFFUSERS TO 275 CFM, USING THE MANUAL BALANCERS THAT SHALL BE 7.

COMPRESSION LUG ONTO BARE METAL.

CONTRACTOR TO REUSE EXISTING GROUNDING CONDUCTOR. ATTACH TO NEW UNIT USING TWO BOLT 6.

CLEAN ROOF DRAIN, AND REMOVE DEBRIS DURING CONSTRUCTION.5.

INSTALL A NEW PVC CONDENSATE DRAIN ACCORDING TO MANUFACTURER'S INSTRUCTIONS.4.

ISOLATION CURB AND ROOFTOP UNIT

CONTRACTOR MUST PROVIDE COORDINATION DRAWINGS OF THE INSTALLATION OF THE NEW VIBRATION

THE NEW HVAC UNIT MUST FIT ON THE NEW VIBRATION ISOLATION CURB. NEW UNIT MUST BE APPROVED. 3.

WHEN INSTALLING NEW UNIT, THE POWER CONDUCTORS WILL BE RE-USED FROM THE EXISTING UNIT.2.

ALL FLEX DUCTWORK SHALL HAVE A MAXIMUM LENGTH OF 6 FEET.1.

(SEE DETAIL B)

CONDENSATE DRAIN

CONDENSATE DRAIN DETAIL

0.75 INCHES (2021 IMC)

CONDENSATE DRAIN MUST HAVE A MINIMUM INNER DIAMETER OF ·

DRAIN MUST BE SLOPE 1/2' PER 10 FEET OF HORIZONTAL RUN.·

THE CAB ROOF DRAIN.

HORIZONTAL PIPE LENGTH MUST BE LONG ENOUGH TO REACH TO ·

INSTALLATION INSTRUCTIONS.

80) CONDENSATE DRAIN ACCORDING TO MANUFACTURER'S

CONTRACTOR MUST PROVIDE AND INSTALL NEW PVC (SCHEDULE ·

NOTE:

36" 48"

36"

36"

ISOLATION CURB

HVAC VIBRATION

SEE NOTE 11

(TYP. OF 2)

FLEX CONNECTOR

SEE NOTE 1

36"X12'H

GALV DUCT

MANUAL

VOLUME DAMPER

(TYP OF 18)

AIR DUCT/GRILL

TURNING

VANES (TYP)

8" FLEX DUCT

36"X12"H

AIR DUCT

TO EXISTING GRILLE

DUCT CONNECTED

NEW FLEX SUPPLY

36"X12"H

DISTRIBUTION BOX

CAB

EQUIP

FLOOR

THERMOSTAT

(SEE NOTE 8)

SEE NOTE 13

PANEL ENCLOSURE

.75 INCH NPT FEMALE CONNECTOR

1.5"

LENGTH CAN BE FIELD DETERMINED

SEE DETAIL NOTES

CLEANOUT PLUG

:5 lo tt e

BVY-21005020-M002

MECHANICAL DUCTWORK DETAIL

bvy-21005020-m002

2024-01-31T06:16:08-0500

HENRY B NEWCOMB

2024-01-30T13:57:12-0500

SHREY B PATEL

ATCT ELEVATION

PTAC-1

PTAC-2

WAC-2

CABINET HEATER

UH-2

ELECTRIC 10KW

UH-1

ELECTRIC 5KW

STAIRWELL

EQUIP. RM.

REFER TO SCHEDULES ON M001 FOR UNIT SCHEDULES·

MUST VERIFY LOCATIONS AND CONNECTIONS PRIOR TO CONSTRUCTION.

ELEVATION VIEW IS DIAGRAMMATIC TO SHOW APPROXIMATE LOCATIONS. CONTRACTOR ·

FIRST/GROUND FLOOR EQUIPMENT ROOM

SECOND FLOOR EQUIPMENT ROOM

THIRD FLOOR EQUIPMENT ROOM

FOURTH FLOOR EQUIPMENT ROOM

1 HVAC UNIT DETAIL

27 9/16"

HVAC UNIT PENETRATION PLAN

Y

ALL FLANGES 1 1/4"

2 DOWNFLOW DUCT CONNECTIONS

4 3/16"

32 1/8"

33"

3 7/8"

17 1/2" 17 1/2"

9 13/16"

3 5/8"

RETURN SUPPLY

THROUGH THE

BASE ELECTRICAL

CONDENSER FAN

CONTROL BOX

ACCESS PANEL

CONDENSER COIL WITH

COIL GUARD

UNIT CONRTOL WIRE 7/8" DIA.HOLE

SERVICE GAUGE PORT ACCESS 1 3/8" DIA. HOLE

UNIT POWER WIRE

COMPRESSOR ACCESS

PANEL

CONDENSATE DRAIN (ALT)

3/4" - 14 NPT DIA. HOLE

EVAPORATOR SECTION

HVAC ELEVATION

HVAC ELEVATION - ACCESS PANELS

CONDENSER FAN

4 1/4"

BASERAIL LENGTH

27 9/16"

CONTROL PANEL ACCESS

COMPRESSOR ACCESS PANEL

CONTROL PANEL ACCESS

SECTION

EVAPORATOR

88 1/2"

4 7/8"

9"

53 1/4"

BASERAIL WIDTH

9 5/8"

11 1/4"

50 15/16"

15 1/4"

52 5/16"

17 3/4"

17 3/4"

TOP PANEL

3/4' 14 NPT DIA.HOLE

CONDENSATE DRAIN

THROUGH THE BASE

5 7/8"

3 3/4"

2 3/4"

5"

33 3/4"

(NEW)

(EXISTING)

DETAIL SHOWS DUCT UPWARDS FOR CLARITY.

NOTE: DIRECTION OF THE DUCT WORK IS DOWNWARDS TOWARDS THE BUILDING.

(EXISTING)

RTU-1

lo tt e

BVY-21005020-M003

MECHANICAL HVAC DETAILS

bvy-21005020-m003

2024-01-31T06:16:20-0500

HENRY B NEWCOMB

2024-01-30T13:57:23-0500

SHREY B PATEL

S R

6" 0

HARD DUCT

8" 0 HARD DUCT

8" 0

.A

IN

6" 0 HARD DUCT

12" X 12"

LINED DUCT

200 CFM

150 CFM

200 CFM

125 CFM

75 CFM

75 CFM

125 CFM200 CFM

8" 0

FLEX DUCT

24" X 12"

LINED R.A.

24" X 24"

R.A. GRILLE

16" X 12" R.A.

.A

IN

12" X 12" R.A.

