Brand Name Determination Redacted_30Jun22.pdf
PDF 105 KB Posted
- Attached to
- NSWG8 Underwater Cameras and Accessories
- Solicitation number
- H92240-22-Q-1008
- Issued by
-
United States Special Operations Command
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED SYNOPSIS SOLICITATION_14Jul22.docx | DOCX document | |
| Attachment 2 - NSWG-8 Product List Camera Gear_14July22.xls | XLS spreadsheet | |
| Attachment 1 - Product Description NSWG-8 Camera Gear.docx | DOCX document | |
| Attachment 2 - NSWG-8 Product List Camera Gear_30Jun22.xls | XLS spreadsheet | |
| COMBINED SYNOPSIS SOLICITATION_30Jun22.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLE or LIMITED SOURCES JUSTIFICATION Determination Memorandum for Acquisitions Over $3,500 but not Exceeding the SAT
All solicitations and orders shall be competed unless a justification to limit competition using an exception in FAR Part 8, 13, or 16, as applicable to the acquisition, is approved by the Contracting Officer. When the customer describes an item or service, which limits the availability to one source or a particular brand name, there must be a technical explanation describing why only that specific one will meet the government’s requirement. Statements must be detailed and identify the harm that would come to the government (e.g. lack of capability or safety impact). The customer MUST COMPLETE all questions below, as applicable.
PURCHASE REQUEST OR REQUISITION NUMBER ESTIMATED AMOUNT
1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES AND THE INTENDED USE.
2. THE CIRCUMSTANCE THAT REQUIRED LIMITING SOURCES TO A SINGLE MANUFACTURER OR SERVICE PROVIDER. (See FAR 8.405- 6(a)(1)(i) and (b)(1) for exceptions that apply to orders under GSA schedules. See FAR 13.106-1(b)(1)(i) for open market purchase exceptions. See FAR 16.505(b)(2)(i) for exceptions that apply to orders against multiple award contracts.)
3. THE RATIONALE THAT SUPPORTS THE EXCEPTION NOTED ABOVE. (e.g., compatibility with existing equipment, specific performance criteria, proprietary data, only one capable, urgency, logical follow on, satisfy minimum guarantee, etc.).
4. IF APPLICABLE, WHY IS THE PROCUREMENT SO URGENT THAT TIME WILL NOT TO ALLOW FOR ADVERTISING?
5. STATEMENT OF ACTIONS, IF ANY, THE GOVERNMENT MAY TAKE TO REMOVE OR OVERCOME ANY BARRIERS TO COMPETITION.
CUSTOMER
CONTRACTING OFFICER
This form may be used in lieu of the determination described in FAR 8.405-6(a)(1)(i), 8.405- 6(b)(2), 13.106-1(b)(1), or 16.505(a)(4).
Customer Approval Levels Ech II ACOS/SA or Deputy Ech III Department Head or Above Ech IV CO, XO, or CMC
SEA & SEA FISHEYE DOME PORT 240
SEA & SEA COMPACT DOME PORT FOR WIDE ANG
CANON RF 24-70MM F/2.8 L IS USM ZOOM LEN
CANON EF 24-105MM F/4L IS USM LENS
Canon EOS R5 C Mirrorless Cinema Camera Sea & Sea MDX-R5 Underwater Housing for Canon EOS R5 Canon DR-E6C DC Coupler for EOS R5 C
FAR 13.106-1(b)(1)(i)
Items listed in block 1 are the only brand name parts that are operable with the existing camera system.
Products other than name brand will be incompatible with current camera gear in operation. If products are not name brand we would need to purchase an additional $20K worth of camera gear for all photography systems to work with each other.
N/A
Future procurement purchases government will consider all makes and models.
File details come from the government source that posted it. Updated .