16" X 16"

16" X 16"

12" X 12" R.A. GRILLE

16" X 12" R.A.

12"X12" R.A. GRILLE

12" X 12" RETURN

REGISTER ABOVE CEILING

1" UNDERCUT @

BOTTOM OF DOOR

(TYPICAL)

1" UNDERCUT @

BOTTOM OF DOOR

(TYPICAL)

24" X 24"

TO CEILING PLENUM

10" 0 HARD DUCT

100 CFM

12" X 12"

42'-0"

25'-0"17'-0"

PANELS MUST BE REPLACED TO MATCH EXISTING PANELS.

CONTRACTOR MUST REPLACE ANY DAMAGED CEILING PANELS THAT GET DAMAGED DURING CONSTRUCTION. NEW CEILING 13.

ONLY FLEX CANVAS DUCT CONNECTOR IN RETURN IS SHOWN FOR CLARITY.

INSTALLED INLINE WITH SUPPLY DUCTWORK AND (1) CONNECTOR MUST BE INSTALLED INLINE WITH RETURN DUCTWORK.

ACCORDING TO VIBRATION ISOLATION CURB MANUFACTURER'S INSTALLATION INSTRUCTIONS. (1) CONNECTOR MUST BE

CONTRACTOR MUST PROVIDE AND INSTALL (2) FLEX CANVAS DUCT CONNECTORS. INSTALL FLEX CANVAS DUCT CONNECTOR 12.

SUPPORTS. SEE STATEMENT OF WORK FOR CONSTRUCTION DETAILS.

CONTRACTOR MUST PROVIDE AND INSTALL NEW 16 GAUGE GALV. STEEL SUPPLY DUCTWORK (34" X 12") WITH DUCT 11.

CONTRACTOR MUST PROVIDE AND INSTALL NEW ROOFTOP UNIT THERMOSTAT INSIDE BASE BUILDING, TO BE FIELD LOCATED.10.

ONTO BARE METAL.

CONTRACTOR TO REUSE EXISTING GROUNDING CONDUCTOR. ATTACH TO NEW UNIT USING TWO BOLT COMPRESSION LUG 9.

CLEAN ALL ROOF DRAINS, AND REMOVE DEBRIS DURING CONSTRUCTION.8.

INSTALL A NEW PVC CONDENSATE DRAIN ACCORDING TO MANUFACTURER'S INSTRUCTIONS.7.

AND ROOFTOP UNIT

CONTRACTOR MUST PROVIDE COORDINATION DRAWINGS OF THE INSTALLATION OF THE NEW VIBRATION ISOLATION CURB

THE NEW HVAC UNIT MUST FIT ON THE EXISTING VIBRATION ISOLATION CURB. NEW UNIT MUST BE APPROVED. 6.

WHEN INSTALLING NEW UNIT, THE POWER CONDUCTORS WILL BE RE-USED FROM THE EXISTING UNIT.5.

MOUNTED ON TOP OF A CURB.

WITH 16 KW OF ELECTRIC HEAT (SEE APPENDIX FOR EQUIPMENT TAG AND PICTURES OF EXISTING UNIT). EXISTING UNIT IS

CONTRACTOR MUST DEMOLISH EXISTING ROOFTOP UNIT. ONE CARRIER 4 TON PACKAGED ROOFTOP AIR CONDITIONING UNIT 4.

SUPPLY DUCTWORK. VERIFY EXISTING CFM MEETS NEW CFMS.

SUPPLY DIFFUSER ACCORDING TO CFM RATINGS LISTED ON DETAIL 1 OF DRAWING USING ADJUSTABLE DAMPERS IN

THIRD-PARTY TAB MUST BE PERFORMED ON THE NEW SYSTEM BY TABB OR NEBB CERTIFIED BALANCER. BALANCE EACH 3.

NADCA STANDARDS.

GRILLES AFTER NEW PACKAGE ROOFTOP UNIT INSTALLATION IS COMPLETE. PERFORM DUCT CLEANING IN ACCORDANCE WITH

CONTRACTOR MUST CLEAN EXISTING SUPPLY AND RETURN AIR DUCTS, AS WELL AS EXISTING SUPPLY AND RETURN 2.

AND FIRST TRANSITION.

ONLY. THE SCOPE IS LIMITED TO THE CONTRACTOR REPLACING SUPPLY AND RETURN DUCTWORK BETWEEN ROOFTOP UNIT

SUPPLY DUCTWORK PLAN VIEW AND RETURN DUCTWORK PLAN VIEW SHOWS THE EXISTING DUCTWORK AND FOR REFERENCE 1.

ATCT ATCT

:1 lo tt e

AS BUILT: SUPPLY DUCTWORK

M005

AS BUILT: RETURN DUCTWORK

M005

FOR REFERENCE ONLY FOR REFERENCE ONLY

BVY-21005020-M005

BASE BUILDING AS-BUILTS

bvy-21005020-m005

2024-01-31T06:16:41-0500

HENRY B NEWCOMB

2024-01-30T13:57:33-0500

SHREY B PATEL

CAB ROOFTOP

BASE BUILDING ROOFTOP

RTU-2

BUILDING LINK

(REFER TO SOW FOR DETAILS)

PROTECTION SYTEM

INSTALL TEMPORARY FALL

PROTECTION PLAN PRIOR TO CONSTRUCTION FOR APPROVAL BY FAA.

PROTECTION SYSTEM ON WEST SIDE OF ROOF BETWEEN ROOFTOP UNIT AND ROOF EDGE. PROVIDE FALL

CONTRACTOR MUST PROVIDE AND INSTALL TEMPORARY FALL PROTECTION SYSTEM. INSTALL FALL 9.

UNIT.

BUBBLE COVER TO INSTALL. MAINTENANCE RECEPTACLE MUST BE EXTERNALLY MOUNTED ON ROOFTOP

GFI DUPLEX RECEPTACLE, 20A, 120V, WR RATED, IN EXTERIOR RATED BOX WITH WEATHERPROOF IN-USE

CONTRACTOR MUST REPLACE EXISTING HVAC MAINTENANCE RECEPTACLE AND PROVIDE NEW EXTERIOR 8.

COR WILL VERIFY ALL SEEMS ARE PROTECTED, PRIOR TO FINAL ACCEPTANCE.

COMPLETE INSTALL MUST INCLUDE ALL PENETRATIONS BEING SEALED WATERTIGHT AND WEATHERTIGHT. 7.

WORK FOR ANCHORING DETAILS.

CURB TO STEEL DECKING TO BE ATTACHED WITH SELF-TAPPING ANCHORING; REFER TO STATEMENT OF

STEEL DECKING. PROVIDE COORDINATION DRAWINGS FOR APPROVAL PRIOR TO INSTALLATION. VIBRATION

UNIT. NEW CURB MUST HAVE 2" DEFLECTIONS AND BE ANCHORED TO BASE BUILDING ROOF TO THE

CONTRACTOR MUST PROVIDE AND INSTALL NEW VIBRATION ISOLATION CURB FOR NEW ROOFTOP AC 6.

PERIOD MUST RESTART AFTER CONTRACTOR HAS ADDRESSED DEFICIENCY.

ENVELOPE SET AT THE THERMOSTAT. IF UNIT CANNOT MEET DESIRED TEMPERATURE, 72 HOUR PROVING

A CONTINUOUS 72 HOUR PERIOD. DURING THIS PERIOD UNIT MUST HOLD THE DESIRED TEMPERATURE

INSTALLATION.NEW UNIT MUST PROVIDE THE HEATING AND COOLING NEEDS OF THE BASE BUILDING FOR

NEW PACKAGE ROOFTOP UNIT MUST COMPLETE A 72 HOUR PROVING PERIOD FOR COMPLETE 5.

PROVIDE (4) 2 KW PORTABLE ELECTRIC HEATERS4.B.

PROVIDE AND INSTALL (4) 1.5 TON PORTABLE AC UNITS AND FLEX DUCT WORK.4.A.

TEMPORARY EQUIPMENT BEING DEMOLISHED.

EXISTING PACKAGE ROOFTOP BEING DEMOLISHED; NEW ROOFTOP MUST BE INSTALLED PRIOR TO

SEPARATE CIRCUITS TO AVOID NUISANCE TRIPS. TEMPORARY EQUIPMENT MUST BE INSTALLED PRIOR TO

FIELD LOCATE ALL EQUIPMENT WITH COORDINATION OF COR. EQUIPMENT MUST BE INSTALLED ON

INSTRUCTIONS. PROVIDE ALL ELECTRICAL AND CONTROLS EQUIPMENT FOR COMPLETE INSTALLATION.

PERIOD. ALL EQUIPMENT MUST BE INSTALLED ACCORDING TO MANUFACTURER'S INSTALLATION

HEATING SOLUTION THROUGHOUT THE BASE BUILDING FOR THE DURATION OF THE CONSTRUCTION

CONTRACTOR MUST PROVIDE A PLAN, FOR APPROVAL, FOR A COMPLETE TEMPORARY COOLING AND 4.

COMPLETED START-UP CHECKLIST TO COR.

CONTRACTOR MUST COMPLETE START-UP CHECKLIST UPON COMPLETE INSTALLATION, AND PROVIDE 3.

AND COMPRESSORS.

TO COMMISSION INSTALLATION AND VERIFY MANUFACTURE'S EXTENDED 5 YEAR WARRANTY ON COILS

PACKAGE ROOFTOP UNIT MANUFACTURER MUST HAVE REPRESENTATIVE VISIT SITE AFTER INSTALLATION 2.

INSTRUCTIONS. POWER IS FED FROM CIRCUIT BREAKERS 17, 19, AND 21 IN PANEL LP.

MUST INSTALL PACKAGE ROOFTOP UNIT ACCORDING TO MANUFACTURER'S RECOMMENDED INSTALLATION

CONTRACTOR MUST PROVIDE AND INSTALL NEW 4 TON PACKAGED AIR CONDITIONING UNIT. CONTRACTOR 1.

MEMBRANE

BASE FLASHING

REMOVABLE SHEET METAL

COUNTER FLASHING

EDGE RAIL

OF RTU

ROOF DECK

INSULATION

CONTINOUS

RAISED

CURB

SEALING

MATERIAL

ACCORDING TO MANUFACTURER'S INSTALLATION INSTRUCTIONS.

INSTALL ROOFTOP UNIT, VIBRATION ISOLATION CURB, AND FLASHING ·

DIAGRAM FOR REFERENCE ONLY·

TO BE REPLACED.

VIBRATION ISOLATION CURB

ROOFTOP UNIT AND

POWER ACCESS KNOCKOUT

CONVENIENCE OUTLET

CONTROL ACCESS KNOCKOUT

CONDENSER COIL

CONTROL BOX

HANDLE

INDOOR BLOWER ACCESS

LOCATION

DISCONNECT

ELECTRICAL

HANDLE

39" 70"

(SEE NOTE 8)

CONVENIENCE OUTLET

lo tt e

SCALE: NTS

MAIN PLAN VIEW

M006

BASE BUILDING ROOFTOP FLASHING DIAGRAM

M006

BASE BUILDING ROOFTOP LEFT SIDE

M004

BASE BUILDING ROOFTOP FRONT SIDE

M004

BVY-21005020-M006

BASE BUILDING ROOFTOP HVAC DETAILS

bvy-21005020-m006

2024-01-31T06:16:51-0500

HENRY B NEWCOMB

2024-01-30T13:57:39-0500

SHREY B PATEL

3'-5 1/2 "

6'-2" 3'-2" 1'

4'-5 1/4 " 7'-4 1/2 "

7'-3 1/8 "

4'-5 1/8 "

S001

23'-8"

3'-7 1/4 " 3'-3" 3'-3" 10 1/2 "

4'-8 1/2 " 1'-1 1/2 "

3'-3" 3'-7 1/4 "

4'-5 1/8 "

3'-5 1/2 " 3'-3"

SCALE: 1/2" = 1'-0"

VIBRATION CURB SECTION

HVAC & CURB SECTION

BUILT UP ROOFING

W

.5

C6X8.2

2C12X20.7

W6X8.5

CURB ANCHORS PLAN VIEW

(COORDINATE WITH HVAC MANUF)

BOLT ROOF-TOP UNIT TO CURB

1. FIELD VERIFY EXISTING CONDITIONS AND ROOF OPENING DIMENSIONS BEFORE

STARTING CONSTRUCTION.

2. EQUIPMENT (HVAC, VIBRATION CURB, ETC.) MUST INSTALLED PER MANUFACTURER'S

RECOMMENDATIONS AND INSTRUCTIONS.

3. VIBRATION CURB TO ROOF STEEL PLATE FRAMING TO BE ATTACHED WITH TEKS HEX

HEAD 1/4" DIA. SELF DRILL SELF TAP SCREWS 1" LENGTH WITH STANDARD WASHERS.

PRE-DRILL HOLES IN STEEL PLATE AND USE TOTAL OF SIX (6) SCREWS, THREE (3) ON

TWO SIDES AS SHOWN ON DRAWING.

4. ELASTOMERIC COATING TO BE FIELD INSTALLED ON EXTERIOR OF VIBRATION CURB.

5. APPROXIMATE UNIT WEIGHT OF 300 LBS FOR VIBRATION CURB AND 1200 LBS FOR

HVAC UNIT. FINAL UNIT WEIGHT AND DIMENSIONS PER VENDOR MANUFACTURER.

6. REMOVE ROOFING AND OTHER MATERIALS TO GET DOWN TO STEEL ROOF DECKING.

7. REFER TO M004 FOR VIBRATION ISOLATION CURB DETAILS.

(SEE NOTE 3)

SELF TAPPING SCREWS

HVAC ROOF-TOP UNIT

(SEE NOTE 2)

VIBRATION CURB

UNIT (SEE NOTE 2)

HVAC ROOF-TOP

SCALE: 1" = 1'-0"

CURB CORNER DETAIL

CURB CORNER DETAIL

ELASTOMERIC COATING (SEE NOTE 4)

EXISTING BUILT UP ROOFING (SEE NOTE 1)

EXISTING 1/4" PL STEEL DECKING

SELF TAPPING SCREWS

ELASTOMERIC COATING (SEE NOTE 4)

BUILT UP ROOFING (SEE NOTE 1)

EXISTING 1/4" PL STEEL DECKING

.2

C8x11.5

C8x11.5

2C12X20.7

X

X

X

X

CAB ROOF FRAMING PLAN

HVAC UNIT

OPEN FOR

:3 lo tt e

-s

1' 0 3' 5'

1' 2' 4'

1' 0 1' 2'

BVY-21005020-S001

CJO

CJO

HVAC AND VIBRATION CURB

-s bvy-21005020-s001

2024-01-31T06:15:46-0500

HENRY B NEWCOMB

2024-01-30T15:17:30-0500

CHRISTIAN J O'CONNOR

C001

CAB PARTIAL ELEVATION

OVER EXISTING ROOFING SYSTEM.

APPLY ELASTOMERIC COATING

TO THE CATWALK

CONTINUE DOWN THE FACADE

OVER PARAPET WALL AND

APPLY ELASTOMERIC COATING

(SEE NOTE 5 AND 6)

HATCH AND THE HVAC CURBS.

THE VERTICAL SIDES OF THE

APPLY ELASTOMERIC COATING UP

ELASTOMERIC COATING.

PRIOR TO APPLICATION OF

AROUND CAB WINDOWS

ALL RAILINGS AND STEEL

EXPOSE BARE METAL ON

SYSTEM TO AVOID TRIPPING HAZARD

PROTECT DURING CONSTRUCTION ACTIVITIES. CONDUCTOR MUST BE STRAPPED DOWN TO ROOFING

TO COUNTERPOISE. USE A 2 LUG CONNECTOR TO ATTACH TO NEW HVAC UNIT. REMOVE AND

CONTRACTOR MUST REUSE EXISTING GROUND CONDUCTOR AND RECONNECT ROOFTOP HVAC UNIT 9.

ROOF WARRANTY.

SYSTEM MEETS MANUFACTURER'S INSTALLATION REQUIREMENTS AND MUST RECEIVE NEW 20 YEAR

CONTRACTOR MUST HAVE COATING MANUFACTURER'S REPRESENTATIVE VERIFY THAT NEW ROOFING 8.

THE APPLICATION OF ELASTOMERIC COATING

EPDM. SOME OF THE EPDM HAS BECOME UN-ADHERED AND WILL NEED TO REPAIRED PRIOR TO

BELOW THE STEEL CATWALK, THERE ARE AREAS OF THE ROOF DECK THAT IS COVERED IN AN 7.

WARRANTY.

HVAC FLASHING MUST BE COVERED IN ELASTOMERIC TOPCOAT TO OBTAIN MANUFACTURER'S ROOF 6.

TO MANUFACTURER'S INSTALLATION INSTRUCTIONS.

CURB/SEISMIC STAND AS WELL AS THE HATCH. FLASHING COATING MUST BE APPLIED ACCORDING

ELASTOMERIC COATINGS SHALL BE APPLIED UP THE VERTICAL FLASHING OF THE HVAC 5.

APPROVED EQUAL).

ELASTOMERIC COATING SHALL BE SIKALASTIC ROOFING PRIMER, REMAT PREMIUM AND 641 (OR 4.

AROUND HVAC UNIT. ADD GRIT MATERIALS TO FINISHED WALKING AREA.

RE-ADHERE EXISTING LOOSE WALKWAY PADS ON BASE BUILDING FROM LADDER TO HVAC AND 3.

CONTRACTOR TO CLEAN ROOF DRAINS, AND REMOVE ANY DEBRIS FROM THE AREA.2.

CONTRACTOR TO SUBMIT ALL MATERIALS FOR APPROVAL FOR THE NEW ROOFING SYSTEM1.

(SEE NOTE 2)

ROOF DRAIN (TYP)

(TYP)

WALKWAY PADS

SEE NOTE 9

EXISTING TO REMAIN

EQUIPMENT TO COUNTERPOISE

C001

ATCT AND BASE BUILDING PLAN VIEW

SEE NOTE 3

WALKWAY PADS

LINE

DRAIN ALONG THE ROOF

TO THE NEAREST ROOF

CONDENSATE DRAIN PIPED

(SEE NOTE 4)

OF ELECTROMETRIC COATING

LET DRY PRIOR TO APPLICATION

FROM EXISTING ROOF SYSTEM AND

CLEAN LOOSE SAND AND DEBRIS

EXISTING TO REMAIN

BILCO ROOF HATCH,

UNIT & CURB

ROOF TOP HVAC

(TYP. OF 4 PLACES)

TO ELASTOMERIC COATING

NEED TO REPAIRED, PRIOR

DAMAGED EPDM LAYER WILL

LOWER EXPOSED ROOF WITH

DAMAGED WALKWAY MATS.

HATCHING INDICATES EXISTING

CREATE A TRAFFIC SURFACE.

ENTIRE ROOF SURFACE TO

COATING WILL BE APPLIED TO

APPLICATION OF GRIT MATERIAL

:5 lo tt e

-c

01/29/2024

BVY-21005020-C001

ROOF REPAIRS

-c bvy-21005020-c001

2024-01-31T06:15:02-0500

HENRY B NEWCOMB

2024-01-30T13:56:15-0500

SHREY B PATEL

24'-0"

44'-0"

D001

ATCT AND BASE BUILDING DEMOLITION PLAN VIEW

EQUIPMENT NOT SHOWN FOR CLARITY.

LOCATION OF DETERIORATED ROOFING MATERIALS. ALL ROOF

NOTE: PLAN VIEW IS DIAGRAMMATIC TO SHOW APPROXIMATE

(TYP)

ROOF DRAIN

A1

A2

TO ROOF

LADDER

IN PLACE.

INCLUDE, BUT NOT LIMITED TO, SCOPE OF WORK TO BE ACCOMPLISHED AND RISK MITIGATION TO BE PUT

CONTRACTOR MUST SUBMIT A FALL PROTECTION PLAN FOR ROOF WORK TO BE APPROVED. PLAN MUST 3.

NEW INSULATION AND MATERIALS MUST MATCH EXISTING MATERIALS.2.2.

INSTRUCTIONS

NEW INSULATION AND MATERIALS MUST BE INSTALLED ACCORDING MANUFACTURER'S INSTALLATION 2.1.

CONTRACTOR MUST PROVIDE NEW INSULATION AND PATCH WITH DRY ROOF MATERIALS WHERE REMOVED.2.

AREA A2 IS APPROX. 3' X 5'1.2.

AREA A1 IS APPROX. 2' X 2'1.1.

SINCE SURVEY WAS COMPLETED (SURVEY DATE WAS 4/11/2023).

SURVEY TO LOCATE DAMAGED REGIONS. DAMAGED REGIONS MAY HAVE GROWN DUE TO FURTHER MOISTURE

AREAS ARE APPROXIMATE, AND ARE FOR REFERENCE ONLY. USE THE PROVIDED INFRARED ROOF MOISTURE 1.

1 & 2

SEE NOTE

(3' X 5')

1 & 2

SEE NOTE

(2' X 2') lo tt e

-d

BVY-21005020-D001

CIVIL DEMOLITION

bvy-21005020-d001

2024-01-31T06:15:12-0500

HENRY B NEWCOMB

2024-01-30T13:56:22-0500

SHREY B PATEL

GROUND LEVEL

C-1 LEVEL

C-3 LEVEL

C-2 LEVEL

PANEL MDP

PANEL A

EQUIP. RM.

CH-1

UH-1

FIRST/GROUND FLOOR EQUIPMENT ROOM

SECOND FLOOR EQUIPMENT ROOM

THIRD FLOOR EQUIPMENT ROOM

FOURTH FLOOR EQUIPMENT ROOM

UH-2

ELECTRIC 3.7K

PANEL C

PANEL B

CAB FALSE CEILING

PARAPET

"ROOF DECK

1'-8.5"

RECORD KEEPING REQUIREMENTS FOR PERSONS DISPOSING OF REFRIGERANTS. SEE EPA 40 CFR PART 82, SUBPART A AND F

CONTRACTOR MUST HANDLE REFRIGERANT ACCORDING TO LOCAL, STAT, AND FEDERAL REQUIREMENTS. CONTRACTOR TO MAINTAIN

EQUIPMENT AS WELL AS PERSONNEL DISPOSING OF REFRIGERATION/ AC EQUIPMENT MUST HAVE REQUIRED CERTIFICATIONS.

CONTRACTOR MUST REMOVE REFRIGERANT FROM EXISTING ROOFTOP UNIT PRIOR TO DEMOLITION. ALL REFRIGERANT RECOVERY 17.

REFER TO STATEMENT OF WORK FOR WORK HOURS.16.

REMOVE THE STRAIGHT SECTION OF SUPPLY AND RETURN DUCT BETWEEN ROOFTOP UNIT AND FIRST TRANSITION.15.6.

REMOVE EXISTING ROOFING MATERIALS AROUND CURB TO GAIN ACCESS TO STRUCTURAL ELEMENTS OF ROOF. 15.5.

REMOVE EXISTING THERMOSTAT AND CONDUCTORS15.4.

REMOVE EXISTING FLEXIBLE DUCT CONNECTOR.15.3.

REMOVE EXISTING STANDARD CURB. 15.2.

ONLY FAA PERSONNEL MAY OPERATE BREAKERS AND DISCONNECTS.

PRIOR TO EXISTING PACKAGE ROOFTOP DEMOLITION, CONTRACTOR MUST LOTO BREAKERS 17,19, AND 21 IN PANEL LP. 15.1.1.

EPA, STATE, AND LOCAL GUIDELINES.

REMOVE EXISTING PACKAGE ROOFTOP UNIT FROM THE SITE AND DISPOSE OR RECYCLE OF PROPERLY IN ACCORDANCE WITH 15.1.

EXPECTED DEMOLITION ACTIVITIES FOR BASE BUILDING ARE INCLUDING BUT NOT LIMITED TO THE FOLLOWING:15.

METHOD TO TO PROTECT FAA PERSONNEL AND EQUIPMENT, AS WELL AS METHODS TO LIMIT DUST PRODUCTION.

CONTRACTOR SHALL SUBMIT A DUST MITIGATION PLAN FOR APPROVAL PRIOR TO DEMOLITION START. PLAN MUST INCLUDE 14.

CONTRACTOR MUST DEMOLISH ALL EXISTING EQUIPMENT REQUIRED FOR COMPLETE NEW HVAC INSTALLATION.13.

CONTRACTOR MUST MODIFY EXISTING OPENINGS TO ACCOMMODATE NEW AC UNIT INSULATED SLEEVES.12.

CONTRACTOR MUST DEMOLISH THE EXISTING VIBRATION ISOLATION ROOF CURB.11.

CONTRACTOR MUST DEMOLISH ALL EXISTING SUPPLY DUCT CLAMPS AND HANGERS.10.

FOR ELECTRIC UNIT HEATERS AND PTAC UNITS.

CONTRACTOR MUST DEMOLISH EXISTING THERMOSTAT FOR CAB ROOFTOP UNIT, AS WELL AS ANY WALL MOUNTED THERMOSTATS 9.

CONTRACTOR MUST PROTECT ALL EQUIPMENT FROM DEMOLITION 8.

PANELS THAT GET DAMAGED DURING CONSTRUCTION PERIOD. NEW CEILING PANELS MUST MATCH EXISTING.

CONTRACTOR MUST REMOVE CEILING PANELS TO REMOVE/ INSTALL HVAC SYSTEM. CONTRACTOR MUST REPLACE ANY CEILING 7.

72 HOUR TESTING PERIOD.

PROVIDE CONTINUOUS COOLING, DURING 72 HOUR TESTING PERIOD, CONTRACTOR MUST ADDRESS THE ISSUE AND RESTART THE

SUCCESSFULLY PROVIDED CONTINUOUS COOLING TO THE CONDITIONED SPACED FOR 72 HOURS. IF TEMPORARY UNIT FAILS TO

THE DEMOLITION WORK IS TO COMMENCE AFTER THE TEMPORARY HVAC UNIT AND DUCTWORK ARE IN PLACE AND HAVE 6.

OPERATION WITH AN APPROVED PLAN.

UNSCHEDULED LOSS OF EQUIPMENT IS UNACCEPTABLE. DISRUPTION OF POWER SHALL ONLY BE ALLOWED AS A SCHEDULED

ALL SPACES IN CONTROL TOWER ARE OPERATIONAL SPACES. EQUIPMENT WILL GO INTO ALARM IF COOLING IS NOT SUPPLIED. 5.

EQUIPMENT THAT IS CONDITIONING THE CAB, IS PROVIDED.

TEMPORARY HVAC EQUIPMENT IS REQUIRED DURING REPLACEMENTS OF ALL (3) PTAC UNITS. SCHEDULE FOR TEMPORARY 4.

INSTALL METHOD, AND CUTOVER PROCEDURE.

CONTRACTOR MUST SUBMIT A TEMPORARY HVAC PLAN PRIOR TO DEMOLITION FOR APPROVAL. PLAN MUST INCLUDE EQUIPMENT, 3.

DUCTWORK FROM UNIT TO FIRST TRANSITION.

CONTRACTOR MUST DEMOLISH BASE BUILDING ROOFTOP HVAC UNIT, VIBRATIONS ISOLATION CURB, AND SUPPY AND RETURN 2.

AREAS INDICATED BY HATCHING ARE TO BE DEMOLISHED, EXACT DIMENSIONS TO BE VERIFIED ON SITE.1.

TO BE DEMOLISHED:

1. 8.5 TON YORK ROOFTOP HVAC UNIT

2. HVAC VIBRATION ISOLATION CURB

3. ROOFTOP UNIT THERMOSTAT (ALL ASSOCIATED CONTROLS)

4. WINDOW AC UNIT - FIRST FLOOR EQUIPMENT ROOM

5. 7.5 KW ELECTRIC UNIT HEATER - FIRST FLOOR STAIRWELL

6. PACKAGE TERMINAL AC UNIT - SECOND FLOOR EQUIPMENT ROOM

7. PACKAGE TERMINAL AC UNIT - THIRD FLOOR EQUIPMENT ROOM

8. 3.7 KW ELECTRIC UNIT HEATER - CAB STAIRWELL

9. FLEX SUPPLY DUCTWORK (10") - TYPICAL OF 18

10. SUPPLY DUCTWORK, VOLUME DAMPERS, AND PLENUM

TO REMAIN:

1. WINDOW AC UNIT - FOURTH FLOOR EQUIPMENT ROOM

2. SUPPLY DROP GRILLE

3. RETURN DUCTWORK

4. RETURN GRILLE

5. LINEAR SUPPLY DIFFUSER - TYPICAL OF 18

6. ROOF HATCH AND DROP DOWN STAIRS

7. AIR TERMINALS - TYPICAL

8. CABINET HEATER - FIRST FLOOR EQUIPMENT ROOM

9. PANEL MDP

10. PANEL A

11. PANEL B

12. PANEL C

TEMP-1

MARK SERVICE TYPE

UNIT IDENTIFICATION

NOMINAL

3,000

NO. OF

CIRCUITS

HEAT

TYPE STAGES

AMBIENT

VOLTS PHASE HZ

208/230 3 60

THICKNESSTYPE ASHRAE STD

AIR COOLED

KW

EFFICIENCY

FILTER DATA

TEMP.°F

ELECTRICAL DATAEVAPORATOR

AIR

CONDITIONING

COIL 27

CONDENSER

TEMPORARY HEATING AND AIR CONDITIONING SCHEDULE - TEMPORARY EQUIPMENT PROVIDING COOLING TO CAB

MOP

100 PLEATED

MCA

HUMDIFIER

2"

NONE

MERV 8

LOW

TONNAGE

COOLING

7.5 102 MBH

D002

EXISTING DUCTWORK LAYOUT

CEILING

SUSPENDED

ROOFTOP UNIT DEMOLITION DETAIL

(SEE NOTE 6)

ATCT ELEVATION-EXISITNG

REFER TO M001 FOR MECHANICAL REQUIREMENTS·

ALL ELECTRICAL PANELS SHOWN ARE TO REMAIN·

HATCHING INDICATES EQUIPMENT TO BE DEMOLISHED·

ELEVATION VIEW IS DIAGRAMMATIC TO SHOW APPROXIMATE LOCATION OF EQUIPMENT·

lo tt e

BVY-21005020-D002

MECHANICAL DEMOLITION

bvy-21005020-d002

2024-01-31T06:15:29-0500

HENRY B NEWCOMB

2024-01-30T13:56:30-0500

SHREY B PATEL

ONE LINE, SCHEMATIC DIAGRAM SYMBOLS

DISCONNECT SWITCH

CONTACT, NORMALLY OPEN

CONTACT, NORMALLY CLOSED

METER

CURRENT TRANSFORMER

BUILDING GROUND

ELECTRICAL ABBREVIATIONS

AUTOMATIC TRANSFER SWITCH

POWER TRANSFORMER

XXXKVA, OWNED & MAINTAINED

BY LOCAL UTILITY

FUSED

DISCONNECT

SWITCH

CURRENT LIMITING

FUSE, SIZED AS

INDICATED

COMBINATION MAGNETIC

MOTOR STARTER &

MOLDED CASE THERMAL MAGNETIC

CIRCUIT BREAKER, POLES

AND SIZE AS INDICATED

FIRE ALARM RADIO

MASTER BOX

A A AMPERE

AC ALTERNATING CURRENT

AF AMPERE FRAME

B BCRP BACKUP

C CB CIRCUIT BREAKER

CKT CIRCUIT

C CONDUIT

D DC DIRECT CURRENT

DISC DISCONNECT

D PNL DISTRIBUTION PANEL

DT DOUBLE THROW

E EG ENGINE GENERATOR

F FSS FUSIBLE SAFETY SWITCH

FDR FEEDER

FLA FULL LOAD AMPERES

G GFM GROUND FAULT MONITOR

H HTR HEATER

K KCMIL THOUSAND CIRCULAR MILS

KV KILOVOLT

KVA KILOVOLT AMPERES

KW KILOWATT

M MDT MAIN DISTRIBUTION TERMINAL

MLO MAIN LUGS ONLY

MCB MAIN CIRCUIT BREAKER

N N NEUTRAL

NEC NATIONAL ELECTRICAL CODE

P P POLE

PF POWER FACTER

PNL PANELBOARD

S ST SHUNT TRIP

SW SWITCH

V V VOLT, VOLTAGE

VA VOLT AMPERE

W W WATT

X XFMR TRANSFORMER

MISCELLANEOUS

O PHASE

MDP

PANEL 1

DISTRIBUTION

MAIN

2 POLE, 3 WIRE

240 VAC, 30A

30A

7KW ENGINE

GENERATOR SET

240/120 VAC, 3 WIRE

2# 12, 1 #12G

FACP

ALARM

FIRE

LEVEL C-3

CAB ROOF

(240 VAC, 1 PHASE, 3 WIRE)

FAN, SP-1

PRESSURIZATION

STARTER

3 #10 & 1# 10G

3 #10, 1 #10G

TRANSFER SWITCH

AUTOMATIC

LEVEL C-2

MLO

3 PHASE, 4 WIRE

208/120VAC

CAB FLOOR

90A MLO

2# 12 & 1 #12G

PROTECTOR

SURGE

LEVEL C-1

FIRST FLOOR

(3) 1/0 AWG, (1) 6 AWG GND

IN 2" EMT

(3) 1/0 AWG, (1)#6 AWG GND

ATCT ROOFTOP HVAC UNIT

INTEGRAL CIRCUIT BREAKER

FACTORY INSTALLED

4 - 350 KCMIL, #2G

4 #2, 1 # 8G

4 #2, 1 #8G

LP

BASE BUILDING

100A MCB

(4) #2 AWG, (1) #8 AWG GND, 2"C

ADJACENT TO UTILITY J-BOX

METER LOCATED

UTILITY COMPANY

400A, MCB

2# 12 (DWG -E011, NOTE 10)

GEN

TVSS

UTILITY COMPANY

CABINET HEATER

UNIT HEATER

CAB STAIRWELL

E001

ELECTRICAL ONE-LINE DIAGRAM

ROOFTOP HVAC UNIT

BASE BUILDING

NON-FUSED DISCONNECT SWITCH

FACTORY INSTALLED

FIRST FLOOR

EUH-1WAC-1

CLOUDED AREAS INDICATES SCOPE OF WORK

EQUIPMENT ROOM

100A MCB

4 #2, 1 #8G

DC BUS

(2) 3 #10, 1 #10G

(2) 3 #12, 1 #12G

MAINTENANCE OUTLET

FIELD INSTALLED

lo tt e

-e

BVY-21005020-E001

ELECTRICAL ONE LINE DIAGRAM

bvy-21005020-e001

2024-01-31T06:17:01-0500

HENRY B NEWCOMB

2024-01-30T13:57:47-0500

SHREY B PATEL

MOUNTING: SURFACE

LOCATION: 1ST FLOOR ELECTRICAL ROOM

SERVICE: 120/208V, 3 PH, 4W

PANEL NAME: MDP

SCC RATING: 10,000 AIC

TOTAL SPACE: 30 CIRCUITS

MAIN DEVICE: 300A MCB

TOTAL:

PHASE C:

PHASE B:

PHASE A:

ASSIGNED LOAD (KVA)

CIRCUIT DESCRIPTION

OCP CKT #A B

PANEL A - 1ST FLOOR, 208V, 3PH

PANEL LP - BASE BUILDING, 208V, 3PH

LOAD (VA)

CKT # OCP A B

TOTAL LOAD EACH PANEL SIDE

TOTAL LOAD OF PANEL

PH CC

300A

120/208V, 3 PH, 4W

MODEL # I-LINE HCM

MANUFACTURER: SQD

ROOFTOP HVAC, 208V, 3P

SPACE

3P

2P

SPARE, 208V, 1PH

PANEL B - 4TH FLOOR, 208V, 3P

SPARE, 208V, 3P

PANEL C - 3RD FLOOR, 208V, 3P

LOCATION: 1ST FLOOR ELECTRICAL ROOM

PANEL NAME: PANEL A

TOTAL SPACE: 30 CIRCUITS

MAIN DEVICE: MLO

100A

120/208V, 3 PH, 4W

MODEL # NQOB

EXIT SIGNS

BATTERY CHARGER FOR EG

FIRE ALARM CONTROL PANEL

ACU (ASOS)

HEATER TAPE

ELEV SHAFT LTS

EQPT ROOM RECEPTACLES

EQPT ROOM LTS

SPARE

EG BLOCK HEATER

MOTORIZED DAMPERS

THERMOSTAT FOR HEATER #3

RECEPT - (TELCO)

OUTSIDE LIGHTS

STAIRWLL LTS/ ROTING BEACON

STAIRWELL AND EMERGENCY LTS

ELECTRIC HEATER, 208V, 3PH

GROUND FLOOR STAIRWELL

TO FIRE-LIFE-SAFETY TRANSFER SWITCH

1PH

HVAC - BATTERY/EQUIPMENT ROOM, 208V,

1PH

WALL HEATER- EQUIPMENT ROOM, 208V,

LOCATION: 4TH FLOOR

PANEL NAME: PANEL B

TOTAL SPACE: 42 CIRCUITS

MAIN DEVICE: 100A MCB BACKFED

A/C (4TH FLR EQ ROOM)

2ND AND 3RD FLOOR LTS

RECEPTACLES IN CONSOLES

OBSTRUNCTION AND EXIT FLOOD LTS

CONSOLE RECEP/ ACE IDS MONITOR

HUMIDIFIER

DALR

CAB CONVENIENCE OUTLET

20 5

20 7

20 9

20 11

20 17

20 19

30 21

20 23

20 25

33 34 20

35 36

37 38

39 40

41 42

CAMERA

CAMERA

STARS PCU/ LIGHT GUNS

RECEP UNDER RIGHT SIDE CONSOLE/

STARS DISPLAY

JUNCTION AND EMERGENCY LIGHTS

HW HEATER & EF-1

STARS/ ACE IDS BVY 2 MONITOR

ILS MONITOR PANEL PLUGMOLD

C-3 HEATER TAPE

TROUGH MOUNTED RECEP

225A

240V MAX, 3PH, 4W

MODEL # NQOD

CAB B LTS & ROOF N LTS

CAB LTS UNDER CONSOLE

STARS PCU & VIDEO RECEIVER

ACE IDS

RECEP UNDER RUGHT SIDE CONSOLE

CAB RECEP (LEFT SIDE MOULDING)

MICROWAVE

RECEP UNDER LEFT SIDE CONSOLE

MAIN BREAKER, 208V, 3PH

ELEC HTR #1 (BATHROOM), 208V, 1PH

ELECTRIC HEATER #2 C-3, 208V, 1PH

C-2A A/C UNIT (2ND FLOOR), 208V, 1PH

C-2 A/C UNIT (3RD FLOOR)

CAB RECEP(RIGHT SIDE MOULDING)

LOCATION: BASE BUILDING

PANEL NAME: PANEL LP

SCC RATING: 22,000 AIC

TOTAL SPACE: 42 CIRCUITS

MAIN DEVICE: 200A MCB

EMERGENCY LIGHT OUTLET

ASSISTANT MANAGER LIGHTS

OUTSIDE GFCI OUTLETS

SECURITY VIDEO/ DOOR LOCKS

CONFERENCE ROOM RECEPTACLE

20 5

20 7

20 9

20 11

20 23

20 25

33 34

35 36

37 38

39 40

41 42

RECEPTION AND VESTIBULE OUTLETS

HALLWAY AND LOUNGE OUTLETS

MANAGER AND ASST MGR OFFICE OUTLETS

TRAINING AND HALLWAY OUTLETS

MANAGER OFFICE LIGHTS

LIGHTS

CONFERENCE AND TRAINING ROOM

225A

240V MAX, 3PH, 4W

MODEL # NQOD

WESTINGHOUSE

MANUFACTURER: CHALLENGER/

LAVATORY LIGHTS AND FAN

LOUNGE AND LAVATORY OUTLETS

HOT WATER HEATER

EMERGENCY EXIT LIGHTS

ENTRY LOCK AND CHIMES

RECEPTION AREA LIGHTS

SPACE SPACE

208V, 3PH

BASE BUILDING ROOFTOP UNIT,

A/C HEATER

20 20

REFRIGERATOR AND LIGHTS

LOUNGE LIGHTS

LIGHTS OFFICE

A/C ROOFTOP UNIT OUTLET GFCI RECEP

THEIR OWN LOCK OUT DEVICES.

COR PRIOR TO ANY ELECTRICAL WORK. CONTRACTOR MUST SUPPLY

CONTRACTOR MUST SUBMIT A LOCK OUT TAG OUT PLAN TO THE ·

ONLY FAA PERSONNEL MAY OPERATE BREAKERS·

TO OUTAGE

COORDINATE ALL EQUIPMENT OUTAGES WITH COR, 48 HOURS PRIOR ·

BE UTILIZED DURING CONSTRUCTION

STARRED NOTES IDENTIFY FEEDERS/ CIRCUIT BREAKERS THAT WILL ·

6 8

LOCATION IDENTIFIED BY STAR #1

ELECTRICAL REQUIREMENTS TO EXISTING UNIT'S MOP AND MCA. BREAKER

UNIT FOR THE NEW ROOF TOP PACKAGHE HVAC UNIT. MATCH NEW UNIT'S

REUSE CONDUIT, CONDUCTORS, AND BREAKERS 1,3,5 FROM EXISTING HVAC 1.

MAIN DISTRIBUTION PANEL NOTES

ONLY).

BOX WITH WEATHERPROOF IN-USE BUBBLE COVER (FOR REFERENCE

GFCI DUPLEX RECEPTACLE, 20A, 120V, WR RATED, IN EXTERIOR RATED

REPLACE EXISTING HVAC MAINTENANCE RECEPTACLE WITH EXTERIOR

BREAKERS 16 IS IDENTIFIED BY STAR #10, REUSE EXISTING BREAKER. 2.

RATED (OR APPROVED EQUAL)

BREAKER WITH NEW EATON # BAB3070H, 70A, 3 POLE, BOLT-ON, HACR

ROOFTOP PACKAGE AC UNIT TO BE REPLACED. REPLACE EXISTING

BREAKERS 17, 19, AND 21 ARE IDENTIFIED BY STAR #9. BASE BUILDING 1.

PANEL "LP" NOTES

HEATER TO BE RE-USED (FOR REFERENCE ONLY).

BREAKERS 18 AND 20 ARE IDENTIFIED BY STAR #4. EXISTING CABINET WALL 3.

IDENTIFIED BY STAR #3

REQUIREMENTS TO EXISTING UNIT'S MOP AND MCA. BREAKER LOCATIONS

UNIT FOR NEW WINDOW AC UNIT. MATCH NEW UNIT'S ELECTRICAL

REUSE CONDUIT, CONDUCTORS, AND BREAKERS 2 AND 4 FROM EXISTING AC 2.

EXISTING UNIT'S MOP AND MCA. BREAKER LOCATIONS IDENTIFIED BY STAR #2

FOR NEW EUH-1. MATCH NEW UNIT'S ELECTRICAL REQUIREMENTS TO

REUSE CONDUIT, CONDUCTORS, AND BREAKERS 1 ,3, 5 FROM EXISTING EUH 1.

PANEL "A" NOTES

IDENTIFIED BY STAR #8

AC UNIT FOR NEW PTAC UNIT. MATCH NEW UNIT'S ELECTRICAL

REUSE CONDUIT, CONDUCTORS, AND BREAKERS 28 AND 30 FROM EXISTING 4.

IDENTIFIED BY STAR #7

EXISTING EUH FOR NEW EUH-2. MATCH NEW UNIT'S ELECTRICAL

REUSE CONDUIT, CONDUCTORS, AND BREAKERS 23 AND 25. FROM 3.

IDENTIFIED BY STAR #6

AC UNIT FOR NEW PTAC UNIT. MATCH NEW UNIT'S ELECTRICAL

REUSE CONDUIT, CONDUCTORS, AND BREAKERS 27 AND 29 FROM EXISTING 2.

USED (FOR REFERENCE ONLY).

BREAKER 5 IS IDENTIFIED BY STAR #5. EXISTING WINDOW AC UNIT TO BE RE-1.

PANEL "B" NOTES

:3 lo tt e

BVY-21005020-E002

ELECTRICAL PANEL SCHEDULE

bvy-21005020-e002

2024-01-31T06:17:12-0500

HENRY B NEWCOMB

2024-01-30T13:58:24-0500

SHREY B PATEL